Skip to Main Content
FlightPushFLIGHTPUSH
Chapter 19

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. FAA Orders
  3. JO 7210.3
  4. Chapter 19
  5. Section 7
Loading
flightpush.co home
JO 7210.3 Facility Operation and Administration
  1. Chapter 1. General

    Section 1. Introduction
  2. Section 2. Order Use
  3. Chapter 2. Administration of Facilities

    Section 1. General
  4. Section 2. Responsibilities
  5. Section 3. Air Traffic Familiarization/Currency Requirements for En Route/Terminal/System Operations Facilities
  6. Section 4. Hours of Duty
  7. Section 5. Watch Coverage-Flight Service Stations
  8. Section 6. Watch Supervision-Terminal/En Route
  9. Section 7. Appearance and Security
  10. Section 8. Medical
  11. Section 9. Weather/Visibility
  12. Section 10. Wind/Altimeter Information
  13. Chapter 3. Facility Equipment

    Section 1. General
  14. Section 2. Use of Communications
  15. Section 3. Communications Procedures
  16. Section 4. Recorders
  17. Section 5. Navigational Aids
  18. Section 6. Surveillance Source Use
  19. Section 7. Video Maps
  20. Section 8. Other Displays
  21. Section 9. Color Displays-Terminal
  22. Chapter 4. Correspondence, Conferences, Records, and Reports

    Section 1. General
  23. Section 2. User Coordination/Conferences/Publicity
  24. Section 3. Letters of Agreement (LOA)
  25. Section 4. Application
  26. Section 5. Other Correspondence
  27. Section 6. Records
  28. Section 7. Reports
  29. Section 8. Freedom of Information Act (FOIA)
  30. Chapter 5. Special Flight Handling

    Section 1. Presidential Aircraft
  31. Section 2. FAA Aircraft
  32. Section 3. DOE and Other Aircraft
  33. Section 4. Other Flight Requests
  34. Section 5. 14 CFR Part 91, UAS Operations
  35. Chapter 6. En Route Operations and Services

    Section 1. General
  36. Section 2. Sector Information Binders
  37. Section 3. Operations
  38. Section 4. Services
  39. Section 5. Air Carrier Computer Interface Program
  40. Section 6. En Route Decision Support Tool (EDST)
  41. Section 7. Advanced Technologies and Oceanic Procedures (ATOP)
  42. Section 8. Reduced Vertical Separation Minimum (RVSM)
  43. Section 9. En Route Information Display System (ERIDS)
  44. Section 10. En Route Data Communications
  45. Chapter 7. En Route Data

    Section 1. Performance Checks
  46. Section 2. Deficiencies
  47. Chapter 8. NAS En Route Automation

    Section 1. General
  48. Section 2. Procedures
  49. Section 3. Displays
  50. Chapter 9. Facility Statistical Data, Reports, and Forms

    Section 1. Operational Count Data
  51. Section 2. Instrument Approach Data
  52. Section 3. Other Reports and Forms
  53. Chapter 10. Terminal Operations, Services, and Equipment

    Section 1. General
  54. Section 2. Position Binders
  55. Section 3. Operations
  56. Section 4. Services
  57. Section 5. Terminal Radar
  58. Section 6. Airport Lighting
  59. Section 7. Airport Arrival Rate (AAR)
  60. Chapter 11. FAA Contract Tower Operation and Administration

    Section 1. Organizational Responsibilities
  61. Section 2. Operations and Staffing
  62. Section 3. Training
  63. Section 4. Documents, Forms, and Charts
  64. Section 5. Operational Documents, Directives, and Regulations
  65. Chapter 12. National Programs

    Section 1. Terminal VFR Radar Services
  66. Section 2. Data Recording and Retention
  67. Section 3. VFR Flyway Planning Chart Program
  68. Section 4. Helicopter Route Chart Program
  69. Section 5. VFR Transition Route Program
  70. Section 6. Standard Terminal Automation Replacement System (STARS)
  71. Section 7. Safety Logic Systems Operations Supervisor/CIC Procedures
  72. Section 8. VFR Waypoint Chart Program
  73. Section 9. Low Altitude Authorization Notification Capability
  74. Section 10. UAS Facility Maps (UASFM)
  75. Section 11. UAS Operations at Towered Airports
  76. Chapter 13. Facility Statistical Data, Reports, and Forms

    Section 1. General Information
  77. Section 2. Itinerant Operations
  78. Section 3. Local Operations
  79. Section 4. Overflight Operations
  80. Section 5. Amending and Reviewing Data
  81. Chapter 14. Flight Service Operations and Services

    Section 1. General
  82. Section 2. Position/Service Information Binders
  83. Section 3. Operations
  84. Section 4. Services
  85. Chapter 15. Aviation Meteorological Services and Equipment

    Section 1. General
  86. Section 2. Pilot Weather Briefing
  87. Section 3. Broadcasts
  88. Chapter 16. Equipment

    Section 1. General
  89. Section 2. Frequencies
  90. Chapter 17. Facility Statistical Data, Reports, and Forms (Alaska Only)

    Section 1. General Information
  91. Section 2. Aircraft Contacted
  92. Section 3. Flight Plan Count
  93. Section 4. Pilot Briefing Count
  94. Section 5. Other Reports and Information
  95. Section 6. FSS Lists, Logs, and Tallies (OASIS)
  96. Chapter 18. Traffic Management National, Center, and Terminal

    Section 1. Organizational Missions
  97. Section 2. Organizational Responsibilities
  98. Section 3. Line of Authority
  99. Section 4. Supplemental Duties
  100. Section 5. Coordination
  101. Section 6. Trajectory‐Based Operations (TBO)
  102. Section 7. Traffic Management Initiatives
  103. Section 8. Flow Evaluation Area (FEA), Flow Constrained Area (FCA), and Integrated Collaborative Rerouting (ICR)
  104. Section 9. Monitor Alert Parameter
  105. Section 10. Ground Delay Programs
  106. Section 11. Airspace Flow Programs (AFP)
  107. Section 12. Collaborative Trajectory Options Program (CTOP)
  108. Section 13. Ground Stop(s)
  109. Section 14. Special Traffic Management Programs
  110. Section 15. Severe Weather Management
  111. Section 16. Severe Weather Avoidance Plan (SWAP)
  112. Section 17. Preferred IFR Routes Program
  113. Section 18. North American Route Program
  114. Section 19. Coded Departure Routes
  115. Section 20. Route Advisories
  116. Section 21. Operations Plan
  117. Section 22. National Playbook
  118. Section 23. Traffic Management (TM) Support of Non‐Reduced Vertical Separation Minima (RVSM) Aircraft
  119. Section 24. Route Test
  120. Section 25. Time‐Based Flow Management (TBFM)
  121. Section 26. Weather Management
  122. Chapter 19. Waivers, Authorizations, and Exemptions

    Section 1. Regulatory Waivers and Authorizations
  123. Section 2. Elimination of Fixed‐Wing Special Visual Flight Rules Operations
  124. Section 3. Current Authorizations and Exemptions from Title 14, Code of Federal Regulations
  125. Section 4. Parachute Jump Operations
  126. Section 5. Moored Balloons, Kites, Parasail, Unmanned Rockets, and Unmanned Free Balloons/Objects
  127. Section 6. 14 CFR Part 107, sUAS Operations
  128. Section 7. Procedural Waivers
    1. 19-7-1 PURPOSE
    2. 19-7-2 POLICY
    3. 19-7-3 RESPONSIBILITIES
    4. 19-7-4 WAIVER REQUESTS
    5. 19-7-5 DEVELOPMENT OF SAFETY DOCUMENTATION AND OTHER SAFETY STUDIES
    6. 19-7-6 WAIVER RENEWAL PROCESSING
    7. 19-7-7 PERIODICITY OF WAIVER RENEWALS
    8. 19-7-8 WAIVER APPROVAL PROCESS
  129. Chapter 20. Temporary Flight Restrictions (TFRs)

    Section 1. General Information
  130. Section 2. Temporary Flight Restrictions for Unmanned Aircraft (49 U.S.C. Section 44812)
  131. Section 3. Temporary Flight Restrictions in the Vicinity of Disaster/Hazard Areas (14 CFR Section 91.137)
  132. Section 4. Temporary Flight Restrictions in National Disaster Areas in the State of Hawaii (Section 91.138)
  133. Section 5. Emergency Air Traffic Rules (14 CFR Section 91.139)
  134. Section 6. Flight Restrictions in the Proximity of the Presidential and Other Parties (14 CFR Section 91.141)
  135. Section 7. Flight Limitation in the Proximity of Space Flight Operations (14 CFR Section 91.143)
  136. Section 8. Management of Aircraft Operations in the Vicinity of Aerial Demonstrations and Major Sporting Events (14 CFR Section 91.145)
  137. Chapter 21. Operations Security: Tactical, Special, and Strategic

    Section 1. Organizational Missions
  138. Section 2. Responsibilities
  139. Section 3. Operational Line of Authority
  140. Section 4. Supplemental Duties
  141. Section 5. Coordination
  142. Section 6. Special Security Instruction (SSI) (14 CFR Section 99.7)
  143. Section 7. Security Notice (SECNOT)
  144. Appendices

    Appendix 1. [RESERVED]
  145. Appendix 2. [RESERVED]
  146. Appendix 3. Air Carrier Aircraft for Air Traffic Activity Operations Count
  147. Appendix 4. Glideslope Outage Authorization Request
  148. Appendix 5. Checklist for Reported Headset Tone Incidents
  149. Appendix 6. Space LOA Sample Templates

JO 7210.3 Facility Operation and Administration|JO 7210.3EE · Change 3 · Effective 7/9/2026

Chapter 19 · Section 7

Procedural Waivers

8 Paragraphs|19-7-1–19-7-8

Read Citation (on FlightPush)

19-7-1 PURPOSE

This section prescribes policies and guidelines for the processing of air traffic procedural waiver requests.

19-7-2 POLICY

a.

The Director, Mission Support Services Policy (AJV-P) is the authority to grant or deny a waiver to air traffic procedures.

b.

Procedural waivers pertaining to separation minima require Air Traffic Safety Oversight Service (AOV) approval.

REFERENCE

ATO-SG-15-05, Safety and Technical Training Guidance on Separation Minima.

c.

The grant of a procedural waiver constitutes relief from a specific requirement in an air traffic directive.

19-7-3 RESPONSIBILITIES

The Air Traffic Manager (ATM) must ensure the facility adheres to the provisions outlined in the approved waiver, and that facility personnel are trained accordingly.

19-7-4 WAIVER REQUESTS

a.

The ATM must communicate intent and garner support to pursue a new waiver from their operational chain of command, to include the following, as applicable:

1.

District General Manager

2.

Service Area Director

3.

Director, Strategic Operations, AJT-1

4.

Director, AJV-P

b.

All required safety studies and safety documentation must be completed and approved prior to the request for a new waiver.

c.

New waiver requests must follow the process outlined in the AJV-P Waiver Checklist and must include a memorandum from the appropriate Service Area Director supporting the request. The processing time for a new waiver request package, once received by AJV-P, is normally 240 days. The AJV-P Waiver Checklist is available through the appropriate Service Center or may be obtained from the Standards and Procedures Group (AJV-P3) by submitting a request to: 9-AJV-P-HQ-Correspondence@faa.gov.

19-7-5 DEVELOPMENT OF SAFETY DOCUMENTATION AND OTHER SAFETY STUDIES

a.

A new waiver request pertaining to separation minima requires a safety analysis (e.g., Flight Standards [AFS] study, Monte Carlo simulation) in addition to requiring a Safety Risk Management (SRM) document delineated in the ATO Safety Management System (SMS) Manual. The funding for such a study must be coordinated within the operational service unit. For additional assistance, please contact AJT.

REFERENCE

ATO Safety Management System Manual, Annex A, Para 2.2, Documentation, Review, and Approval Process for Waivers to Separation Minima.

b.

The facility may seek assistance with the development of an SRM document, as needed, from the appropriate Service Center Quality Control Group (QCG).

19-7-6 WAIVER RENEWAL PROCESSING

a.

The ATM must submit waiver renewals to AJV-P via their operational chain of command, to include the District General Manager, appropriate Service Area Director, and the Director, Strategic Operations (AJT-1). Waiver renewal packages must be received by AJV-P at least 180 days prior to a waiver's expiration date.

b.

When submitting a waiver renewal request, review the current SRM document to determine whether any updates are necessary. Specific requirements pertaining to Post-SRM Monitoring and Revising an SRM Document are outlined in the ATO SMS Manual.

c.

Before submitting a waiver renewal request, ensure the following:

1.

Monitoring information pertaining to the existing waiver is reflected in the Safety Management Tracking System (SMTS), as outlined in the ATO SMS Manual.

2.

A statement of monitoring activities must be included in the facility memorandum request.

REFERENCE

Safety Management Systems Manual, Para 4.2, Developing the Monitoring Plan. Safety Management Systems Manual, Para 4.3, Post-SRM Monitoring. Safety Management Systems Manual, Para 5.7, Revising an SRM Document.

d.

Requests for waiver renewals must be processed in accordance with the AJV-P Waiver Checklist.

e.

The AJV-P Waiver Checklist is available through the appropriate Service Center or may be obtained from the Standards and Procedures Group (AJV-P3) by submitting a request to: 9-AJV-P-HQ-Correspondence@faa.gov.

19-7-7 PERIODICITY OF WAIVER RENEWALS

Existing waivers to air traffic procedures that, upon review, are deemed necessary for the continued efficiency and safety of the NAS must adhere to the following renewal timelines:

a.

Waivers in existence for 1 to 10 years must undergo the renewal process every 2 years.

b.

Waivers in existence for 11 to 19 years must undergo the renewal process every 3 years.

c.

Waivers 20 years or older must undergo the waiver renewal process every 5 years.

19-7-8 WAIVER APPROVAL PROCESS

The Policy Directorate must coordinate all waiver approvals with appropriate headquarters organizations based on the nature of the waiver request. If there is a need to coordinate with a field facility, the Policy Directorate must do so through the appropriate Service Center.

Previous Section19-6 14 CFR Part 107, sUAS OperationsNext Section 20-1 General Information

You Are Reading

19-7-1 PURPOSE

Read Citation (on FlightPush)