Skip to Main Content
FlightPushFLIGHTPUSH
Chapter 5

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. FAA Orders
  3. JO 7110.65
  4. Chapter 5
  5. Section 9
Loading
flightpush.co home
JO 7110.65 Air Traffic Control
  1. Chapter 1. General

    Section 1. Introduction
  2. Section 2. Terms of Reference
  3. Chapter 2. General Control

    Section 1. General
  4. Section 2. Flight Plans and Control Information
  5. Section 3. Flight Progress Strips
  6. Section 4. Radio and Interphone Communications
  7. Section 5. Route and NAVAID Description
  8. Section 6. Weather Information
  9. Section 7. Altimeter Settings
  10. Section 8. Runway Visibility Reporting- Terminal
  11. Section 9. Automatic Terminal Information Service Procedures
  12. Section 10. Team Position Responsibilities
  13. Chapter 3. Airport Traffic Control - Terminal

    Section 1. General
  14. Section 2. Visual Signals
  15. Section 3. Airport Conditions
  16. Section 4. Airport Lighting
  17. Section 5. Runway Selection
  18. Section 6. Airport Surface Detection Procedures
  19. Section 7. Taxi and Ground Movement Procedures
  20. Section 8. Spacing and Sequencing
  21. Section 9. Departure Procedures and Separation
  22. Section 10. Arrival Procedures and Separation
  23. Section 11. Helicopter Operations
  24. Section 12. Sea Lane Operations
  25. Chapter 4. IFR

    Section 1. NAVAID Use Limitations
  26. Section 2. Clearances
  27. Section 3. Departure Procedures
  28. Section 4. Route Assignment
  29. Section 5. Altitude Assignment and Verification
  30. Section 6. Holding Aircraft
  31. Section 7. Arrival Procedures
  32. Section 8. Approach Clearance Procedures
  33. Chapter 5. Radar

    Section 1. General
  34. Section 2. Beacon/ADS-B Systems
  35. Section 3. Radar Identification
  36. Section 4. Transfer of Radar Identification
  37. Section 5. Radar Separation
  38. Section 6. Vectoring
  39. Section 7. Speed Adjustment
  40. Section 8. Radar Departures
  41. Section 9. Radar Arrivals
    1. 5-9-1 VECTORS TO FINAL APPROACH COURSE
    2. 5-9-2 FINAL APPROACH COURSE INTERCEPTION
    3. 5-9-3 VECTORS ACROSS FINAL APPROACH COURSE
    4. 5-9-4 ARRIVAL INSTRUCTIONS
    5. 5-9-5 APPROACH SEPARATION RESPONSIBILITY
    6. 5-9-6 SIMULTANEOUS DEPENDENT APPROACHES
    7. 5-9-7 SIMULTANEOUS INDEPENDENT APPROACHES- DUAL & TRIPLE
    8. 5-9-8 SIMULTANEOUS INDEPENDENT CLOSE PARALLEL APPROACHES –PRECISION RUNWAY MONITOR (PRM) APPROACHES
    9. 5-9-9 SIMULTANEOUS OFFSET INSTRUMENT APPROACHES (SOIA)
    10. 5-9-10 SIMULTANEOUS INDEPENDENT APPROACHES TO WIDELY-SPACED PARALLEL RUNWAYS WITHOUT FINAL MONITORS
    11. 5-9-11 TRANSITIONAL PROCEDURE
  42. Section 10. Radar Approaches- Terminal
  43. Section 11. Surveillance Approaches- Terminal
  44. Section 12. PAR Approaches- Terminal
  45. Section 13. Automation- En Route
  46. Section 14. Standard Terminal Automation Replacement System (STARS)-Terminal
  47. Chapter 6. Nonradar

    Section 1. General
  48. Section 2. Initial Separation of Successive Departing Aircraft
  49. Section 3. Initial Separation of Departing and Arriving Aircraft
  50. Section 4. Longitudinal Separation
  51. Section 5. Lateral Separation
  52. Section 6. Vertical Separation
  53. Section 7. Timed Approaches
  54. Chapter 7. Visual

    Section 1. General
  55. Section 2. Visual Separation
  56. Section 3. VFR‐On‐Top
  57. Section 4. Approaches
  58. Section 5. Special VFR (SVFR)
  59. Section 6. Basic Radar Service to VFR Aircraft- Terminal
  60. Section 7. Terminal Radar Service Area (TRSA)-Terminal
  61. Section 8. Class C Service- Terminal
  62. Section 9. Class B Service Area- Terminal
  63. Chapter 8. Offshore/Oceanic Procedures

    Section 1. General
  64. Section 2. Coordination
  65. Section 3. Longitudinal Separation
  66. Section 4. Lateral Separation
  67. Section 5. Offshore/Oceanic Transition Procedures
  68. Section 6. Separation from Airspace Reservations
  69. Section 7. North Atlantic ICAO Region
  70. Section 8. Caribbean ICAO Region
  71. Section 9. Pacific ICAO Region
  72. Section 10. North American ICAO Region
  73. Chapter 9. Special Flights

    Section 1. General
  74. Section 2. Special Operations
  75. Section 3. Special Use, ATC-Assigned Airspace, and Stationary ALTRVs
  76. Section 4. Fuel Dumping
  77. Section 5. Jettisoning of External Stores
  78. Section 6. Unmanned Free Balloons
  79. Section 7. Parachute Operations
  80. Section 8. Unidentified Anomalous Phenomena (UAP) Reports
  81. Chapter 10. Emergencies

    Section 1. General
  82. Section 2. Emergency Assistance
  83. Section 3. Overdue Aircraft
  84. Section 4. Control Actions
  85. Section 5. Miscellaneous Operations
  86. Section 6. Oceanic Emergency Procedures
  87. Section 7. Ground Missile Emergencies
  88. Chapter 11. Traffic Management Procedures

    Section 1. General
  89. Chapter 12. Canadian Airspace Procedures

    Section 1. General Control
  90. Chapter 13. Decision Support Tools

    Section 1. ERAM - En Route
  91. Section 2. ATOP - Oceanic
  92. Chapter 14. Data Link Communications

    Section 1. Terminal Procedures for Issuing Automated Clearances
  93. Section 2. En Route Controller Pilot Data Link Communications (CPDLC) - Domestic
  94. Section 3. Advanced Technologies and Oceanic Procedures (ATOP) - Oceanic Controller Pilot Data Link Communications (CPDLC)
  95. Appendices

    Appendix A. Standard Operating Practice (SOP) for the Transfer of Position Responsibility
  96. Appendix B. Standard Operating Practice (SOP) for Aircraft Deviating for Weather Near Active Special Activity Airspace (SAA)

JO 7110.65 Air Traffic Control|JO 7110.65BB · Change 3 · Effective 7/9/2026

Chapter 5 · Section 9

Radar Arrivals

11 Paragraphs|5-9-1–5-9-11

Read Citation (on FlightPush)

5-9-1 VECTORS TO FINAL APPROACH COURSE

Except as provided in paragraph 7-4-2, Vectors for Visual Approach, vector arriving aircraft to intercept the final approach course:

a.

At least 2 miles outside the approach gate unless one of the following exists:

1.

When the reported ceiling is at least 500 feet above the MVA/MIA and the visibility is at least 3 miles (report may be a PIREP if no weather is reported for the airport), aircraft may be vectored to intercept the final approach course closer than 2 miles outside the approach gate but no closer than the approach gate.

2.

If specifically requested by the pilot, aircraft may be vectored to intercept the final approach course inside the approach gate but no closer than the final approach fix.

EXCEPTION. Conditions 1 and 2 above do not apply to RNAV aircraft being vectored for a GPS or RNAV approach.

b.

Provide a minimum of 1,000 feet vertical separation between aircraft on opposite base legs unless another form of approved separation is established during turn-on to final approach.

c.

For a precision approach, at an altitude not above the glideslope/glidepath or below the minimum glideslope intercept altitude specified on the approach procedure chart.

d.

For a nonprecision approach, at an altitude which will allow descent in accordance with the published procedure.

NOTE

A pilot request for an “evaluation approach,” or a “coupled approach,” or use of a similar term, indicates the pilot desires the application of subparagraphs a and b.

e.

EN ROUTE. The following provisions are required before an aircraft may be vectored to the final approach course:

1.

The approach gate and a line (solid or broken), depicting the final approach course starting at or passing through the approach gate and extending away from the airport, be displayed on the radar scope; for a precision approach, the line length must extend at least the maximum range of the localizer; for a nonprecision approach, the line length must extend at least 10 NM outside the approach gate; and

2.

The maximum range selected on the radar display is 150 NM; or

3.

An adjacent radar display is set at 125 NM or less, configured for the approach in use, and is utilized for the vector to the final approach course.

4.

If unable to comply with subparagraphs 1, 2, or 3 above, issue the clearance in accordance with paragraph 4-8-1, Approach Clearance.

REFERENCE

FAA Order JO 7110.65, Para 4-8-1, Approach Clearance. FAA Order JO 7110.65, Para 5-9-2, Final Approach Course Interception.

5-9-2 FINAL APPROACH COURSE INTERCEPTION

a.

Assign headings that will permit final approach course interception on a track that does not exceed the interception angles specified in TBL 5-9-1.

TBL 5-9-1 Approach Course Interception Angle

Distance from interception point to approach gateMaximum interception angle
Less than 2 miles or triple simultaneous approaches in use20 degrees
2 miles or more30 degrees(45 degrees for helicopters)
b.

If deviations from the final approach course are observed after initial course interception, apply the following:

1.

Outside the approach gate: apply procedures in accordance with subparagraph a, if necessary, vector the aircraft for another approach.

2.

Inside the approach gate: inform the pilot of the aircraft's position and ask intentions.

PHRASEOLOGY

(Ident) (distance) MILE(S) FROM THE AIRPORT, (distance) MILE(S) RIGHT/LEFT OF COURSE, SAY INTENTIONS.

NOTE

The intent is to provide for a track course intercept angle judged by the controller to be no greater than specified by this procedure.

REFERENCE

FAA Order JO 7110.65, Chapter 5, Section 9, Radar Arrivals, and Section 10, Radar Approaches- Terminal.

c.

EN ROUTE. When using a radar scope range above 125 NM, the controller must solicit and receive a pilot report that the aircraft is established on the final approach course. If the pilot has not reported established by the final approach gate, inform the pilot of his/her observed position and ask intentions.

NOTE

It may be difficult to accurately determine small distances when using very large range settings.

5-9-3 VECTORS ACROSS FINAL APPROACH COURSE

Inform the aircraft whenever a vector will take it across the final approach course and state the reason for such action.

NOTE

In the event you are unable to so inform the aircraft, the pilot is not expected to turn inbound on the final approach course unless approach clearance has been issued.

PHRASEOLOGY

EXPECT VECTORS ACROSS FINAL FOR (purpose).

EXAMPLE

“EXPECT VECTORS ACROSS FINAL FOR SPACING.”

REFERENCE

FAA Order JO 7110.65, Para 5-9-2, Final Approach Course Interception.

5-9-4 ARRIVAL INSTRUCTIONS

Issue all of the following to an aircraft before it reaches the approach gate:

a.

Position relative to a fix on the final approach course. If none is portrayed on the radar display or if none is prescribed in the procedure, issue position information relative to the navigation aid which provides final approach guidance or relative to the airport.

b.

Vector to intercept the final approach course if required.

c.

Approach clearance except when conducting a radar approach. Issue approach clearance only after the aircraft is:

1.

Established on a segment of a published route or instrument approach procedure, or see FIG 5-9-1 Example 1.

FIG 5-9-1 Arrival Instructions

EXAMPLE

1. Aircraft 1 was vectored to the final approach course but clearance was withheld. It is now at 4,000 feet and established on a segment of the instrument approach procedure. “Seven miles from X‐RAY. Cleared I-L-S runway three six approach.” (See FIG 5-9-1.) 2. Aircraft 2 is being vectored to a published segment of the final approach course, 4 miles from LIMA at 2,000 feet. The MVA for this area is 2,000 feet. “Four miles from LIMA. Turn right heading three four zero. Maintain two thousand until established on the localizer. Cleared I-L-S runway three six approach.” (See FIG 5-9-1.) 3. Aircraft 3 is being vectored to intercept the final approach course beyond the approach segments, 5 miles from Alpha at 5,000 feet. the MVA for this area is 4,000 feet. “Five miles from Alpha. Turn right heading three three zero. Cross Alpha at or above four thousand. Cleared I-L-S runway three six approach.” (See FIG 5-9-1.) 4. Aircraft 4 is established on the final approach course beyond the approach segments, 8 miles from Alpha at 6,000 feet. The MVA for this area is 4,000 feet. “Eight miles from Alpha. Cross Alpha at or above four thousand. Cleared I-L-S runway three six approach.” (See FIG 5-9-1.)

2.

Assigned an altitude to maintain until the aircraft is established on a segment of a published route or instrument approach procedure.

FIG 5-9-2 Arrival Instructions

EXAMPLE

The aircraft is being vectored to the intermediate fix FORRE for an RNAV approach. “Seven miles from FORRE, cleared direct FORRE, cross FORRE at or above four thousand, cleared RNAV runway one eight approach.”

NOTE

1. The altitude assigned must assure IFR obstruction clearance from the point at which the approach clearance is issued until established on a segment of a published route or instrument approach procedure. 2. If the altitude assignment is VFR‐on‐top, it is conceivable that the pilot may elect to remain high until arrival over the final approach fix which may require the pilot to circle to descend so as to cross the final approach fix at an altitude that would permit landing. 3. Aircraft being vectored to the intermediate fix in FIG 5-9-2 must meet all the provisions described in subparagraph 4-8-1h2.

d.

Instructions to do one of the following:

NOTE

The principal purpose of this paragraph is to ensure that frequency changes are made prior to passing the final approach fix. However, at times it will be desirable to retain an aircraft on the approach control frequency to provide a single‐frequency approach or other radar services. When this occurs, it will be necessary to relay tower clearances or instructions to preclude changing frequencies prior to landing or approach termination.

1.

Monitor local control frequency, reporting to the tower when over the approach fix.

2.

Contact the tower on local control frequency.

REFERENCE

FAA Order JO 7110.65, Para 4-8-8, Communications Release.

3.

Contact the final controller on the appropriate frequency if radar service will be provided on final on a different frequency.

REFERENCE

FAA Order JO 7110.65, Para 5-10-8, Final Controller Changeover.

4.

When radar is used to establish the final approach fix, inform the pilot that after being advised that he/she is over the fix he/she is to contact the tower on local control frequency.

EXAMPLE

“Three miles from final approach fix. Turn left heading zero one zero. Maintain two thousand until established on the localizer. Cleared I-L-S runway three six approach. I will advise when over the fix.” “Over final approach fix. Contact tower one one eight point one.”

NOTE

ARSR may be used for establishment of initial approach and intermediate approach fixes only. ASR must be used to establish the final approach fix.

REFERENCE

FAA Order JO 7110.65, Para 5-9-2, Final Approach Course Interception. FAA Order JO 7110.65, Para 5-9-7, Simultaneous Independent Approaches- Dual & Triple.

e.

Where a Terminal Arrival Area (TAA) has been established to support instrument approaches, inform the aircraft of its position relative to the appropriate IAF and issue the approach clearance. (See FIG 5-9-3.)

EXAMPLE

1. Aircraft 1: The aircraft is in the straight in area of the TAA. “Seven miles from CENTR, Cleared R-NAV Runway One Eight Approach.” 2. Aircraft 2: The aircraft is in the left base area of the TAA. “One five miles from LEFTT, Cleared R-NAV Runway One Eight Approach.” 3. Aircraft 3: The aircraft is in the right base area of the TAA. “Four miles from RIGHT, Cleared R-NAV Runway One Eight Approach.”

FIG 5-9-3 Basic “T” Design

5-9-5 APPROACH SEPARATION RESPONSIBILITY

a.

The radar controller performing the approach control function is responsible for separation of radar arrivals unless visual separation is provided by the tower, or a letter of agreement/facility directive authorizes otherwise. Radar final controllers ensure that established separation is maintained between aircraft under their control and other aircraft established on the same final approach course.

NOTE

The radar controller may be a controller in an ARTCC, a terminal facility, or a tower controller when authorized to perform the approach control function in a terminal area.

REFERENCE

FAA Order JO 7110.65, Para 2-1-19, Wake Turbulence. FAA Order JO 7110.65, Section 5, Radar Separation, Para 5-5-1, Application. FAA Order JO 7110.65, Para 7-2-1, Visual Separation. FAA Order JO 7110.65, Para 5-5-4, Minima. FAA Order JO 7210.3, Para 2-1-16, Authorization for Separation Services by Towers.

b.

When timed approaches are being conducted, the radar controller must maintain the radar separation specified in paragraph 6-7-5, Interval Minima, until the aircraft is observed to have passed the final approach fix inbound (nonprecision approaches) or the OM or the fix used in lieu of the outer marker (precision approaches) and is within 5 miles of the runway on the final approach course or until visual separation can be provided by the tower.

REFERENCE

FAA Order JO 7110.65, Para 5-4-6, Receiving Controller Handoff. FAA Order JO 7110.65, Para 5-9-2, Final Approach Course Interception. FAA Order JO 7110.65, Para 5-9-6, Simultaneous Dependent Approaches. FAA Order JO 7110.65, Para 6-7-2, Approach Sequence.

5-9-6 SIMULTANEOUS DEPENDENT APPROACHES

TERMINAL

a.

Apply the following minimum separation when conducting simultaneous dependent approaches:

1.

Provide a minimum of 1,000 feet vertical or a minimum of 3 miles radar separation between aircraft during turn on.

2.

Provide a minimum of 1 mile radar separation diagonally between successive aircraft on adjacent final approach courses when runway centerlines are at least 2,500 feet but no more than 3,600 feet apart.

FIG 5-9-4 Simultaneous Dependent Approaches

EXAMPLE

In FIG 5-9-4, Aircraft 2 is 1.0 mile from Aircraft 1. Approved radar separation must be maintained between Aircraft 1 and Aircraft 3.

3.

Provide a minimum of 1.5 miles radar separation diagonally between successive aircraft on adjacent final approach courses when runway centerlines are more than 3,600 feet but no more than 8,300 feet apart.

FIG 5-9-5 Simultaneous Dependent Approaches

EXAMPLE

In FIG 5-9-5, Aircraft 2 is 1.5 miles from Aircraft 1, and Aircraft 3 is 1.5 miles or more from Aircraft 2. Approved radar separation must be maintained between aircraft on the same final.

4.

Provide a minimum of 2 miles radar separation diagonally between successive aircraft on adjacent final approach courses where runway centerlines are more than 8,300 feet but no more than 9,000 feet apart.

FIG 5-9-6 Simultaneous Dependent Approaches

EXAMPLE

In FIG 5-9-6, Aircraft 2 is 2 miles from heavy Aircraft 1. Aircraft 3 is a small aircraft and is 6 miles from Aircraft 1. *The resultant separation between Aircraft 2 and 3 is at least 4.7 miles.

5.

Provide the minimum approved radar separation between aircraft on the same final approach course.

REFERENCE

FAA Order JO 7110.65, Section 5, Radar Separation, Para 5-5-4, Minima.

b.

The following conditions are required when applying the minimum radar separation on adjacent final approach courses allowed in subparagraph a:

NOTE

1. Established on RNP (EoR) operations are not authorized in conjunction with simultaneous dependent approaches. 2. Simultaneous dependent approaches may only be conducted where instrument approach charts specifically authorize simultaneous approaches.

1.

Apply this separation standard only after aircraft are established on the parallel final approach course.

2.

Straight‐in landings will be made.

3.

Missed approach procedures do not conflict.

4.

Aircraft are informed that approaches to both runways are in use. This information may be provided through the ATIS.

5.

Approach control must have the interphone capability of communicating directly with the local controller at locations where separation responsibility has not been delegated to the tower.

NOTE

The interphone capability is an integral part of this procedure when approach control has the sole separation responsibility.

REFERENCE

FAA Order JO 7110.65, Para 5-9-5, Approach Separation Responsibility. FAA Order JO 7210.3, Para 2-1-16, Authorization for Separation Services by Towers.

c.

Consideration should be given to known factors that may in any way affect the safety of the instrument approach phase of flight, such as surface wind direction and velocity, wind shear alerts/reports, severe weather activity, etc. Closely monitor weather activity that could impact the final approach course. Weather conditions in the vicinity of the final approach course may dictate a change of approach in use.

REFERENCE

FAA Order JO 7110.65, Para 5-9-2, Final Approach Course Interception.

5-9-7 SIMULTANEOUS INDEPENDENT APPROACHES- DUAL & TRIPLE

TERMINAL

a.

Apply the following minimum separation when conducting simultaneous independent approaches:

1.

Provide a minimum of 1,000 feet vertical or a minimum of 3 miles radar separation between aircraft :

(a)

during turn‐on to parallel final approach, or

(b)

until aircraft are established on a published segment of an approach authorized for Established on RNP (EoR) operations.

NOTE

Aircraft are considered EoR on an initial or intermediate segment of an instrument approach authorized for EoR operations after the approach clearance has been issued, read back by the pilot and the aircraft is observed on the published procedure (lateral and vertical path, and within any procedure specified speed restriction), and is conducting a simultaneous independent parallel approach with an authorized simultaneous instrument approach to a parallel runway.

REFERENCE

FAA Order JO 7210.3, Para 10-4-10, Simultaneous Independent Approaches. P/CG Term – Required Navigation Performance (RNP). P/CG Term – Established on RNP Concept.

2.

Dual parallel runway centerlines are at least 3,600 feet apart, or dual parallel runway centerlines are at least 3,000 feet apart with a 2.5° to 3.0° offset approach to either runway.

3.

Triple parallel approaches may be conducted when:

(a)

Parallel runway centerlines are at least 3,900 feet apart; or

(b)

Parallel runway centerlines are at least 3,000 feet apart, a 2.5° to 3.0° offset approach to both outside runways; or

(c)

Parallel runway centerlines are at least 3,000 feet apart, a single 2.5° to 3.0° offset approach to either outside runway while parallel approaches to the remaining two runways are separated by at least 3,900 feet.

(d)

Parallel approaches to airports where the airport field elevation is more than 2,000 feet MSL require the use of the final monitor aid (FMA) system.

4.

Provide the minimum applicable radar separation between aircraft on the same final approach course.

NOTE

Except when conducting an EoR operation, no two aircraft will be assigned the same altitude during turn-on to final. All three aircraft will be assigned altitudes which differ by a minimum of 1,000 feet. Example: 3,000, 4,000, 5,000; 7,000, 8,000, 9,000.

b.

At locations with high update rate surveillance capable of update rates of 1.2 seconds or faster, and where fusion display mode is utilized, simultaneous independent approaches may be conducted under the following conditions:

1.

Dual parallel runway centerlines are at least 3,100 feet apart, or dual parallel runway centerlines are at least 2,500 feet apart with a 2.5° to 3.0° offset approach to either runway.

2.

Triple parallel runway centerlines are at least 3,100 feet apart, or triple parallel runway centerlines are at least 2,500 feet apart with a 2.5° to 3.0° offset approach to both outside runways, or triple parallel runway centerlines are at least 2,500 feet apart, and a single 2.5° to 3.0° offset approach to either outside runway while parallel approaches to the remaining two runways are separated by at least 3,100 feet.

NOTE

Aircraft without functioning ADS-B Out are restricted from utilizing these high update rate (HUR) procedures unless an alternative HUR surveillance source providing one-second or faster target report updating is utilized.

3.

A surveillance update rate of at least 1.2 seconds is required for monitoring the no transgression zone (NTZ) when conducting simultaneous independent approaches to the runway centerline spacing (RCLS) provided in this paragraph.

NOTE

1. HUR procedures cannot be conducted if notified that a 1.2‐second update rate is not being provided. 2. Where RCLS is ≤3400 feet, the normal operating zone (NOZ) is constant at 700 feet; and for RCLS ≥3400 feet, the no transgression zone (NTZ) remains constant at 2000 feet.

4.

Provide the minimum applicable radar separation between aircraft on the same final approach course.

c.

A color digital display set to a 4 to 1 (4:1) aspect ratio (AR) with visual and aural alerts, such as the STARS final monitor aid (FMA), and a surveillance update rate at 4.8 seconds or faster must be used to monitor approaches where:

1.

Dual parallel runway centerlines are at least 2,500 and less than 4,300 feet apart.

2.

Triple parallel runway centerlines are at least 2,500 but less than 5,000 feet apart.

3.

Triple parallel approaches to airports where the airport field elevation is more than 2,000 feet MSL require use of the FMA system.

NOTE

At locations where the airfield elevation is 2000 feet or less, FMA is not required to monitor the NTZ for runway centerlines 4,300 feet or greater for dual runways, and 5,000 feet or greater for triple operations.

d.

The following conditions must be met when conducting dual or triple simultaneous independent approaches:

NOTE

Simultaneous independent approaches may only be conducted where instrument approach charts specifically authorize simultaneous approaches.

REFERENCE

FAA Order JO 7210.3, Para 10–4–10, Simultaneous Independent Approaches.

1.

Straight‐in landings will be made.

2.

All appropriate communication, navigation, and surveillance systems are operating normally.

3.

Inform aircraft that simultaneous independent approaches are in use, or when runway centerlines are less than 4,300 feet, PRM approaches are in use, prior to aircraft departing an outer fix. This information may be provided through the ATIS.

REFERENCE

P/CG Term - Precision Runway Monitor (PRM) System.

4.

Clear the aircraft to descend to the appropriate glideslope/glidepath intercept altitude soon enough to provide a period of level flight to dissipate excess speed. Provide at least 1 mile of straight flight prior to the final approach course intercept.

NOTE

Not applicable to approaches with RF legs.

5.

An NTZ is established an equal distance between extended runway final approach courses and must be depicted on the monitor display. The primary responsibility for navigation on the final approach course rests with the pilot. Control instructions and information are issued only to ensure separation between aircraft and to prevent aircraft from penetrating the NTZ.

NOTE

Where RCLS is ≤3400 feet, the normal operating zone (NOZ) is constant at 700 feet; and for RCLS ≥3400 feet, the no transgression zone (NTZ) remains constant at 2000 feet.

6.

Monitor all approaches regardless of weather. Monitor local control frequency to receive any aircraft transmission. Issue control instructions as necessary to ensure aircraft do not enter the NTZ.

NOTE

1. Separate monitor controllers, each with transmit/receive and override capability on the local control frequency, must ensure aircraft do not penetrate the depicted NTZ. For PRM approaches, a transmit-only secondary “PRM frequency” is also used. Facility directives must define responsibility for providing the minimum applicable longitudinal separation between aircraft on the same final approach course. 2. The aircraft is considered the center of the primary radar return for that aircraft, or, if an FMA or other color final monitor aid is used, the center of the digitized target of that aircraft, for the purposes of ensuring an aircraft does not penetrate the NTZ. The provisions of paragraph 5-5-2, Target Separation, apply also.

7.

Communications transfer to the tower controller's frequency must be completed prior to losing 1,000 feet vertical or 3 miles radar separation between aircraft.

e.

The following procedures must be used by the final monitor controllers:

1.

For PRM approaches, provide position information to an aircraft that is left/right of the depicted final approach course centerline, and in your judgment is continuing on a track that may penetrate the NTZ.

PHRASEOLOGY

(Aircraft call sign) I SHOW YOU (left/right) OF THE FINAL APPROACH COURSE.

2.

Instruct the aircraft to return to the correct final approach course when aircraft are observed to overshoot the turn‐on or to continue on a track which will penetrate the NTZ.

PHRASEOLOGY

YOU HAVE CROSSED THE FINAL APPROACH COURSE. TURN (left/right) IMMEDIATELY AND RETURN TO THE FINAL APPROACH COURSE, or TURN (left/right) AND RETURN TO THE FINAL APPROACH COURSE.

3.

Instruct aircraft on the adjacent final approach course to alter course to avoid the deviating aircraft when an aircraft is observed penetrating or in your judgment will penetrate the NTZ.

NOTE

For PRM approaches, an instruction that may include a descent to avoid the deviating aircraft should only be used when there is no other reasonable option available to the controller. In such a case, the descent must not put the aircraft below the MVA.

PHRASEOLOGY

TRAFFIC ALERT, (call sign), TURN (right/left) IMMEDIATELY HEADING (degrees), CLIMB/DESCEND AND MAINTAIN (altitude).

4.

Terminate radar monitoring when one of the following occurs:

(a)

Visual separation is applied.

(b)

The aircraft reports the approach lights or runway in sight.

(c)

The aircraft is 1 mile or less from the runway threshold, if procedurally required and contained in facility directives.

5.

Do not inform the aircraft when radar monitoring is terminated.

f.

Consideration should be given to known factors that may in any way affect the safety of the instrument approach phase of flight when simultaneous independent approaches, or PRM approaches, if applicable, are being conducted to parallel runways. Factors include, but are not limited to, wind direction/velocity, windshear alerts/reports, severe weather activity, etc. Closely monitor weather activity that could impact the final approach course. Weather conditions in the vicinity of the final approach course may dictate a change of approach in use.

REFERENCE

FAA Order JO 7110.65, Para 5-1-9, Radar Service Termination. FAA Order JO 7110.65, Para 5-9-2, Final Approach Course Interception.

5-9-8 SIMULTANEOUS INDEPENDENT CLOSE PARALLEL APPROACHES –PRECISION RUNWAY MONITOR (PRM) APPROACHES

TERMINAL

When conducting PRM approaches, apply all pertinent provisions of paragraph 5-9-7 and the following:

a.

PRM approaches may only be conducted when charted in the approach title, and where instrument approach charts specifically authorize simultaneous approaches.

REFERENCE

P/CG - Precision Runway Monitor (PRM) System. P/CG - Simultaneous Close Parallel Approaches. P/CG - PRM Approach.

b.

PRM approaches must be assigned when conducting instrument approaches to dual and triple parallel runways with runway centerlines separated by less than 4,300 feet.

5-9-9 SIMULTANEOUS OFFSET INSTRUMENT APPROACHES (SOIA)

TERMINAL

a.

Simultaneous offset instrument approaches (SOIA) may be conducted at FAA designated airports that have an authorization issued by the Director, Strategic Operations, AJT-1, in coordination with AFS with parallel runways that have centerlines separated by at least 750 feet and less than 3,000 feet with one final approach course offset by 2.5 to 3.0 degrees; and

1.

Provide a minimum of 1,000 feet vertical or a minimum of 3 miles radar separation between aircraft during turn-on to final approaches.

NOTE

Communications transfer to the tower controller's frequency must be completed prior to losing vertical separation between aircraft.

2.

Provide the minimum applicable radar separation between aircraft on the same final approach course.

3.

Provide the minimum applicable radar separation between the trailing offset aircraft of a leading SOIA pair and the lead straight-in aircraft in the subsequent SOIA pair when the parallel runways have centerlines separated by less than 2,500 feet.

REFERENCE

FAA Order JO 7110.65, Para 5-5-4, Minima.

b.

The following conditions are required when applying the minimum separation between lead straight-in and offset trailing approaches with glideslope courses or vertical navigation authorized in subparagraph a above:

1.

Straight-in landings will be made.

2.

All appropriate communication, navigation, and surveillance systems are operating normally.

3.

Inform aircraft that PRM approaches are in use prior to aircraft departing an outer fix. This information may be provided through the ATIS.

4.

Clear the aircraft to descend to the appropriate glideslope/glidepath intercept altitude soon enough to provide a period of level flight to dissipate excess speed. Provide at least 1 mile of straight flight prior to the final approach course intercept.

NOTE

Not applicable to approaches with RF legs.

5.

A no transgression zone (NTZ) is established an equal distance between extended runway final approach courses and must be depicted on the monitor display. The NTZ begins prior to the point where adjacent inbound aircraft first lose vertical separation and extends to a point coincident with the location of the offset approach MAP. The primary responsibility for navigation on the final approach course rests with the pilot. Control instructions and information are issued only to ensure separation between aircraft and to prevent aircraft from penetrating the NTZ.

NOTE

Where RCLS is ≤3400 feet, the normal operating zone (NOZ) is constant at 700 feet; and for RCLS ≥3400 feet, the no transgression zone (NTZ) remains constant at 2000 feet.

6.

Monitor all approaches regardless of weather. Monitor local control frequency to receive any aircraft transmission. Issue control instructions as necessary to ensure aircraft do not enter the NTZ.

7.

Separate monitor controllers, each with transmit/receive and override capability on the local control frequency, must ensure aircraft do not penetrate the depicted NTZ. Facility directives must define the responsibility for providing the minimum applicable longitudinal separation between aircraft on the same final approach course and the minimum applicable longitudinal separation between the trailing offset aircraft of a leading SOIA pair and the lead straight in aircraft in the subsequent SOIA pair when the parallel runways have centerlines separated by less than 2,500 feet.

NOTE

The aircraft is considered the center of the digitized target for that aircraft for the purposes of ensuring an aircraft does not penetrate the NTZ.

c.

The following procedures must be used by the final monitor controllers:

1.

Provide position information to an aircraft that is (left/right) of the depicted final approach course centerline, and in your judgment is continuing on a track that may penetrate the NTZ.

PHRASEOLOGY

(Aircraft call sign) I SHOW YOU (left/right) OF THE FINAL APPROACH COURSE.

2.

Instruct the aircraft to return immediately to the correct final approach course when aircraft are observed to overshoot the turn-on or continue on a track which will penetrate the NTZ.

PHRASEOLOGY

YOU HAVE CROSSED THE FINAL APPROACH COURSE. TURN (left/right) IMMEDIATELY AND RETURN TO FINAL APPROACHCOURSE. or TURN (left/right) AND RETURN TO THE FINAL APPROACH COURSE.

3.

Instruct aircraft on the adjacent final approach course to alter course to avoid the deviating aircraft when an aircraft is observed penetrating or in your judgment will penetrate the NTZ.

NOTE

An instruction that may include a descent to avoid the deviating aircraft should only be used when there is no other reasonable option available to the controller. In such a case, the descent must not put the aircraft below the MVA.

PHRASEOLOGY

TRAFFIC ALERT, (call sign), TURN (left/right) IMMEDIATELY HEADING (DEGREES), CLIMB AND MAINTAIN (altitude).

4.

Terminate radar monitoring when one of the following occurs:

(a)

The lead straight in aircraft passes the end of the NTZ nearest the runway threshold.

(b)

The trailing offset aircraft passes the end of the NTZ nearest the runway threshold and has reported the lead straight in aircraft in sight.

(c)

The aircraft begins the visual segment of the approach.

5.

Do not inform the aircraft when radar monitoring is terminated.

d.

Advise the pilot of the trailing offset aircraft of traffic on the adjacent lead straight-in approach course, if that traffic will be a factor in the visual segment of the approach. The provisions of paragraph 7-2-1, Visual Separation, subparagraph a1,concerning visual separation between aircraft being provided by the tower must not be applied to aircraft conducting SOIAs.

NOTE

Once advised, the pilot is authorized to continue past the offset approach MAP if all of the following conditions are met: The pilot has the straight-in approach traffic in sight and expects the traffic to remain in sight; the pilot advises ATC that the traffic is in sight; and the pilot has the runway environment in sight. Otherwise, it is the pilot's responsibility to execute a missed approach at the offset approach MAP.

e.

Ensure that the trailing offset aircraft is positioned to facilitate the flight crew's ability to see the lead straight in traffic from the nominal clear-of-clouds point to the offset approach MAP so that the flight crew can remain separated from that traffic visually from the offset approach MAP to the runway threshold.

NOTE

After accepting a clearance for an offset PRM approach, pilots must remain on the offset approach course until passing the offset approach MAP prior to alignment with the runway centerline. Between the offset approach MAP and the runway threshold, the pilot of the offset approach aircraft assumes visual separation responsibility from the aircraft on the straight-in approach, which means maneuvering the aircraft as necessary to avoid the straight in approach traffic until landing, and providing wake turbulence avoidance, if necessary.

f.

In the visual segment between the offset approach MAP and the runway threshold, if the pilot of the trailing offset aircraft loses visual contact with the lead straight-in traffic, the pilot must advise ATC as soon as practical and follow the published missed approach procedure. If necessary, issue alternate missed approach instructions.

g.

Wake turbulence requirements between aircraft on adjacent final approach courses inside the offset approach MAP are as follows (standard in-trail wake separation must be applied between aircraft on the same approach course):

1.

When runways are at least 2,500 feet apart, there are no wake turbulence requirements between aircraft on adjacent final approach courses.

2.

For runways less than 2,500 feet apart, whenever the ceiling is greater than or equal to 500 feet above the MVA, wake vortex spacing between aircraft on adjacent final approach courses need not be applied.

3.

For runways less than 2,500 feet apart, whenever the ceiling is less than 500 feet above the MVA, wake vortex spacing between aircraft on adjacent final approach courses, as described in paragraph 5-5-4, Minima, must be applied unless acceptable mitigating techniques and operational procedures have been documented and verified by an AFS safety assessment and authorized by the Director, Strategic Operations, AJT-1. The wake turbulence mitigation techniques employed will be based on each airport's specific runway geometry and meteorological conditions and implemented through local facility directives.

4.

Issue all applicable wake turbulence advisories.

REFERENCE

FAA Order JO 8260.49, Para 13.0, Wake Turbulence Requirements. FAA Order JO 7210.3, Para 10-4-10, Simultaneous Independent Approaches. FAA Order JO 7110.65, Para 2-1-20, Wake Turbulence Cautionary Advisories. FAA Order JO 7110.65, Para 5-5-4, Minima.

h.

Consideration should be given to known factors that may in any way affect the safety of the instrument approach phase of flight when conducting SOIA to parallel runways. Factors include but are not limited to wind direction/velocity, wind-shear alerts/reports, severe weather activity, etc. Closely monitor weather activity that could impact the final approach course. Weather conditions in the vicinity of the final approach course may dictate a change of the approach in use.

REFERENCE

FAA Order JO 7110.65, Para 5-1-9, Radar Service Termination. FAA Order JO 7110.65, Para 5-9-2, Final Approach Course Interception.

5-9-10 SIMULTANEOUS INDEPENDENT APPROACHES TO WIDELY-SPACED PARALLEL RUNWAYS WITHOUT FINAL MONITORS

TERMINAL

a.

Simultaneous independent approaches to widely-spaced parallel runways may only be conducted where instrument approach charts specifically authorize simultaneous approaches.

b.

Apply the following minimum separation when conducting simultaneous independent approaches to runway centerlines that are separated by more than 9,000 feet with a field elevation at or below 5,000 feet MSL, or 9,200 feet between runway centerlines with a field elevation above 5,000 feet MSL:

1.

Provide a minimum of 1,000 feet vertical or a minimum of 3 miles radar separation between aircraft:

(a)

during turn-on to parallel final approach, or

(b)

conducting EoR operations, until aircraft are established on a published segment of an approach authorized for EoR operations.

NOTE

Aircraft are considered EoR on an initial or intermediate segment of an instrument approach authorized for EoR operations after the approach clearance has been issued, read back by the pilot and the aircraft is observed on the published procedure (lateral and vertical path, and within any procedure specified speed restriction), and is conducting a simultaneous independent parallel approach with an authorized simultaneous instrument approach to a parallel runway.

REFERENCE

FAA Order JO 7210.3, Para 10–4–11, Simultaneous Widely‐Spaced Parallel Operations. P/CG Term – Required Navigation Performance (RNP). P/CG Term – Established on RNP Concept.

2.

Provide the minimum applicable radar separation between aircraft on the same final approach course.

REFERENCE

FAA Order JO 7110.65, Para 5-5-4, Minima.

c.

The following conditions are required when applying the minimum separation on widely-spaced parallel courses allowed in subparagraph b:

1.

Straight-in landings will be made.

2.

The approach system, radar, and appropriate frequencies are operating normally.

3.

Inform aircraft that simultaneous approaches are in use prior to aircraft departing an outer fix. This information may be provided through the ATIS.

4.

Clear an aircraft to descend to the appropriate glideslope/glidepath intercept altitude soon enough to provide a period of level flight to dissipate excess speed. Provide at least 1 mile of straight flight prior to the final approach course intercept.

NOTE

Not applicable to approaches with RF legs.

5.

Separate final and local controllers are required for each final. Aircraft on the final must be on the appropriate final controller frequency for that runway.

6.

Transfer of communication to the tower controller's frequency must be specified in a facility directive and/or Letter of Agreement.

d.

The following procedures must be used by the final approach controllers:

NOTE

There is no requirement for establishment of a NTZ.

1.

Instruct the aircraft to return to the correct final approach course when that aircraft is observed to overshoot the turn-on or continue on a track which deviates from the final approach course in the direction of the adjacent approach course.

PHRASEOLOGY

YOU HAVE CROSSED THE FINAL APPROACH COURSE. TURN (left/right) IMMEDIATELY AND RETURN TO THE FINAL APPROACH COURSE, or TURN (left/right) AND RETURN TO THE FINAL APPROACH COURSE.

2.

Instruct aircraft on adjacent final approach course to alter course to avoid the deviating aircraft when an aircraft is observed, or in the controller's judgment, has deviated from the final approach course in the direction of the adjacent approach course.

PHRASEOLOGY

TRAFFIC ALERT, (call sign), TURN (left/right) IMMEDIATELY HEADING (degrees), CLIMB AND MAINTAIN (altitude)

e.

Consideration should be given to known factors that may in any way affect the safety of the instrument approach phase of flight when simultaneous approaches are being conducted to parallel runways. Factors include, but are not limited to, wind direction/velocity, wind-shear alerts/reports, severe weather activity, etc. Closely monitor weather activity that could impact the final approach course. Weather conditions in the vicinity of the final approach course may dictate a change of approach in use.

REFERENCE

FAA Order JO 7110.65, Para 5-9-2, Final Approach Course Interception.

5-9-11 TRANSITIONAL PROCEDURE

When aircraft are conducting simultaneous dependent, independent, or any approaches allowing for reduced separation, and one of the aircraft executes a go-around or has its approach clearance terminated and prior to losing the approved reduced separation, control instructions must be expeditiously issued to increase separation between the applicable aircraft. These control instructions must establish approved separation (for example, altitude and/or lateral separation via divergence). In addition, wake turbulence cautionary advisories must be issued in accordance with paragraph 2-1-20, Wake Turbulence Cautionary Advisories.

Referenced in This Section

JO 7110.65 4-8-1JO 7110.65 5-9-2JO 7110.65 4-8-8JO 7110.65 5-10-8JO 7110.65 5-9-7JO 7110.65 2-1-19JO 7110.65 7-2-1JO 7110.65 5-5-4JO 7210.3 2-1-16JO 7110.65 5-4-6JO 7110.65 5-9-6JO 7110.65 6-7-2JO 7110.65 5-9-5JO 7210.3 10-4-10JO 7110.65 5-1-9JO 7110.65 2-1-20
Previous Section5-8 Radar DeparturesNext Section 5-10 Radar Approaches- Terminal

You Are Reading

5-9-1 VECTORS TO FINAL APPROACH COURSE

Read Citation (on FlightPush)