JO 7210.3 Facility Operation and AdministrationJO 7210.3EE · Change 3 · Effective 7/9/2026
Appendix 4
Glideslope Outage Authorization Request
| Request for Authorization to Conduct Simultaneous Independent Approacheswith Glideslope Out After 29 Days | |
|---|---|
| Submit via Email to:AJV-P 9-AJV-P-HQ-Correspondence@faa.gov | |
| Section 1 | |
| Facility Identification: (KXYZ) | |
| Runway (###) Glideslope OTS: | |
| Dates of Expected Outage:(xx/xx/xx to xx/xx/xx) | |
| Reason Glideslope is OTS: | |
| Section 2 | |
| (Simultaneous) Approaches Impacted: | |
| Runway Usage Percentage: | |
| IFR Limits/Weather Minimum: | |
| RNAV Capability/Equipage: | |
| Peak IFR Airport Arrival Rate: | |
| Section 3 | |
| Impact if Authorization is Not Granted: | |
| Facility Manager must include a narrative of the operational impact if continuation of this procedure is not approved. | |
| Section 4 | |
| Attach a copy of the facility Contingency Authorization for Glideslope Out Procedures. | |