Skip to Main Content
FlightPushFLIGHTPUSH
JO 7210.3

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. FAA Orders
  3. JO 7210.3
  4. Appendix 6
Loading
flightpush.co home
JO 7210.3 Facility Operation and Administration
  1. Chapter 1. General

    Section 1. Introduction
  2. Section 2. Order Use
  3. Chapter 2. Administration of Facilities

    Section 1. General
  4. Section 2. Responsibilities
  5. Section 3. Air Traffic Familiarization/Currency Requirements for En Route/Terminal/System Operations Facilities
  6. Section 4. Hours of Duty
  7. Section 5. Watch Coverage-Flight Service Stations
  8. Section 6. Watch Supervision-Terminal/En Route
  9. Section 7. Appearance and Security
  10. Section 8. Medical
  11. Section 9. Weather/Visibility
  12. Section 10. Wind/Altimeter Information
  13. Chapter 3. Facility Equipment

    Section 1. General
  14. Section 2. Use of Communications
  15. Section 3. Communications Procedures
  16. Section 4. Recorders
  17. Section 5. Navigational Aids
  18. Section 6. Surveillance Source Use
  19. Section 7. Video Maps
  20. Section 8. Other Displays
  21. Section 9. Color Displays-Terminal
  22. Chapter 4. Correspondence, Conferences, Records, and Reports

    Section 1. General
  23. Section 2. User Coordination/Conferences/Publicity
  24. Section 3. Letters of Agreement (LOA)
  25. Section 4. Application
  26. Section 5. Other Correspondence
  27. Section 6. Records
  28. Section 7. Reports
  29. Section 8. Freedom of Information Act (FOIA)
  30. Chapter 5. Special Flight Handling

    Section 1. Presidential Aircraft
  31. Section 2. FAA Aircraft
  32. Section 3. DOE and Other Aircraft
  33. Section 4. Other Flight Requests
  34. Section 5. 14 CFR Part 91, UAS Operations
  35. Chapter 6. En Route Operations and Services

    Section 1. General
  36. Section 2. Sector Information Binders
  37. Section 3. Operations
  38. Section 4. Services
  39. Section 5. Air Carrier Computer Interface Program
  40. Section 6. En Route Decision Support Tool (EDST)
  41. Section 7. Advanced Technologies and Oceanic Procedures (ATOP)
  42. Section 8. Reduced Vertical Separation Minimum (RVSM)
  43. Section 9. En Route Information Display System (ERIDS)
  44. Section 10. En Route Data Communications
  45. Chapter 7. En Route Data

    Section 1. Performance Checks
  46. Section 2. Deficiencies
  47. Chapter 8. NAS En Route Automation

    Section 1. General
  48. Section 2. Procedures
  49. Section 3. Displays
  50. Chapter 9. Facility Statistical Data, Reports, and Forms

    Section 1. Operational Count Data
  51. Section 2. Instrument Approach Data
  52. Section 3. Other Reports and Forms
  53. Chapter 10. Terminal Operations, Services, and Equipment

    Section 1. General
  54. Section 2. Position Binders
  55. Section 3. Operations
  56. Section 4. Services
  57. Section 5. Terminal Radar
  58. Section 6. Airport Lighting
  59. Section 7. Airport Arrival Rate (AAR)
  60. Chapter 11. FAA Contract Tower Operation and Administration

    Section 1. Organizational Responsibilities
  61. Section 2. Operations and Staffing
  62. Section 3. Training
  63. Section 4. Documents, Forms, and Charts
  64. Section 5. Operational Documents, Directives, and Regulations
  65. Chapter 12. National Programs

    Section 1. Terminal VFR Radar Services
  66. Section 2. Data Recording and Retention
  67. Section 3. VFR Flyway Planning Chart Program
  68. Section 4. Helicopter Route Chart Program
  69. Section 5. VFR Transition Route Program
  70. Section 6. Standard Terminal Automation Replacement System (STARS)
  71. Section 7. Safety Logic Systems Operations Supervisor/CIC Procedures
  72. Section 8. VFR Waypoint Chart Program
  73. Section 9. Low Altitude Authorization Notification Capability
  74. Section 10. UAS Facility Maps (UASFM)
  75. Section 11. UAS Operations at Towered Airports
  76. Chapter 13. Facility Statistical Data, Reports, and Forms

    Section 1. General Information
  77. Section 2. Itinerant Operations
  78. Section 3. Local Operations
  79. Section 4. Overflight Operations
  80. Section 5. Amending and Reviewing Data
  81. Chapter 14. Flight Service Operations and Services

    Section 1. General
  82. Section 2. Position/Service Information Binders
  83. Section 3. Operations
  84. Section 4. Services
  85. Chapter 15. Aviation Meteorological Services and Equipment

    Section 1. General
  86. Section 2. Pilot Weather Briefing
  87. Section 3. Broadcasts
  88. Chapter 16. Equipment

    Section 1. General
  89. Section 2. Frequencies
  90. Chapter 17. Facility Statistical Data, Reports, and Forms (Alaska Only)

    Section 1. General Information
  91. Section 2. Aircraft Contacted
  92. Section 3. Flight Plan Count
  93. Section 4. Pilot Briefing Count
  94. Section 5. Other Reports and Information
  95. Section 6. FSS Lists, Logs, and Tallies (OASIS)
  96. Chapter 18. Traffic Management National, Center, and Terminal

    Section 1. Organizational Missions
  97. Section 2. Organizational Responsibilities
  98. Section 3. Line of Authority
  99. Section 4. Supplemental Duties
  100. Section 5. Coordination
  101. Section 6. Trajectory‐Based Operations (TBO)
  102. Section 7. Traffic Management Initiatives
  103. Section 8. Flow Evaluation Area (FEA), Flow Constrained Area (FCA), and Integrated Collaborative Rerouting (ICR)
  104. Section 9. Monitor Alert Parameter
  105. Section 10. Ground Delay Programs
  106. Section 11. Airspace Flow Programs (AFP)
  107. Section 12. Collaborative Trajectory Options Program (CTOP)
  108. Section 13. Ground Stop(s)
  109. Section 14. Special Traffic Management Programs
  110. Section 15. Severe Weather Management
  111. Section 16. Severe Weather Avoidance Plan (SWAP)
  112. Section 17. Preferred IFR Routes Program
  113. Section 18. North American Route Program
  114. Section 19. Coded Departure Routes
  115. Section 20. Route Advisories
  116. Section 21. Operations Plan
  117. Section 22. National Playbook
  118. Section 23. Traffic Management (TM) Support of Non‐Reduced Vertical Separation Minima (RVSM) Aircraft
  119. Section 24. Route Test
  120. Section 25. Time‐Based Flow Management (TBFM)
  121. Section 26. Weather Management
  122. Chapter 19. Waivers, Authorizations, and Exemptions

    Section 1. Regulatory Waivers and Authorizations
  123. Section 2. Elimination of Fixed‐Wing Special Visual Flight Rules Operations
  124. Section 3. Current Authorizations and Exemptions from Title 14, Code of Federal Regulations
  125. Section 4. Parachute Jump Operations
  126. Section 5. Moored Balloons, Kites, Parasail, Unmanned Rockets, and Unmanned Free Balloons/Objects
  127. Section 6. 14 CFR Part 107, sUAS Operations
  128. Section 7. Procedural Waivers
  129. Chapter 20. Temporary Flight Restrictions (TFRs)

    Section 1. General Information
  130. Section 2. Temporary Flight Restrictions for Unmanned Aircraft (49 U.S.C. Section 44812)
  131. Section 3. Temporary Flight Restrictions in the Vicinity of Disaster/Hazard Areas (14 CFR Section 91.137)
  132. Section 4. Temporary Flight Restrictions in National Disaster Areas in the State of Hawaii (Section 91.138)
  133. Section 5. Emergency Air Traffic Rules (14 CFR Section 91.139)
  134. Section 6. Flight Restrictions in the Proximity of the Presidential and Other Parties (14 CFR Section 91.141)
  135. Section 7. Flight Limitation in the Proximity of Space Flight Operations (14 CFR Section 91.143)
  136. Section 8. Management of Aircraft Operations in the Vicinity of Aerial Demonstrations and Major Sporting Events (14 CFR Section 91.145)
  137. Chapter 21. Operations Security: Tactical, Special, and Strategic

    Section 1. Organizational Missions
  138. Section 2. Responsibilities
  139. Section 3. Operational Line of Authority
  140. Section 4. Supplemental Duties
  141. Section 5. Coordination
  142. Section 6. Special Security Instruction (SSI) (14 CFR Section 99.7)
  143. Section 7. Security Notice (SECNOT)
  144. Appendices

    Appendix 1. [RESERVED]
  145. Appendix 2. [RESERVED]
  146. Appendix 3. Air Carrier Aircraft for Air Traffic Activity Operations Count
  147. Appendix 4. Glideslope Outage Authorization Request
  148. Appendix 5. Checklist for Reported Headset Tone Incidents
  149. Appendix 6. Space LOA Sample Templates
    1. Instructions for Letter of Agreement Template: Launch and Reentry Operator
    2. Attachments
    3. Attachment B: Points of Contact Table
    4. Attachment C: Actions Timetable
    5. Instructions for Letter of Agreement Template: Launch and Reentry Site
    6. [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator]
    7. [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator]
    8. [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator]
    9. Attachment B: Points of Contact Table
    10. Instructions for Letter of Agreement Template: Federal Range
    11. Responsibilities:
    12. Restrictions to Operations
    13. [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator]
    14. [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator]
    15. Attachment B: Points of Contact Table example

JO 7210.3 Facility Operation and Administration|JO 7210.3EE · Change 3 · Effective 7/9/2026

Appendix 6

Space LOA Sample Templates

Instructions for Letter of Agreement Template: Launch and Reentry Operator

[Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Operator] Letter of Agreement

Effective:

Subject: Coordination of [Operator] Launch/Reentry Operations from [name and location of Launch and (if applicable) Reentry site]

Purpose: State the purpose of the Letters of Agreement (LOA), type of operation (launch, launch with reentry), and location of operation (name and location of launch and (if applicable) Reentry site). If LOA is for a one‐time operation, state that.

Sample text: This Letters of Agreement (LOA) provides procedures for the integration and appropriate coordination of [licensed/permitted] [Vehicle Type: horizontal/vertical] [launch/launch with reentry/hover‐test] operations into the National Airspace System (NAS) from [name and location of launch and (if applicable) Reentry site].

Cancellation: Include any previous LOA canceled by this one [Subject and Effective Date of LOA being canceled].

State agreement to review LOA annually.

Sample text: This LOA will remain in effect until canceled by any signatory entity and will be reviewed annually throughout the life of the [license/permit] or when modifications are made to the [license/permit].

Scope: List the pertinent ATC facilities, Operator, and any additional stakeholders, including ATO Space Operations, Federal Ranges, and military facilities as applicable. State distribution of the LOA. The distribution should include, at a minimum, all signatories and the Office of Commercial Space Transportation (AST).

Sample Text: This LOA is pertinent to [ATC facilities], [additional stakeholders], and [Operator]. It is to be distributed to all signatories and stakeholders].

Responsibilities: State the responsibilities of the Operator, Controlling Facility, and as needed, any other stakeholders and/or affected facilities.

a. Operator must fulfill requirements provided in the Sample Text for this section.

b. Controlling Facility must fulfill requirements provided in the Sample Text for this section and

1. Fill out the Points of Contact Table (Attachment B).

2. Fill out the Actions Timetable (Attachment C).

c. (As needed) Other stakeholders and affected facilities must:

1. Ensure appropriate personnel are aware of the provisions of this agreement.

Sample text for Operator:

a. [Operator] must:

1. Ensure all Operator [and their designees] personnel operating within the scope of this agreement are knowledgeable of, understand, and comply with the provisions of this agreement.

2. Establish, make available, and be prepared to execute approved contingency plan(s).

a) Unless an established contingency plan has been approved by all necessary parties, [Operator] must coordinate requirements and get approval from [Controlling Facility] for contingency plan(s) at least [XX] calendar days prior to each operation.

3. Follow the procedures in Section 5 and the Action Timetable (Attachment C) with regards to communications and notifications.

4. Notify the parties in the Points of Contact Table (Attachment B) immediately if scheduled operations are canceled.

5. (As needed) Develop separate agreements with foreign Air Navigation Service Providers when airspace coordination outside of the U.S. Flight Information Region is needed for the operation.

Sample text for Controlling Facility:

b. [Controlling Facility] must:

1. Ensure all personnel responsible for providing air traffic service within the scope of this agreement are knowledgeable of, understand, and comply with the provisions of this agreement. This includes notification to other affected facilities.

2. Ensure appropriate [Controlling Facility] personnel are aware of and prepared to execute approved contingency plan(s).

3. Communicate with necessary facilities and ascertain their readiness to execute approved contingency plan(s).

4. Except when real time notifications of actual start of activity and end of activity times are provided to the facility via ATO Space Operations coordination, take appropriate actions to restrict airspace use during the effective times of the aircraft hazard area(s).

5. Take additional measures for public safety deemed necessary by 14 CFR parts 400-460.

Sample text as needed:

c. (As needed) [Other stakeholders and affected facilities] must:

1. Ensure appropriate personnel are aware of the provisions of this agreement.

2. Ensure appropriate personnel are aware of and prepared to execute approved contingency plan(s).

d. Deviations from responsibilities and/or procedures established in this LOA must be coordinated prior to each operation, and responsibilities must be clearly defined in each case.

Procedures: Specify timeline and details for activities to take place prior to, during, and upon completion of operation. Specify frequency of proposed operations and any limitations when considering dates and times of operations. Include any restrictions on days of week and/or times of day operations that may or may not occur. Restrictions may include times when military operations require use of certain airspace. Specify procedure(s) for handling anomalies and emergencies. Information conveyed should include the location of event (latitude and longitude, represented as degree-minute-second) (when available), vehicle state, projected time the hazard will no longer be present, and any other pertinent details.

Sample text:

a. [Operator] must:

1. Provide a Launch/Reentry Forecast Package to the parties specified in the Points of Contact Table (Attachment B), except Central Altitude Reservation Function (CARF), at least once every [XX] months. These forecasts will include a best estimate of all anticipated launches for the upcoming [XX] months.

2. Provide [Controlling Facility] a pre‐planning package a minimum of [XX] calendar days prior to the planned operation. At a minimum, the package should include:

a) The launch/reentry window.

b) The best estimate of the geographic definition of the hazard area(s) (latitude and longitude, represented as degree-minute-second) (when available) for the primary date and any back‐up date(s).

c) (As needed) Any support aircraft's type and call sign.

3. (As needed) Submit Altitude Reservation (ALTRV) request(s) to CARF (and email a copy of the request to the [Controlling Facility]) a minimum of [XX] days prior to the planned operation.

4. Verify the issuance of the appropriate NOTAMs.

5. No less than [XX] minutes in advance of a planned operation, notification will be given by [Operator] to [Controlling Facility] of intent for the [launch/hover‐test] to take place.

6. During the operation, a [Operator] representative must participate on an FAA Hotline teleconference with [Controlling Facility] and ATO Space Operations (see Actions Timetable, Attachment C, for phone number). Communication on the FAA Hotline teleconference must be established no less than [XX] minutes prior to planned operation.

a) The [Operator] representative must be able to provide real‐time verbal indications of the status of the operation, its progress along the launch/reentry trajectory, and occurrence of significant events.

b) Participation by representative(s) from [other stakeholders and affected facilities] is advised.

7. Notify [Controlling Facility] upon completion of the operation.

8. (As needed) Contact CARF and request that the appropriate ALTRVs be canceled.

9. In the event of an anomaly, a [Operator] representative must immediately notify [Controlling Facility], via FAA Hotline teleconference, of the occurrence of the anomaly. Information communicated should include, at a minimum:

a) The last known state of the vehicle.

b) The location of the off‐nominal event (latitude and longitude, represented as degree-minute-second) (when available).

c) The predicted location(s) impacted (latitude and longitude, represented as degree-minute-second) (when available).

d) Projected time the hazard(s) will no longer be present (when known).

e) Other information that will provide estimated positions of hazards.

10. In the event of an emergency, [Operator] must immediately contact [Controlling Facility], via FAA Hotline teleconference and email all the parties listed in the Points of Contact Table (Attachment B). Information conveyed should include, at a minimum:

a) The last known state of the vehicle.

b) The location of the event (latitude and longitude, represented as degree-minute-second) (when available).

c) The predicted location(s) impacted (latitude and longitude, represented as degree-minute-second) (when available).

d) Projected time the hazard(s) will no longer be present (when known).

e) Other information that will provide estimated positions of hazards.

b. [Controlling Facility]:

1. Upon notification of a completed operation, [Controlling Facility] must cancel appropriate airspace restrictions and/or NOTAMs.

2. In the event when [Controlling Facility] becomes aware of a condition that would make the launch/reentry unsafe, [Controlling Facility] must immediately contact, via FAA Hotline, [Operator] and all other parties listed in the Points of Contact Table (Attachment B).

Attachments

a. Signatures

b. Points of Contact Table

c. Actions Timetable

d. Only include graphics that are applicable to this scenario:

• Launch/Reentry Site Description/Map

• Aircraft Hazard Area Description/Map

• Temporary Flight Restriction Description/Map

• Air Traffic Control Assigned Airspace Description/Map

e. Commercial Launch/Reentry Site LOA

Attachment A: Signatures ______________________ ______________________

[Controlling Facility] [Operator] ______________________

[ATO Space Operations]

______________________

[as appropriate, other stakeholders, including Federal Ranges and military facilities]

Attachment B: Points of Contact Table

The following table should be completed by the [Controlling Facility] and the information should be verified prior to every operation.

OfficePhone #EmailResponsibility
[Operator]
[Controlling Facility] Supervisor in Charge
[Controlling Facility] Traffic Management Unit
ATO Space Operations
Central Altitude Reservation Function (CARF)
National Traffic Management Office (NTMO)

Attachment C: Actions Timetable

The following table should be completed by [Controlling Facility]. In coordination with the [Controlling Facility], [Operator] must ensure that the following actions are completed at the defined intervals.

TimeEventRemarksDateCompleted
T – [XX] monthsSuggestion:T – 6 monthsSubmit Launch/reentry Forecast PackageOperator should provide best estimate of all known launch/reentry dates for upcoming six months.
T – [XX] calendar daysSuggestion:T – 30 – 60 calendar daysCoordinate launch/reentry corridor/hazard area(s)Operator should coordinate with ATO Space Operations and as appropriate, other affected facilities.
T – [XX] calendar daysSuggestion:T – 10 calendar daysSubmit Pre‐Planning PackageOperator should provide a description of the Aircraft Hazard Area(s), along with date(s) and time(s) for launch/reentry.
T – [XX] calendar daysSuggestion:T – 5 - 14 calendar daysFile an Altitude Reservation (ALTRV) request with CARF (as needed)Operator is responsible for coordinating all necessary ALTRV requests. Requests should be submitted via email to ___________@FAA.gov A copy of the request should also be emailed to [Controlling Facility].Contact:
T – [XX] hoursVerify issuance of appropriate airspace notices (NOTAMs and TFRs)Operator should contact [Controlling Facility] for issuance of TFR(s) and NOTAM(s) (as needed).Per 14 CFR § 91.143, TFRs need to be issued at least ___ hours in advance of the scheduled operation.
T – [XX] hours and repeat again atT – [XX] hoursSuggestion: T – 24 hours and 3 hoursProvide operational status reportOperator contacts [Controlling Facility] via [telephone/email] and provides operational status report, which includes confirmation of intent and specifics of operation.
T – [XX] minutesSuggestion:T – 60 - 30 minutesEstablish Hotline connection[FAA Hotline telephone #]The operation will be delayed or terminated if the Operator does not establish communications via FAA Hotline teleconference.Operator must have a representative on the FAA Hotline teleconference until the operation is complete.
T – [XX] minutesSuggestion: T – 30 minutesProvide operational status reportOperator provides operational status report. This report includes confirmation that the operation will take place as scheduled.As necessary, Operator should continue to communicate any significant operational changes.
T – [XX] minutes and repeat at T – [XX] minutesSuggestion: T – 10 minutes and T – 5 minutesReceive final clearance or confirmation of continued approved mission statusOperator must receive clearance or confirmation of continued approved mission status from [Controlling Facility] to proceed with operation.
During operationMaintain real‐time communication via FAA Hotline teleconferenceOperator must provide real‐time verbal indications on the status of the vehicle.
Post‐operation or mission cancellationNotify ATC and CARF (if applicable) of completion or cancellation of operationATC must be notified when operation is complete. TFR(s), ALTRV(s), and any other necessary notices should be canceled as soon as practicable.
Schedule post‐operation debriefA debrief should occur ideally within __ hours, but no later than __ hours of the completion of the operation. A debrief should be conducted even if no off-nominal activity occurred.

Instructions for Letter of Agreement Template: Launch and Reentry Site

Letter of Agreement

Effective:

Subject: Operations at [Name and location of Launch and Reentry Site]

Purpose: State the purpose of the Letters of Agreement (LOA), type(s) of anticipated operation (if launch: [horizontal/vertical]) [launch/reentry], frequency of proposed operation(s) (if known), and name and location of Launch and Reentry Site.

Sample text: This LOA establishes a framework for the coordination and planning of procedures for [licensed/permitted] (if launch: [horizontal/vertical]) [launch/reentry] operations into the National Airspace System from [name and location of Launch and Reentry Site].

Cancellation: Include any previous LOA canceled by this one [Subject and Effective Date of LOA being canceled]. State agreement to review LOA annually.

Sample text: This LOA will remain in effect until canceled by any signatory entity and will be reviewed annually throughout the life of the license or when modifications are made to the license.

Scope: List the affected ATC facilities; Launch/Reentry Site Operator; and any additional stakeholders, including ATO Space Operations, Federal Ranges, and military facilities, as applicable. State that this LOA does not guarantee the approval of operations from the Launch and Reentry Site. Once a Vehicle Operator has been identified and its operations approved, responsibilities and procedures will be outlined in a separate letter of agreement with each Vehicle Operator. State that this LOA does not confer any proprietary, property, or exclusive right in the use of airspace or outer space referenced in Code of Federal Regulation (CFR) 420.41. State distribution of the LOA. The distribution should include, at a minimum, all signatories.

Sample text: This LOA is pertinent to [ATC facilities and stakeholders; including ATO Space Operations] and [Launch/Reentry Site Operator]. It does not guarantee the approval of operations from the Launch/Reentry Site. Once a Vehicle Operator has been identified and its operations approved, responsibilities and procedures will be outlined in a separate LOA with each Vehicle Operator.

This LOA does not confer any proprietary, property, or exclusive right in the use of airspace or outer space referenced in Code of Federal Regulation (CFR) 420.41.

This LOA is to be distributed to the signatories, additional stakeholders, and the Office of Commercial Space Transportation (AST).

Responsibilities: State the responsibilities of the Site Operator, Controlling Facility, and as needed, any other stakeholders and/or affected facilities. All parties named within this letter of agreement will work collaboratively to develop the following:

a. Procedures for notification and scheduling of operations, to include procedures for the issuance of Notices to Airmen, Altitude Reservations and Special Activity Airspace access.

b. Plans for communication between the operator and the FAA as necessary, before, during, and after a scheduled operation.

[Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator]

c. Plans and procedures for cancellations, contingencies, and emergencies.

d. Plans and procedures for any other measures deemed necessary by the FAA to ensure public health and safety.

Sample text:

a. [Launch/Reentry Site Operator] is responsible for the management, operation, and maintenance of the Launch/Reentry Site. This includes the coordination with users of its facility and the responsibility for ensuring all necessary information regarding operations is provided to the appropriate ATC facilities.

b. The FAA is responsible for the safe, orderly, and expeditious flow of known air traffic under its control. It is also responsible for the dissemination of pertinent information to the aviation community.

c. All parties named in this LOA will work collaboratively to develop procedures and other such measures deemed necessary to protect public health and safety.

Attachments State the responsibilities of the Site Operator, Controlling Facility, and as needed, any other stakeholders and/or affected facilities. All parties named within this letter of agreement will work collaboratively to develop the following:

A. Signatures

B. Points of Contact Table

C. Graphics/Maps

• Physical Site Description/Map

• Airspace Description/Map(s)

[Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator]

Attachment A: Signatures ______________________ ______________________

[Controlling Facility] [Launch/Reentry Site Operator] ______________________

[ATO Space Operations]

______________________

[As appropriate, other stakeholders, including Federal Ranges and military facilities.]

[Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator]

Attachment B: Points of Contact Table

The following table should be completed by the [Controlling Facility] and the information should be verified prior to every operation.

OfficePhone #EmailResponsibility
[Controlling Facility] Airspace and Procedures Office
[Controlling Facility] Traffic Management Unit
ATO Space Operations
[Launch and Reentry Site Operator]

Instructions for Letter of Agreement Template: Federal Range

Letter of Agreement

Effective:

Subject: Operations at [Name of Federal Range]

Purpose: State the purpose of the Letters of Agreement (LOA), name of Federal range. Facilities and stakeholders included in LOA.

Sample text: This LOA establishes a framework for the coordination and planning of procedures for launch and reentry operations into the National Airspace System (NAS) from [name of Federal Range]. The following describes responsibilities and requirements for [list included facilities and stakeholders].

Cancellation: Include any previous LOA canceled by this one [Subject and Effective Date of LOA being canceled]. State agreement to review LOA annually.

Sample text: This agreement cancels the [Subject and effective date of LOA being canceled].

This LOA will remain in effect until canceled by any signatory entity and will be reviewed annually or when modifications are required.

Scope: List the affected ATC facilities; Federal Range site Operator; and any additional stakeholders, including ATO Space Operations, and military facilities, as applicable. State distribution of the LOA. The distribution should include, at a minimum, all signatories.

Sample text: This LOA is pertinent to [ATC facilities and stakeholders, including ATO Space Operations] and [Federal range]. It does not guarantee the approval of operations from the [Federal range] This LOA does not confer any proprietary, property, or exclusive right in the use of airspace or outer space referenced in Code of Federal Regulation (CFR) 420.41.

This LOA is to be distributed to the signatories, additional stakeholders, and the Office of Commercial Space Transportation (AST).

Responsibilities:

State the responsibilities of the [Federal range], Controlling Facility, and as needed, any other stakeholders and/or affected facilities. All parties named within this letter of agreement will work collaboratively to develop the following:

a. Procedures for notification and scheduling of operations, to include procedures for the issuance of Notices to Airmen, Altitude Reservations and Special Activity Airspace access.

b. Plans for communication between the [Federal range] and the FAA as necessary, before, during, and after a scheduled operation.

[Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator]

c. Plans and procedures for cancellations, contingencies, and emergencies.

d. Plans and procedures for any other measures deemed necessary by the FAA to ensure public health and safety.

Sample text:

a. [Federal range] is responsible for the management, operation, and maintenance of all facilities and equipment at [Federal range]. This responsibility includes the coordination with users of its facility and the responsibility for ensuring all necessary information regarding operations is provided to the appropriate ATC facilities.

b. The FAA is responsible for the safe, orderly, and expeditious flow of known air traffic under its control. It is also responsible for the dissemination of pertinent information to the aviation community.

c. All parties named in this LOA will work collaboratively to develop procedures and other such measures deemed necessary to protect public health and safety.

Restrictions to Operations

List any constraint to operations from Federal range.

Sample text:

a. None; Or

a. No launch or recovery operations between sunset and sunrise.

b. Launch vehicles limited to a max launch weight of 11,000,000 pounds.

Attachments Must include at a minimum A. and B. but not limited to.

A. Signatures

B. Points of Contact Table

(examples of additional attachments)

• Physical Site Description/Map

• Airspace Description/Map(s)

• Launch/Reentry Site Description/Map

• Aircraft Hazard Area Description/Map

• Temporary Flight Restriction Description/Map

• Air Traffic Control Assigned Airspace Description/Map

• Action Timetable

[Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator]

Attachment A: Signatures ______________________

[Controlling Facility] ______________________

[Federal Range] ______________________

[ATO Space Operations]

______________________

[As appropriate, other stakeholders and military facilities.]

[Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator]

Attachment B: Points of Contact Table example

OfficePhone #EmailResponsibility
[Operator]
[Controlling Facility] Supervisor in Charge
[Controlling Facility] Traffic Management Unit
ATO Space Operations
Central Altitude Reservation Function (CARF)
National Traffic Management Office (NTMO)

Referenced in This Section

14 CFR 91.143
Previous AppendixAppendix 5. Checklist for Reported Headset Tone Incidents

You Are Reading

Instructions for Letter of Agreement Template: Launch and Reentry Operator