Skip to Main Content
FlightPushFLIGHTPUSH
Chapter 10

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. FAA Orders
  3. JO 7210.3
  4. Chapter 10
  5. Section 1
Loading
flightpush.co home
JO 7210.3 Facility Operation and Administration
  1. Chapter 1. General

    Section 1. Introduction
  2. Section 2. Order Use
  3. Chapter 2. Administration of Facilities

    Section 1. General
  4. Section 2. Responsibilities
  5. Section 3. Air Traffic Familiarization/Currency Requirements for En Route/Terminal/System Operations Facilities
  6. Section 4. Hours of Duty
  7. Section 5. Watch Coverage-Flight Service Stations
  8. Section 6. Watch Supervision-Terminal/En Route
  9. Section 7. Appearance and Security
  10. Section 8. Medical
  11. Section 9. Weather/Visibility
  12. Section 10. Wind/Altimeter Information
  13. Chapter 3. Facility Equipment

    Section 1. General
  14. Section 2. Use of Communications
  15. Section 3. Communications Procedures
  16. Section 4. Recorders
  17. Section 5. Navigational Aids
  18. Section 6. Surveillance Source Use
  19. Section 7. Video Maps
  20. Section 8. Other Displays
  21. Section 9. Color Displays-Terminal
  22. Chapter 4. Correspondence, Conferences, Records, and Reports

    Section 1. General
  23. Section 2. User Coordination/Conferences/Publicity
  24. Section 3. Letters of Agreement (LOA)
  25. Section 4. Application
  26. Section 5. Other Correspondence
  27. Section 6. Records
  28. Section 7. Reports
  29. Section 8. Freedom of Information Act (FOIA)
  30. Chapter 5. Special Flight Handling

    Section 1. Presidential Aircraft
  31. Section 2. FAA Aircraft
  32. Section 3. DOE and Other Aircraft
  33. Section 4. Other Flight Requests
  34. Section 5. 14 CFR Part 91, UAS Operations
  35. Chapter 6. En Route Operations and Services

    Section 1. General
  36. Section 2. Sector Information Binders
  37. Section 3. Operations
  38. Section 4. Services
  39. Section 5. Air Carrier Computer Interface Program
  40. Section 6. En Route Decision Support Tool (EDST)
  41. Section 7. Advanced Technologies and Oceanic Procedures (ATOP)
  42. Section 8. Reduced Vertical Separation Minimum (RVSM)
  43. Section 9. En Route Information Display System (ERIDS)
  44. Section 10. En Route Data Communications
  45. Chapter 7. En Route Data

    Section 1. Performance Checks
  46. Section 2. Deficiencies
  47. Chapter 8. NAS En Route Automation

    Section 1. General
  48. Section 2. Procedures
  49. Section 3. Displays
  50. Chapter 9. Facility Statistical Data, Reports, and Forms

    Section 1. Operational Count Data
  51. Section 2. Instrument Approach Data
  52. Section 3. Other Reports and Forms
  53. Chapter 10. Terminal Operations, Services, and Equipment

    Section 1. General
    1. 10-1-1 OPERATING POSITION DESIGNATORS
    2. 10-1-2 TOWER/RADAR TEAM CONCEPTS
    3. 10-1-3 MILITARY ATC BOARDS
    4. 10-1-4 SECTIONAL AERONAUTICAL, TERMINAL AREA, AND OTHER CHARTS
    5. 10-1-5 AREAS OF NONVISIBILITY
    6. 10-1-6 SELECTING ACTIVE RUNWAYS
    7. 10-1-7 USE OF ACTIVE RUNWAYS
    8. 10-1-8 PROCEDURES FOR OPENING AND CLOSING RUNWAYS
    9. 10-1-9 FLIGHT PROGRESS STRIP USAGE
    10. 10-1-10 LOW VISIBILITY OPERATIONS
    11. 10-1-11 MOBILE CONTROL TOWERS
    12. 10-1-12 PARTICIPATION IN LOCAL AIRPORT DEICING PLAN (LADP)
    13. 10-1-13 PRECISION OBSTACLE FREE ZONE (POFZ)
  54. Section 2. Position Binders
  55. Section 3. Operations
  56. Section 4. Services
  57. Section 5. Terminal Radar
  58. Section 6. Airport Lighting
  59. Section 7. Airport Arrival Rate (AAR)
  60. Chapter 11. FAA Contract Tower Operation and Administration

    Section 1. Organizational Responsibilities
  61. Section 2. Operations and Staffing
  62. Section 3. Training
  63. Section 4. Documents, Forms, and Charts
  64. Section 5. Operational Documents, Directives, and Regulations
  65. Chapter 12. National Programs

    Section 1. Terminal VFR Radar Services
  66. Section 2. Data Recording and Retention
  67. Section 3. VFR Flyway Planning Chart Program
  68. Section 4. Helicopter Route Chart Program
  69. Section 5. VFR Transition Route Program
  70. Section 6. Standard Terminal Automation Replacement System (STARS)
  71. Section 7. Safety Logic Systems Operations Supervisor/CIC Procedures
  72. Section 8. VFR Waypoint Chart Program
  73. Section 9. Low Altitude Authorization Notification Capability
  74. Section 10. UAS Facility Maps (UASFM)
  75. Section 11. UAS Operations at Towered Airports
  76. Chapter 13. Facility Statistical Data, Reports, and Forms

    Section 1. General Information
  77. Section 2. Itinerant Operations
  78. Section 3. Local Operations
  79. Section 4. Overflight Operations
  80. Section 5. Amending and Reviewing Data
  81. Chapter 14. Flight Service Operations and Services

    Section 1. General
  82. Section 2. Position/Service Information Binders
  83. Section 3. Operations
  84. Section 4. Services
  85. Chapter 15. Aviation Meteorological Services and Equipment

    Section 1. General
  86. Section 2. Pilot Weather Briefing
  87. Section 3. Broadcasts
  88. Chapter 16. Equipment

    Section 1. General
  89. Section 2. Frequencies
  90. Chapter 17. Facility Statistical Data, Reports, and Forms (Alaska Only)

    Section 1. General Information
  91. Section 2. Aircraft Contacted
  92. Section 3. Flight Plan Count
  93. Section 4. Pilot Briefing Count
  94. Section 5. Other Reports and Information
  95. Section 6. FSS Lists, Logs, and Tallies (OASIS)
  96. Chapter 18. Traffic Management National, Center, and Terminal

    Section 1. Organizational Missions
  97. Section 2. Organizational Responsibilities
  98. Section 3. Line of Authority
  99. Section 4. Supplemental Duties
  100. Section 5. Coordination
  101. Section 6. Trajectory‐Based Operations (TBO)
  102. Section 7. Traffic Management Initiatives
  103. Section 8. Flow Evaluation Area (FEA), Flow Constrained Area (FCA), and Integrated Collaborative Rerouting (ICR)
  104. Section 9. Monitor Alert Parameter
  105. Section 10. Ground Delay Programs
  106. Section 11. Airspace Flow Programs (AFP)
  107. Section 12. Collaborative Trajectory Options Program (CTOP)
  108. Section 13. Ground Stop(s)
  109. Section 14. Special Traffic Management Programs
  110. Section 15. Severe Weather Management
  111. Section 16. Severe Weather Avoidance Plan (SWAP)
  112. Section 17. Preferred IFR Routes Program
  113. Section 18. North American Route Program
  114. Section 19. Coded Departure Routes
  115. Section 20. Route Advisories
  116. Section 21. Operations Plan
  117. Section 22. National Playbook
  118. Section 23. Traffic Management (TM) Support of Non‐Reduced Vertical Separation Minima (RVSM) Aircraft
  119. Section 24. Route Test
  120. Section 25. Time‐Based Flow Management (TBFM)
  121. Section 26. Weather Management
  122. Chapter 19. Waivers, Authorizations, and Exemptions

    Section 1. Regulatory Waivers and Authorizations
  123. Section 2. Elimination of Fixed‐Wing Special Visual Flight Rules Operations
  124. Section 3. Current Authorizations and Exemptions from Title 14, Code of Federal Regulations
  125. Section 4. Parachute Jump Operations
  126. Section 5. Moored Balloons, Kites, Parasail, Unmanned Rockets, and Unmanned Free Balloons/Objects
  127. Section 6. 14 CFR Part 107, sUAS Operations
  128. Section 7. Procedural Waivers
  129. Chapter 20. Temporary Flight Restrictions (TFRs)

    Section 1. General Information
  130. Section 2. Temporary Flight Restrictions for Unmanned Aircraft (49 U.S.C. Section 44812)
  131. Section 3. Temporary Flight Restrictions in the Vicinity of Disaster/Hazard Areas (14 CFR Section 91.137)
  132. Section 4. Temporary Flight Restrictions in National Disaster Areas in the State of Hawaii (Section 91.138)
  133. Section 5. Emergency Air Traffic Rules (14 CFR Section 91.139)
  134. Section 6. Flight Restrictions in the Proximity of the Presidential and Other Parties (14 CFR Section 91.141)
  135. Section 7. Flight Limitation in the Proximity of Space Flight Operations (14 CFR Section 91.143)
  136. Section 8. Management of Aircraft Operations in the Vicinity of Aerial Demonstrations and Major Sporting Events (14 CFR Section 91.145)
  137. Chapter 21. Operations Security: Tactical, Special, and Strategic

    Section 1. Organizational Missions
  138. Section 2. Responsibilities
  139. Section 3. Operational Line of Authority
  140. Section 4. Supplemental Duties
  141. Section 5. Coordination
  142. Section 6. Special Security Instruction (SSI) (14 CFR Section 99.7)
  143. Section 7. Security Notice (SECNOT)
  144. Appendices

    Appendix 1. [RESERVED]
  145. Appendix 2. [RESERVED]
  146. Appendix 3. Air Carrier Aircraft for Air Traffic Activity Operations Count
  147. Appendix 4. Glideslope Outage Authorization Request
  148. Appendix 5. Checklist for Reported Headset Tone Incidents
  149. Appendix 6. Space LOA Sample Templates

JO 7210.3 Facility Operation and Administration|JO 7210.3EE · Change 3 · Effective 7/9/2026

Chapter 10 · Section 1

General

13 Paragraphs|10-1-1–10-1-13

Read Citation (on FlightPush)

10-1-1 OPERATING POSITION DESIGNATORS

a.

The following designators may be used to identify operating positions in a terminal. (See TBL 10-1-1.)

TBL 10-1-1 Operating Position Designators

DesignatorPosition
1.ADArrival Data (Radar)
2.APApproach Control
3.ARArrival Control (Radar)
4.CCCoordinator (Tower)
5.CDClearance Delivery
6.CICoordinator (Radar)
7.DCDeparture Control
8.DDDeparture Data (Radar)
9.DRDeparture Control (Radar)
10.ENFlight Service
11.FDFlight Data
12.GCGround Control
13.LCLocal Control
14.OMOperations Manager
15.OSOperations Supervisor
16.PARPrecision Approach Radar
17.STMCICSupervisory Traffic Management Coordinator-in-Charge
b.

Facility air traffic managers may use designators other than those listed to accommodate local situations.

10-1-2 TOWER/RADAR TEAM CONCEPTS

There are no absolute divisions of responsibilities regarding position operations. The tasks to be completed remain the same whether one, two, or three people are working positions within a tower cab/facility/sector. The team, as a whole, has responsibility for the safe and efficient operation of the tower cab/facility/sector.

10-1-3 MILITARY ATC BOARDS

a.

Commanders at USAF bases with flight operations have been directed by USAF to establish airfield operations boards. Among other things, the boards develop recommendations for improving ATC and airfield services and attempt to resolve local air traffic problems.

b.

The ATCT manager, his/her representative, or the ATREP at these bases may be designated as a member of the board. The FAA member must inform the board that his/her participation does not commit the FAA to abide by the board's recommendations even though they may be approved or even suggested by him/her.

c.

The FAA member should become familiar with Air Force Regulation 55-48, Air Force Instructions 13-203, Air Traffic Control, and 13-213, Airfield Management.

10-1-4 SECTIONAL AERONAUTICAL, TERMINAL AREA, AND OTHER CHARTS

a.

Air Traffic Managers (ATMs) must ensure current operational charts and publications, including, but not limited to, Terminal Area Charts (TACs), IFR Enroute Aeronautical Charts, Sectional Aeronautical Charts, and Helicopter Route Charts, if applicable, are immediately available in the operating quarters for reference.

b.

TACs provide information needed for flight within or in the vicinity of complex terminal airspace. These charts are typically developed for Class B airspace and may include VFR Flyway Planning Charts on the reverse side. These charts provide a large‐scale portrayal of selected metropolitan complexes to assist with VFR planning and pilotage.

c.

ATMs must review VFR checkpoints/waypoints published on Sectionals, TACs, and other VFR chart products for accuracy, completeness, and reasonableness. Nearby facilities that make use of the same area depicted on the charts must agree upon the VFR checkpoints/waypoints to be depicted.

d.

Procedures for facilities to implement or revise VFR charts are contained in Chapter 12, National Programs, of this order.

e.

If local implementation of VFR checkpoints/waypoints is required, a list may be developed in association with local flight schools and fixed base operators for local use. They may only be used with local users who participated in developing the list. They may not be charted or published.

10-1-5 AREAS OF NONVISIBILITY

Air traffic managers of towers located where portions of the airport surface are normally designated movement areas and/or where portions of the airport traffic pattern are not visible from the tower must, after coordination with the airport management, issue a letter to airmen describing the condition. The recommended wording is:

a.

“Due to obstructed vision, (facility identification) tower is unable to provide airport traffic control service in following areas: (describe the areas).”

b.

“Due to the movement of uncontrolled ground traffic, (facility identification) tower is unable to provide airport traffic control service in the following areas: (describe the areas).”

c.

“Use caution, the following areas are not visible from the (facility name) tower: (describe the areas, traffic pattern, active runway).”

10-1-6 SELECTING ACTIVE RUNWAYS

The ATCT supervisor/CIC determines which runway/s are designated RUNWAY IN USE / ACTIVE RUNWAY / DUTY RUNWAY.

a.

Coordinate with affected facilities.

b.

Select the RUNWAY IN USE / ACTIVE RUNWAY / DUTY RUNWAY by considering all known factors that may in any way affect the safety of takeoff/landing operations including the initial departure and the instrument approach phases of flight within terminal area airspace. Factors to consider include: surface wind direction and velocity (including gusts), wind shear / microburst alerts/reports, airport conditions, primary airport and adjacent airport traffic flows, weather activity, arrival/departure restrictions (and other airport-specific traffic management initiatives), environmental factors, etc.

NOTE

Consider the adverse effect of short‐duration changes when selecting active runways or airport configurations. For example, “chasing the wind” could have adverse effects.

c.

Responsibility for designating RUNWAY IN USE / ACTIVE RUNWAY / DUTY RUNWAY may be further delegated; however, a facility directive must be issued to define specific coordination requirements.

d.

Tailwind and crosswind considerations take precedence over delay/capacity considerations, and noise abatement operations/procedures/agreements.

e.

ATCTs must formalize, in their Standard Operating Procedures (SOP) and Letters of Agreement (LOAs) (as applicable), local procedures compliant with the provisions of this paragraph.

10-1-7 USE OF ACTIVE RUNWAYS

a.

Air traffic managers must issue a facility directive containing procedures to ensure the efficient use of runways, positive control and coordination of aircraft/vehicles on or near active runways. Authorization for aircraft/vehicles to taxi/proceed on or along an active runway, for purposes other than crossing, must be provided via direct communications on the appropriate local control frequency. This authorization may be provided on the ground control frequency after coordination with local control is completed for those operations specifically described in a facility directive.

b.

Air traffic managers must develop procedures to be included in a facility directive for the mandatory use of an approved surface memory aid at the appropriate operational position/s for:

1.

Runway status (CLOSED/INACTIVE)

2.

Runway crossing

3.

Vehicle, personnel or equipment on active runway/s

4.

Land and Hold Short Operations (LAHSO)

5.

Line Up and Wait (LUAW)

6.

Landing clearance

c.

Approved memory aids will be maintained in the Surface Memory Aids Toolbox. The use of memory aids that are not already included in the Toolbox must be approved by the Director, Strategic Operations, AJT-1, through the appropriate Service Area Director of Air Traffic Operations, who will coordinate with Runway Safety (AJI-1550) for inclusion (available on CEDAR).

d.

Air traffic managers must include procedures in the facility directive to assist the local and ground controllers in maintaining awareness of aircraft positions on the airport.

REFERENCE

FAA Order JO 7110.65, Para 3-1-4, Coordination Between Local and Ground Controllers. FAA Order JO 7110.65, Para 3-1-7, Position Determination.

e.

FAA Order JO 7110.65, Air Traffic Control, contains procedures for the control of aircraft/vehicle movements on active runways. Exceptions may be authorized, upon approval by the Service Area Director of Air Traffic Operations, to allow prearranged coordination where equivalent procedural safeguards exist to preclude a loss of separation. Exceptions must be limited to complex locations with clearly demonstrated extraordinary requirements that cannot be met through the application of the standard procedures in FAA Order JO 7110.65. The following are required:

1.

A facility directive that clearly defines ground/local/cab coordinator responsibilities and contains safeguards to prevent inadvertent use of runways by local/ground/cab coordinator at the same time and do not rely solely on visual observation (look-and-go).

2.

The use of the cab coordinator in runway crossing procedures must have restraints to guard against unanticipated actions by the local controller to prevent traffic conflicts. Coordinators must not approve runway crossings in front of aircraft on the runway awaiting takeoff without first coordinating with the local controller. Similar restraints should be included with regard to landing aircraft; e.g., cutoff points that ensure the runway is clear before landing aircraft arrive over the threshold. Based on a direct knowledge of the local controller's instant traffic situation, the cab coordinator may authorize ground control to conduct an operation across an active runway. The cab coordinator must ensure the timeliness of all such operations and initiate any necessary action to prevent runway crossing incidents. When not certain of local control's traffic, the cab coordinator may still effectively function as a communications link between the local controller and the ground controller.

3.

A separate facility directive must specify the responsibilities of the cab coordinator in authorizing active runway crossings. This directive must specify the cab coordinator's function, authority, and accountability. The Service Area Director of Air Traffic Operations must approve this directive prior to implementation.

f.

Air traffic managers at instrumented airports with operating control towers must, in addition to the above, annually review airport surface diagrams to ensure that the runway centerline heading information is current. This may be accomplished by comparing the posted magnetic headings of the runways shown on the airport obstruction chart, corrected to the current magnetic variation for the facility, with the heading shown on the airport surface diagram. The air traffic manager must review departure procedures to ensure continued compatibility with the runway headings posted on the airport surface diagram.

g.

Air traffic managers must develop a facility directive that defines the coordination responsibilities of local control and ground control to ensure that coordination is accomplished to accommodate an aircraft exiting the runway which must enter another taxiway/runway/ramp area (other than the one used to exit the landing runway) to taxi clear of the runway.

NOTE

This directive is only required at facilities where an aircraft exiting the runway must enter another taxiway/runway/ramp area, other than the one used to exit the landing runway, to taxi clear of the runway.

10-1-8 PROCEDURES FOR OPENING AND CLOSING RUNWAYS

Each ATM:

a.

Must ensure that the authority, responsibility, and procedures to be used when opening or closing a runway are defined in an LOA with airport management/military operations office. Items which should be addressed, if relevant, are: the use of barriers/visual aids (lighted or unlighted “X”, barricades, etc.), portions of the closed runway available for ground operations such as crossings, and information for issuing NOTAMs. Other items may be included, as appropriate.

NOTE

Only the airport management/military operations office can close or open a runway.

b.

Must develop and provide a tailored checklist to be used when opening and closing a runway. A facility directive must designate the position responsible for completing the checklist. Items which should be included, if relevant, are:

1.

Coordination.

(a)

Airport management.

(b)

Intrafacility.

(c)

Interfacility.

(d)

Technical operations.

(e)

Traffic management.

2.

Memory aids.

3.

Safety Logic System.

4.

Status information area.

5.

Airfield lighting.

6.

NAVAIDs.

7.

ATIS.

8.

Entry on the daily log.

c.

May increase the number of items and/or the level of detail of the opening and closing checklist as they deem necessary.

d.

Must ensure that a facility directive includes procedures for the mandatory use of an approved memory aid that indicates the status of the runway (CLOSED/INACTIVE).

e.

Must implement approved memory aids and develop procedures outlining their use.

NOTE

When implementing these procedures, one should consider short-term versus long-term closures as well as planned versus unplanned processes.

REFERENCE

FAA Order JO 7110.65, Para 3-3-1, Landing Area Condition. FAA Order JO 7110.65, Para 3-3-2, Closed/Unsafe Runway Information. FAA Order JO 7110.65, Para 4-7-12, Airport Conditions. FAA Order JO 7210.3, Para 4-7-3, System Impact Reports. FAA Order JO 7210.3, Para 10-1-7, Use of Active Runways. FAA Order JO 7210.3, Para 18-5-13, Electronic System Impact Reports.

10-1-9 FLIGHT PROGRESS STRIP USAGE

Air traffic managers at automated terminal radar facilities may waive the requirement to use flight progress strips provided:

a.

Back-up systems such as multiple radar sites/systems are utilized.

b.

Local procedures are documented in a facility directive. These procedures should include but not be limited to:

1.

Departure areas and/or procedures.

2.

Arrival procedures.

3.

Overflight handling procedures.

4.

Transition from radar to nonradar.

c.

No misunderstanding will occur as a result of no strip usage.

d.

Unused flight progress strips, facility developed forms and/or blank notepads must be provided for controller use.

e.

Facilities must revert to flight progress strip usage if back-up systems referred to in subparagraph a above are not available.

10-1-10 LOW VISIBILITY OPERATIONS

a.

Facility air traffic managers must participate in developing a local SMGCS plan when the airport is under the guidelines of the National SMGCS plan.

REFERENCE

AC 120-57, Surface Movement Guidance and Control System (SMGCS).

b.

Facility air traffic managers must ensure all operational personnel are properly briefed prior to the effective date of local SMGCS plan. All air traffic procedures included in the SMGCS plan must be contained in a facility directive.

10-1-11 MOBILE CONTROL TOWERS

a.

Mobile control towers must be used at FAA locations:

1.

To provide services during a move from an old tower structure into a new tower.

2.

When repairs, rehabilitation, or installation of new equipment make the tower structure temporarily uninhabitable.

3.

During periods of natural emergency; e.g., the tower structure has been damaged by fire, accident, or wind.

4.

During national emergencies as required by the DoD at FAA and non‐FAA locations.

b.

Mobile control towers may be used at non-FAA locations when requested by flying organizations, cities, or other political entities to assist in the operation of fly‐ins, air races, etc., provided:

1.

The Terminal Operations Area Office, after careful consideration of a request to use FAA personnel and/or equipment, determines that the service is required and can be made available without:

(a)

Jeopardizing FAA activities.

(b)

Interfering with the gainful employment of competent non-Federal personnel.

2.

Non‐Federal personnel selected to support the event are properly certificated and rated in accordance with 14 CFR part 65 for the airport.

3.

The requesting organization is apprised that the mobile unit is subject to immediate recall should an emergency arise.

10-1-12 PARTICIPATION IN LOCAL AIRPORT DEICING PLAN (LADP)

a.

Officials, at airports operating under 49 CFR part 1540/1542 and 14 CFR part 139 subject to icing weather conditions with control towers, should develop LADPs in order to involve all interested parties in the deicing/anti‐icing process. Aircraft departing from airports without a LADP are not exempt from any traffic management initiative.

b.

The operators of these airports have been requested to host meetings involving airport users and air traffic in a partnership effort to achieve common solutions to local aircraft ground deicing/anti‐icing problems. The emphasis is on developing local strategies that minimize the amount of time an aircraft spends on the ground after being deiced/anti‐iced.

NOTE

Deicing is the process of removing existing frozen precipitation, frost, or ice from aircraft surfaces. Anti‐icing is the process of preventing accumulation of frozen contaminants on aircraft surfaces. Both processes may involve the application of various fluids to the aircraft.

c.

Air traffic managers who receive requests from airport operators to participate in these meetings will use the following guidance:

1.

When requested by the airport operator, the air traffic manager must participate in the development of a LADP. Since a LADP can affect an airport arrival rate and/or departure rate, the air traffic manager must include the participation of the air traffic manager from the appropriate ARTCC, who must participate and/or utilize their traffic management unit (TMU). The plan will be reviewed and updated annually. The plan must include:

(a)

A clear definition of triggering mechanism(s) used to implement the LADP, e.g., holdover tables, visible precipitation.

(b)

Assignment of responsibility to notify air traffic of implementation and cessation of the LADP.

NOTE

Air traffic facilities should not become the triggering mechanism except in rare circumstances. If air traffic is designated as the triggering mechanism, submit the proposed LADP to the Terminal Operations Service Area office for approval.

2.

Develop or enhance local strategies to manage the number of aircraft at the departure runway queues and minimize the amount of time an aircraft spends on the ground after being deiced.

3.

Gate hold procedures, when used as part of a LADP, should be initiated at the time the plan is implemented. The application of gate hold procedures during deicing/anti-icing operations are not predicated on other requirements of FAA Order JO 7210.3.

NOTE

The pilot‐in‐command remains the final authority as to aircraft operation. Air traffic is not responsible for tracking or adherence to aircraft holdover times.

4.

Coordinate the expected start time, actual start time and stop time of the LADP with the appropriate ARTCC TMU. The ARTCC TMU will forward these times to the ATCSCC.

5.

Balance the airport flow to accommodate demand. Adjust the arrival rate with the departure rate. These rates should reflect the number of operations expected to occur during deicing/anti‐icing conditions and facilitate minimizing the amount of time an aircraft spends on the ground after being deiced/anti-iced.

6.

Aircraft operators at LADP airports are responsible for complying with issued Expect Departure Clearance Time (EDCT) times and will not be exempted from compliance with these times. However, once an aircraft has been deiced/anti-iced, it must be released unless a ground stop applicable to that aircraft is in effect. If a facility believes aircraft operators are not performing deicing/anti-icing in a manner consistent to meet the EDCT time, the facility must notify the ATCSCC through the appropriate TMU.

7.

Allocate the available departure slot capacity, when departure rates are reduced because of deicing, consistent with available resources. Facilities should consider the following un‐prioritized list of options when developing departure allocation procedures.

(a)

OPTION A: First come, first served. When departure demand exceeds capacity, the air traffic facility will minimize departure delays at the runway queue by using gatehold or an equivalent procedure.

(b)

OPTION B: Air traffic will determine the departure allocation based upon the departure rate and the stated demand, obtained directly from the users, during a specified time period. For example, air traffic will coordinate with each user and receive their demand for a 15‐minute time period. Then, based upon the total airport departure demand for the 15‐minute time period, determine the number of flights which the user will be allocated, advise each user, and determine which flights they will use to fill their allocation.

(c)

OPTION C: Airport users determine the departure allocation. Air traffic will notify the users of the departure rate in effect and the users will then advise air traffic which flights they will use to fill their allocation. Air traffic will provide input on the coordination process but will not accept an active role in developing the departure allocation.

(d)

OPTION D: Air traffic determines the departure rate and informs the users of the number of operations expected during a specific time period. Air traffic determines the total percentage of each users' daily operations based upon a “typical busy day” by dividing each of the users total daily operations by the airports total daily operations. Then, air traffic determines each users hourly share by multiplying the users daily percentage times the departure rate. The users will then distribute their hourly share evenly throughout the specific time intervals.

NOTE

1. Air traffic may or may not take an active role in determining the percentage of each user's operations on a “typical busy day” and each user's hourly share. 2. If a user has only one aircraft scheduled per hour, attempts should be made to accommodate it.

8.

Provide coordination, communication, and feedback with the parties included in the plan. Coordination should take place when airports are forecast to have icing conditions, during deicing/anti‐icing and after deicing/anti‐icing, to effect necessary adjustments. Prior to and after each winter season, the airport participants should assess the efficiency of the airport plan and address any specific concerns.

9.

Develop an air traffic facility training program. Prior to each winter deicing/anti‐icing season, conduct annual controller refresher training including, but not limited to, awareness of and sensitivity to the peculiar nature of deicing/anti‐icing operations, icing conditions, and minimizing delays at the runway departure queue.

10-1-13 PRECISION OBSTACLE FREE ZONE (POFZ)

Coordinate with the Airport Division and Flight Standards to determine if precision approach operations are impacted by the POFZ. ILS hold lines will need to be relocated if aircraft (vertical surfaces) or vehicles fall within the POFZ.

Referenced in This Section

JO 7110.65 3-1-4JO 7110.65 3-1-7JO 7110.65 3-3-1JO 7110.65 3-3-2JO 7110.65 4-7-12JO 7210.3 4-7-3JO 7210.3 10-1-7JO 7210.3 18-5-1314 CFR Part 65
Previous Section9-3 Other Reports and FormsNext Section 10-2 Position Binders

You Are Reading

10-1-1 OPERATING POSITION DESIGNATORS

Read Citation (on FlightPush)