Skip to Main Content
FlightPushFLIGHTPUSH
Chapter 18

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. FAA Orders
  3. JO 7210.3
  4. Chapter 18
  5. Section 14
Loading
flightpush.co home
JO 7210.3 Facility Operation and Administration
  1. Chapter 1. General

    Section 1. Introduction
  2. Section 2. Order Use
  3. Chapter 2. Administration of Facilities

    Section 1. General
  4. Section 2. Responsibilities
  5. Section 3. Air Traffic Familiarization/Currency Requirements for En Route/Terminal/System Operations Facilities
  6. Section 4. Hours of Duty
  7. Section 5. Watch Coverage-Flight Service Stations
  8. Section 6. Watch Supervision-Terminal/En Route
  9. Section 7. Appearance and Security
  10. Section 8. Medical
  11. Section 9. Weather/Visibility
  12. Section 10. Wind/Altimeter Information
  13. Chapter 3. Facility Equipment

    Section 1. General
  14. Section 2. Use of Communications
  15. Section 3. Communications Procedures
  16. Section 4. Recorders
  17. Section 5. Navigational Aids
  18. Section 6. Surveillance Source Use
  19. Section 7. Video Maps
  20. Section 8. Other Displays
  21. Section 9. Color Displays-Terminal
  22. Chapter 4. Correspondence, Conferences, Records, and Reports

    Section 1. General
  23. Section 2. User Coordination/Conferences/Publicity
  24. Section 3. Letters of Agreement (LOA)
  25. Section 4. Application
  26. Section 5. Other Correspondence
  27. Section 6. Records
  28. Section 7. Reports
  29. Section 8. Freedom of Information Act (FOIA)
  30. Chapter 5. Special Flight Handling

    Section 1. Presidential Aircraft
  31. Section 2. FAA Aircraft
  32. Section 3. DOE and Other Aircraft
  33. Section 4. Other Flight Requests
  34. Section 5. 14 CFR Part 91, UAS Operations
  35. Chapter 6. En Route Operations and Services

    Section 1. General
  36. Section 2. Sector Information Binders
  37. Section 3. Operations
  38. Section 4. Services
  39. Section 5. Air Carrier Computer Interface Program
  40. Section 6. En Route Decision Support Tool (EDST)
  41. Section 7. Advanced Technologies and Oceanic Procedures (ATOP)
  42. Section 8. Reduced Vertical Separation Minimum (RVSM)
  43. Section 9. En Route Information Display System (ERIDS)
  44. Section 10. En Route Data Communications
  45. Chapter 7. En Route Data

    Section 1. Performance Checks
  46. Section 2. Deficiencies
  47. Chapter 8. NAS En Route Automation

    Section 1. General
  48. Section 2. Procedures
  49. Section 3. Displays
  50. Chapter 9. Facility Statistical Data, Reports, and Forms

    Section 1. Operational Count Data
  51. Section 2. Instrument Approach Data
  52. Section 3. Other Reports and Forms
  53. Chapter 10. Terminal Operations, Services, and Equipment

    Section 1. General
  54. Section 2. Position Binders
  55. Section 3. Operations
  56. Section 4. Services
  57. Section 5. Terminal Radar
  58. Section 6. Airport Lighting
  59. Section 7. Airport Arrival Rate (AAR)
  60. Chapter 11. FAA Contract Tower Operation and Administration

    Section 1. Organizational Responsibilities
  61. Section 2. Operations and Staffing
  62. Section 3. Training
  63. Section 4. Documents, Forms, and Charts
  64. Section 5. Operational Documents, Directives, and Regulations
  65. Chapter 12. National Programs

    Section 1. Terminal VFR Radar Services
  66. Section 2. Data Recording and Retention
  67. Section 3. VFR Flyway Planning Chart Program
  68. Section 4. Helicopter Route Chart Program
  69. Section 5. VFR Transition Route Program
  70. Section 6. Standard Terminal Automation Replacement System (STARS)
  71. Section 7. Safety Logic Systems Operations Supervisor/CIC Procedures
  72. Section 8. VFR Waypoint Chart Program
  73. Section 9. Low Altitude Authorization Notification Capability
  74. Section 10. UAS Facility Maps (UASFM)
  75. Section 11. UAS Operations at Towered Airports
  76. Chapter 13. Facility Statistical Data, Reports, and Forms

    Section 1. General Information
  77. Section 2. Itinerant Operations
  78. Section 3. Local Operations
  79. Section 4. Overflight Operations
  80. Section 5. Amending and Reviewing Data
  81. Chapter 14. Flight Service Operations and Services

    Section 1. General
  82. Section 2. Position/Service Information Binders
  83. Section 3. Operations
  84. Section 4. Services
  85. Chapter 15. Aviation Meteorological Services and Equipment

    Section 1. General
  86. Section 2. Pilot Weather Briefing
  87. Section 3. Broadcasts
  88. Chapter 16. Equipment

    Section 1. General
  89. Section 2. Frequencies
  90. Chapter 17. Facility Statistical Data, Reports, and Forms (Alaska Only)

    Section 1. General Information
  91. Section 2. Aircraft Contacted
  92. Section 3. Flight Plan Count
  93. Section 4. Pilot Briefing Count
  94. Section 5. Other Reports and Information
  95. Section 6. FSS Lists, Logs, and Tallies (OASIS)
  96. Chapter 18. Traffic Management National, Center, and Terminal

    Section 1. Organizational Missions
  97. Section 2. Organizational Responsibilities
  98. Section 3. Line of Authority
  99. Section 4. Supplemental Duties
  100. Section 5. Coordination
  101. Section 6. Trajectory‐Based Operations (TBO)
  102. Section 7. Traffic Management Initiatives
  103. Section 8. Flow Evaluation Area (FEA), Flow Constrained Area (FCA), and Integrated Collaborative Rerouting (ICR)
  104. Section 9. Monitor Alert Parameter
  105. Section 10. Ground Delay Programs
  106. Section 11. Airspace Flow Programs (AFP)
  107. Section 12. Collaborative Trajectory Options Program (CTOP)
  108. Section 13. Ground Stop(s)
  109. Section 14. Special Traffic Management Programs
    1. 18-14-1 SPECIAL EVENT PROGRAMS
    2. 18-14-2 COORDINATION
    3. 18-14-3 IMPLEMENTATION
    4. 18-14-4 AIRPORT RESERVATION OFFICE
  110. Section 15. Severe Weather Management
  111. Section 16. Severe Weather Avoidance Plan (SWAP)
  112. Section 17. Preferred IFR Routes Program
  113. Section 18. North American Route Program
  114. Section 19. Coded Departure Routes
  115. Section 20. Route Advisories
  116. Section 21. Operations Plan
  117. Section 22. National Playbook
  118. Section 23. Traffic Management (TM) Support of Non‐Reduced Vertical Separation Minima (RVSM) Aircraft
  119. Section 24. Route Test
  120. Section 25. Time‐Based Flow Management (TBFM)
  121. Section 26. Weather Management
  122. Chapter 19. Waivers, Authorizations, and Exemptions

    Section 1. Regulatory Waivers and Authorizations
  123. Section 2. Elimination of Fixed‐Wing Special Visual Flight Rules Operations
  124. Section 3. Current Authorizations and Exemptions from Title 14, Code of Federal Regulations
  125. Section 4. Parachute Jump Operations
  126. Section 5. Moored Balloons, Kites, Parasail, Unmanned Rockets, and Unmanned Free Balloons/Objects
  127. Section 6. 14 CFR Part 107, sUAS Operations
  128. Section 7. Procedural Waivers
  129. Chapter 20. Temporary Flight Restrictions (TFRs)

    Section 1. General Information
  130. Section 2. Temporary Flight Restrictions for Unmanned Aircraft (49 U.S.C. Section 44812)
  131. Section 3. Temporary Flight Restrictions in the Vicinity of Disaster/Hazard Areas (14 CFR Section 91.137)
  132. Section 4. Temporary Flight Restrictions in National Disaster Areas in the State of Hawaii (Section 91.138)
  133. Section 5. Emergency Air Traffic Rules (14 CFR Section 91.139)
  134. Section 6. Flight Restrictions in the Proximity of the Presidential and Other Parties (14 CFR Section 91.141)
  135. Section 7. Flight Limitation in the Proximity of Space Flight Operations (14 CFR Section 91.143)
  136. Section 8. Management of Aircraft Operations in the Vicinity of Aerial Demonstrations and Major Sporting Events (14 CFR Section 91.145)
  137. Chapter 21. Operations Security: Tactical, Special, and Strategic

    Section 1. Organizational Missions
  138. Section 2. Responsibilities
  139. Section 3. Operational Line of Authority
  140. Section 4. Supplemental Duties
  141. Section 5. Coordination
  142. Section 6. Special Security Instruction (SSI) (14 CFR Section 99.7)
  143. Section 7. Security Notice (SECNOT)
  144. Appendices

    Appendix 1. [RESERVED]
  145. Appendix 2. [RESERVED]
  146. Appendix 3. Air Carrier Aircraft for Air Traffic Activity Operations Count
  147. Appendix 4. Glideslope Outage Authorization Request
  148. Appendix 5. Checklist for Reported Headset Tone Incidents
  149. Appendix 6. Space LOA Sample Templates

JO 7210.3 Facility Operation and Administration|JO 7210.3EE · Change 3 · Effective 7/9/2026

Chapter 18 · Section 14

Special Traffic Management Programs

4 Paragraphs|18-14-1–18-14-4

Read Citation (on FlightPush)

18-14-1 SPECIAL EVENT PROGRAMS

Special programs may be established for a location to accommodate abnormally large traffic demands (for example, Indianapolis 500 Race, EAA AirVenture Oshkosh, SUN 'n FUN Aerospace Expo) or a significant reduction in airport capacity for an extended period (airport runway/taxiway closures for airport construction). These special programs may remain in effect until the event is over or local TM procedures can handle the volume.

18-14-2 COORDINATION

Documentation to justify special programs must be submitted by the facility or TMO to their Operations Support Group (OSG) 90 days in advance, with a copy to the appropriate Deputy Director of System Operations (DDSO). The service area must review and forward the request to the ATCSCC for coordination and approval 60 days in advance.

a.

Documentation must include the following as a minimum:

1.

The reason for implementing special programs and a statement of system impact. Include the total number of additional flights expected.

2.

Airport(s)/sector(s) to be controlled.

3.

Capacity restraints by user category (five air carrier, three air taxi, seven general aviation, three military) per hour per airport.

4.

Hours capacity must be controlled specified in both local time and in UTC (e.g., 0900-1859 EST, 1400-2359Z or, 0900-1859 EDT, 1300-2259Z).

5.

Type of flight to be controlled (e.g., unscheduled, arrivals, departures, IFR, VFR).

6.

Days of the week and dates (e.g., Thursday, May 7 through Monday, May 11 or Friday, May 22 and Sunday, May 24).

7.

A draft copy of the associated Domestic Notice and/or temporary flight restrictions (email preferred).

8.

IFR/VFR capacity at each airport/sector.

9.

Begin date and time for the start of reservation acceptance.

10.

The number of slots to be allocated per airport, or group of airports, per time increment (e.g., ten arrivals every fifteen minutes or forty aircraft every sixty minutes).

11.

Coordination accomplished with impacted facilities and any unresolved issues.

b.

The Service Center OSG must forward the Domestic Notice to the Mission Support Services, Policy (AJV-P), Domestic Notices editor at 9-ATOR-HQ-PubGrp@faa.gov for publication no later than 10 days prior to the start date. Domestic Notices for special events may be published up to 60 days prior to the event. Please submit 70 days prior to the event to allow for the 10‐day internal processing.

NOTE

The web address to obtain a STMP slot: 1. www.fly.faa.gov/estmp 2. Call the Traffic Flow Management Help Desk (609) 485-9601 for problems using the web‐based interface.

18-14-3 IMPLEMENTATION

a.

Special TM programs must be managed by the ATCSCC or the affected ARTCC. The ATCSCC must transmit an advisory containing the reason for the program, airport(s)/sector(s) involved, dates and times the program will be in effect, telephone numbers to be used, and any special instructions, as appropriate. The affected ARTCC must monitor special TM programs to ensure that the demand to the center/terminal facilities is equal to the capacity.

b.

The ATCSCC will disseminate a password and instructions for facility STMP reports. Detailed instructions can be found on the web site for the web interface, or in the Aeronautical Information Manual.

18-14-4 AIRPORT RESERVATION OFFICE

a.

The Airport Reservations Office (ARO) has been established to monitor the operation and allocation of reservations for unscheduled operations at airports designated by the Administrator under FAA adopted rules. These airports are generally known as slot controlled airports. The ARO allocates reservations on a first come, first served basis determined by the time the request is received at the ARO. Standby lists are not maintained. Reservations are allocated through the ARO by the Enhanced Computer Voice Reservation System (e‐CVRS) and not by the local air traffic control facility.

b.

Requests for reservations for unscheduled flights at the slot controlled airports will be accepted beginning 72 hours before the proposed time of operation.

c.

Flights with declared emergencies do not require reservations.

d.

Refer to the website for the current listing of slot controlled airports, limitations, and reservation procedures.

NOTE

The URL to obtain a reservation for unscheduled operations at a slot controlled airport is: http://www.fly.faa.gov/ecvrs. Call the ARO trouble number (540) 422-4246 for problems with a slot reservation.

Previous Section18-13 Ground Stop(s)Next Section 18-15 Severe Weather Management

You Are Reading

18-14-1 SPECIAL EVENT PROGRAMS

Read Citation (on FlightPush)