Skip to Main Content
FlightPushFLIGHTPUSH
Chapter 18

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. FAA Orders
  3. JO 7210.3
  4. Chapter 18
  5. Section 9
Loading
flightpush.co home
JO 7210.3 Facility Operation and Administration
  1. Chapter 1. General

    Section 1. Introduction
  2. Section 2. Order Use
  3. Chapter 2. Administration of Facilities

    Section 1. General
  4. Section 2. Responsibilities
  5. Section 3. Air Traffic Familiarization/Currency Requirements for En Route/Terminal/System Operations Facilities
  6. Section 4. Hours of Duty
  7. Section 5. Watch Coverage-Flight Service Stations
  8. Section 6. Watch Supervision-Terminal/En Route
  9. Section 7. Appearance and Security
  10. Section 8. Medical
  11. Section 9. Weather/Visibility
  12. Section 10. Wind/Altimeter Information
  13. Chapter 3. Facility Equipment

    Section 1. General
  14. Section 2. Use of Communications
  15. Section 3. Communications Procedures
  16. Section 4. Recorders
  17. Section 5. Navigational Aids
  18. Section 6. Surveillance Source Use
  19. Section 7. Video Maps
  20. Section 8. Other Displays
  21. Section 9. Color Displays-Terminal
  22. Chapter 4. Correspondence, Conferences, Records, and Reports

    Section 1. General
  23. Section 2. User Coordination/Conferences/Publicity
  24. Section 3. Letters of Agreement (LOA)
  25. Section 4. Application
  26. Section 5. Other Correspondence
  27. Section 6. Records
  28. Section 7. Reports
  29. Section 8. Freedom of Information Act (FOIA)
  30. Chapter 5. Special Flight Handling

    Section 1. Presidential Aircraft
  31. Section 2. FAA Aircraft
  32. Section 3. DOE and Other Aircraft
  33. Section 4. Other Flight Requests
  34. Section 5. 14 CFR Part 91, UAS Operations
  35. Chapter 6. En Route Operations and Services

    Section 1. General
  36. Section 2. Sector Information Binders
  37. Section 3. Operations
  38. Section 4. Services
  39. Section 5. Air Carrier Computer Interface Program
  40. Section 6. En Route Decision Support Tool (EDST)
  41. Section 7. Advanced Technologies and Oceanic Procedures (ATOP)
  42. Section 8. Reduced Vertical Separation Minimum (RVSM)
  43. Section 9. En Route Information Display System (ERIDS)
  44. Section 10. En Route Data Communications
  45. Chapter 7. En Route Data

    Section 1. Performance Checks
  46. Section 2. Deficiencies
  47. Chapter 8. NAS En Route Automation

    Section 1. General
  48. Section 2. Procedures
  49. Section 3. Displays
  50. Chapter 9. Facility Statistical Data, Reports, and Forms

    Section 1. Operational Count Data
  51. Section 2. Instrument Approach Data
  52. Section 3. Other Reports and Forms
  53. Chapter 10. Terminal Operations, Services, and Equipment

    Section 1. General
  54. Section 2. Position Binders
  55. Section 3. Operations
  56. Section 4. Services
  57. Section 5. Terminal Radar
  58. Section 6. Airport Lighting
  59. Section 7. Airport Arrival Rate (AAR)
  60. Chapter 11. FAA Contract Tower Operation and Administration

    Section 1. Organizational Responsibilities
  61. Section 2. Operations and Staffing
  62. Section 3. Training
  63. Section 4. Documents, Forms, and Charts
  64. Section 5. Operational Documents, Directives, and Regulations
  65. Chapter 12. National Programs

    Section 1. Terminal VFR Radar Services
  66. Section 2. Data Recording and Retention
  67. Section 3. VFR Flyway Planning Chart Program
  68. Section 4. Helicopter Route Chart Program
  69. Section 5. VFR Transition Route Program
  70. Section 6. Standard Terminal Automation Replacement System (STARS)
  71. Section 7. Safety Logic Systems Operations Supervisor/CIC Procedures
  72. Section 8. VFR Waypoint Chart Program
  73. Section 9. Low Altitude Authorization Notification Capability
  74. Section 10. UAS Facility Maps (UASFM)
  75. Section 11. UAS Operations at Towered Airports
  76. Chapter 13. Facility Statistical Data, Reports, and Forms

    Section 1. General Information
  77. Section 2. Itinerant Operations
  78. Section 3. Local Operations
  79. Section 4. Overflight Operations
  80. Section 5. Amending and Reviewing Data
  81. Chapter 14. Flight Service Operations and Services

    Section 1. General
  82. Section 2. Position/Service Information Binders
  83. Section 3. Operations
  84. Section 4. Services
  85. Chapter 15. Aviation Meteorological Services and Equipment

    Section 1. General
  86. Section 2. Pilot Weather Briefing
  87. Section 3. Broadcasts
  88. Chapter 16. Equipment

    Section 1. General
  89. Section 2. Frequencies
  90. Chapter 17. Facility Statistical Data, Reports, and Forms (Alaska Only)

    Section 1. General Information
  91. Section 2. Aircraft Contacted
  92. Section 3. Flight Plan Count
  93. Section 4. Pilot Briefing Count
  94. Section 5. Other Reports and Information
  95. Section 6. FSS Lists, Logs, and Tallies (OASIS)
  96. Chapter 18. Traffic Management National, Center, and Terminal

    Section 1. Organizational Missions
  97. Section 2. Organizational Responsibilities
  98. Section 3. Line of Authority
  99. Section 4. Supplemental Duties
  100. Section 5. Coordination
  101. Section 6. Trajectory‐Based Operations (TBO)
  102. Section 7. Traffic Management Initiatives
  103. Section 8. Flow Evaluation Area (FEA), Flow Constrained Area (FCA), and Integrated Collaborative Rerouting (ICR)
  104. Section 9. Monitor Alert Parameter
    1. 18-9-1 PURPOSE
    2. 18-9-2 IMPLEMENTATION PROCEDURES
    3. 18-9-3 RESPONSIBILITIES
    4. 18-9-4 ANALYSIS REQUIREMENTS
    5. 18-9-5 RESOLVING RECURRING SECTOR LOADING ISSUES
  105. Section 10. Ground Delay Programs
  106. Section 11. Airspace Flow Programs (AFP)
  107. Section 12. Collaborative Trajectory Options Program (CTOP)
  108. Section 13. Ground Stop(s)
  109. Section 14. Special Traffic Management Programs
  110. Section 15. Severe Weather Management
  111. Section 16. Severe Weather Avoidance Plan (SWAP)
  112. Section 17. Preferred IFR Routes Program
  113. Section 18. North American Route Program
  114. Section 19. Coded Departure Routes
  115. Section 20. Route Advisories
  116. Section 21. Operations Plan
  117. Section 22. National Playbook
  118. Section 23. Traffic Management (TM) Support of Non‐Reduced Vertical Separation Minima (RVSM) Aircraft
  119. Section 24. Route Test
  120. Section 25. Time‐Based Flow Management (TBFM)
  121. Section 26. Weather Management
  122. Chapter 19. Waivers, Authorizations, and Exemptions

    Section 1. Regulatory Waivers and Authorizations
  123. Section 2. Elimination of Fixed‐Wing Special Visual Flight Rules Operations
  124. Section 3. Current Authorizations and Exemptions from Title 14, Code of Federal Regulations
  125. Section 4. Parachute Jump Operations
  126. Section 5. Moored Balloons, Kites, Parasail, Unmanned Rockets, and Unmanned Free Balloons/Objects
  127. Section 6. 14 CFR Part 107, sUAS Operations
  128. Section 7. Procedural Waivers
  129. Chapter 20. Temporary Flight Restrictions (TFRs)

    Section 1. General Information
  130. Section 2. Temporary Flight Restrictions for Unmanned Aircraft (49 U.S.C. Section 44812)
  131. Section 3. Temporary Flight Restrictions in the Vicinity of Disaster/Hazard Areas (14 CFR Section 91.137)
  132. Section 4. Temporary Flight Restrictions in National Disaster Areas in the State of Hawaii (Section 91.138)
  133. Section 5. Emergency Air Traffic Rules (14 CFR Section 91.139)
  134. Section 6. Flight Restrictions in the Proximity of the Presidential and Other Parties (14 CFR Section 91.141)
  135. Section 7. Flight Limitation in the Proximity of Space Flight Operations (14 CFR Section 91.143)
  136. Section 8. Management of Aircraft Operations in the Vicinity of Aerial Demonstrations and Major Sporting Events (14 CFR Section 91.145)
  137. Chapter 21. Operations Security: Tactical, Special, and Strategic

    Section 1. Organizational Missions
  138. Section 2. Responsibilities
  139. Section 3. Operational Line of Authority
  140. Section 4. Supplemental Duties
  141. Section 5. Coordination
  142. Section 6. Special Security Instruction (SSI) (14 CFR Section 99.7)
  143. Section 7. Security Notice (SECNOT)
  144. Appendices

    Appendix 1. [RESERVED]
  145. Appendix 2. [RESERVED]
  146. Appendix 3. Air Carrier Aircraft for Air Traffic Activity Operations Count
  147. Appendix 4. Glideslope Outage Authorization Request
  148. Appendix 5. Checklist for Reported Headset Tone Incidents
  149. Appendix 6. Space LOA Sample Templates

JO 7210.3 Facility Operation and Administration|JO 7210.3EE · Change 3 · Effective 7/9/2026

Chapter 18 · Section 9

Monitor Alert Parameter

5 Paragraphs|18-9-1–18-9-5

Read Citation (on FlightPush)

18-9-1 PURPOSE

The Monitor Alert Parameter (MAP) establishes a numerical trigger value to provide notification to facility personnel, through the MA function of the TFMS, that sector/airport efficiency may be degraded during specific periods of time. The efficiency of a functional position or airport in providing air traffic services is a shared responsibility of the TM team. That team consists of the ATCS(s), OS(s), and the TMU. These entities must monitor, assess and act on sector/airport loading issues to ensure that these NAS elements operate efficiently. The ability of a functional position or airport to provide air traffic services may be affected by a variety of factors (i.e., NAVAIDs, meteorological conditions, communications capabilities, etc.); therefore MAP is a dynamic value which will be adjusted to reflect the capabilities of the functional position or airport.

18-9-2 IMPLEMENTATION PROCEDURES

Baseline MAP values are established utilizing a workload‐based model collaboratively developed at the national level and any adjustments made to those values using the ARTCC's collaborative process. These values will be reflected in the TFMS NAS Monitor.

a.

Baseline MAP value adjustments require concurrence of representatives of the TMU and area of specialization. Adjustments to the baseline values will be documented, including rationale, and maintained by the TMU.

b.

The MAP value may be dynamically adjusted to reflect the ability of the functional position to provide air traffic service. Examples of situations that may require an adjustment include convective weather, turbulence, NAVAID outages, or other scenarios that have a negative or positive impact on the ability to safely and efficiently work air traffic at a level consistent with the MAP. Any adjustments made to the MAP value must be communicated to the ATCSCC.

18-9-3 RESPONSIBILITIES

Facility TMUs must:

a.

Monitor all adapted sectors and airports within their area of jurisdiction for alerts generated by the MA function of the TFMS.

b.

Maintain communications with areas of specialization to determine functional position constraints and adjust MAP values to indicate the functional position capabilities.

c.

Set the MA look ahead value at least one hour into the future with 1.5 hours to 2.5 hours being the recommended time frame.

NOTE

The recommendation to set the look ahead value to between 1.5 and 2.5 hours is for pre‐planning purposes. Action taken to address an alert should take place approximately 1 hour prior to the alerted time frame. This activity will allow for a further review and evaluation of the TFMS data. A key in the analysis process is the determination of the duration of the alert. TM initiatives should be primarily for those time frames when the MAP value will be equaled or exceeded for a sustained period of time (usually greater than 5 minutes).

d.

Respond to alerts by:

1.

Analyzing data for the alerted time frame to develop expected impact and recommendations to address the alert.

2.

For red alerts - notify the affected area of the alert, indicating the expected impact and recommended action.

3.

For yellow alerts - notify the affected area of the alert when analysis indicates that the ability of the sector to provide efficient air traffic services will be degraded due to abnormal operations.

e.

Maintain an operational log of red alerts and retain for 45 days the following information:

1.

Date and time of alert.

2.

Results of analysis including expected impact and recommendation to address.

3.

Time area notified.

4.

Action, if any, to be taken.

5.

Functional position configuration (i.e., sector combine status, staffing).

6.

The time period(s), by facility, during which an alert notification(s) has/have been suspended.

18-9-4 ANALYSIS REQUIREMENTS

a.

Facilities will produce, utilizing the Off Line Aircraft Management Program or equivalent program, a 15 minute summary sector activity report for each red alert and each yellow alert conforming to subparagraph 18-9-3d3.

b.

Alerts generated by the MA function of the TFMS will be further evaluated by post event analysis. The focus of this analysis will be towards assessing the effectiveness and impact, both to the sector and the user, of action taken or not taken as a result of a documented alert. A one minute sector summary report will be utilized to assist in the impact analysis of the alerted time frame.

c.

When a pattern of alerts is established (i.e., same sector, same time frame, on a daily basis or requirement for additional resources to manage on a routine basis) which requires recurring TM initiatives for resolution, additional analysis will be conducted. The analysis should result in recommendations to address the identified constraint and may include sector design adjustment, flow dispersion, or user operations adjustment. Should the local facility not be able to implement resolution recommendations due to external factors (i.e., lack of equipment, non‐concurrence from other facilities), the local facility will elevate the issue to the responsible Service Area office.

18-9-5 RESOLVING RECURRING SECTOR LOADING ISSUES

The elevation of a recurring sector loading issue to the regional level indicates that the local facility requires additional assistance in resolving the issue. The appropriate Service Area office will allocate necessary resources to address the sector loading issue and will ensure that:

a.

The local facility forwards a staff study to the Service Area office outlining activities taken to resolve the recurring sector loading problem, solutions explored, and recommendations for resolution. The report will also contain specific initiatives the facility is employing to currently manage the sector.

b.

The originating facility Service Area office will develop an action plan to address the identified problem and will:

1.

Notify ATCSCC of any continuing TM initiatives being implemented to resolve the sector loading problem.

2.

Dedicate resources within the division to evaluate the facility's findings.

3.

Serve as the focal point for coordinating interfacility activity as appropriate.

4.

Coordinate with appropriate FAA Headquarters service units for assistance as necessary.

5.

Forward to the manager ATCSCC, within 60 days of receiving the facility's report, a copy of the draft action plan and associated milestones.

Previous Section18-8 Flow Evaluation Area (FEA), Flow Constrained Area (FCA), and Integrated Collaborative Rerouting (ICR)Next Section 18-10 Ground Delay Programs

You Are Reading

18-9-1 PURPOSE

Read Citation (on FlightPush)