Skip to Main Content
FlightPushFLIGHTPUSH
CP

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. Certification Standards
  3. CP
  4. Area II
Loading
flightpush.co home
Commercial Pilot for Powered-Lift Category
  1. I. Preflight Preparation
  2. II. Preflight Procedures
    1. Task A Preflight Assessment
    2. Task B Flight Deck Management
    3. Task C Powerplant Starting
    4. Task D Ground Taxiing
    5. Task E Before Takeoff Check
  3. III. Airport and Heliport Operations
  4. IV. Hovering Maneuvers
  5. V. Takeoffs, Landings, and Go-Arounds
  6. VI. Performance Maneuvers
  7. VII. Navigation
  8. VIII. Slow Flight and Stalls
  9. IX. Emergency Operations
  10. X. High-Altitude Operations
  11. XI. Special Operations
  12. XII. Postflight Procedures

Commercial Pilot for Powered-Lift Category|FAA-S-ACS-2

Area of Operation II

Preflight Procedures

5 Tasks

Task A Preflight Assessment

References

FAA-H-8083-2, FAA-H-8083-25, FAA-H-8083-28; Flight Manual

Objective

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with preparation for safe flight.

Knowledge

CP.II.A.K1

Pilot self-assessment.

CP.II.A.K2

Determining that the aircraft to be used is airworthy.

CP.II.A.K3

Aircraft preflight inspection, including:

CP.II.A.K3a

a. Which items should be inspected

CP.II.A.K3b

b. The reasons for checking each item

CP.II.A.K3c

c. How to detect possible defects

CP.II.A.K3d

d. The associated regulations

CP.II.A.K4

Environmental factors, including weather, terrain, route selection, and obstructions.

Risk Management

CP.II.A.R1

Pilot.

CP.II.A.R2

Aircraft.

CP.II.A.R3

Environment (e.g., weather, icing, airports/heliports/helipads/landing areas, airspace, terrain, obstacles).

CP.II.A.R4

External pressures.

CP.II.A.R5

Aviation security concerns.

Skills

CP.II.A.S1

Inspect the aircraft with reference to an appropriate checklist.

CP.II.A.S2

Verify the aircraft is in condition for safe flight and conforms to its type design.

CP.II.A.S3

Perform self-assessment.

CP.II.A.S4

Continue to assess the environment for safe flight.

Task B Flight Deck Management

References

14 CFR part 91; AC 120-71; FAA-H-8083-2, FAA-H-8083-25; Flight Manual

Objective

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with flight deck management practices.

Note

See Appendix 2: Safety of Flight.

Knowledge

CP.II.B.K1

Passenger briefing requirements, including operation and required use of safety restraint systems.

CP.II.B.K2

Use of appropriate checklists.

CP.II.B.K3

Requirements for current and appropriate navigation data.

CP.II.B.K4

Securing items and cargo.

Risk Management

CP.II.B.R1

Use of systems or equipment, including automation and portable electronic devices.

CP.II.B.R2

Inoperative equipment.

CP.II.B.R3

Passenger distractions.

Skills

CP.II.B.S1

Secure all items in the aircraft.

CP.II.B.S2

Conduct an appropriate passenger briefing, including identifying the pilot-in-command (PIC), use of safety belts, shoulder harnesses, doors, sterile aircraft, passenger conduct and avoidance of rotor or air induction systems, powerplants, and other heat sources, and emergency procedures.

CP.II.B.S3

Properly program and manage the aircraft’s automation, as applicable.

CP.II.B.S4

Appropriately manage risks by utilizing ADM, including SRM/CRM.

Task C Powerplant Starting

References

FAA-H-8083-2, FAA-H-8083-25; Flight Manual

Objective

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with recommended powerplant starting procedures.

Knowledge

CP.II.C.K1

Starting under various conditions.

CP.II.C.K2

Starting procedures, including the use of external power if applicable.

CP.II.C.K3

Limitations associated with starting.

CP.II.C.K4

Conditions leading to and procedures for an aborted start.

Risk Management

CP.II.C.R1

Use of external power unit.

CP.II.C.R2

Limitations during starting.

CP.II.C.R3

Other hazards specific to the powered-lift make and model.

Skills

CP.II.C.S1

Position the aircraft properly considering structures, other aircraft, wind, and the safety of nearby persons and property.

CP.II.C.S2

Complete the appropriate checklist(s).

CP.II.C.S3

Position the primary flight controls, including the thrust vector, for the prevailing environmental conditions.

CP.II.C.S4

Use single-pilot resource management (SRM) or crew resource management (CRM), as appropriate.

Task D Ground Taxiing

References

AC 91-73; AIM; Chart Supplements; FAA-H-8083-2, FAA-H-8083-25; Flight Manual

Objective

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with ground taxi operations, in a wheel-type aircraft, including runway incursion avoidance.

Knowledge

CP.II.D.K1

Current airport aeronautical references and information resources such as the Chart Supplement, airport diagram, and Notices to Air Missions (NOTAMs).

CP.II.D.K2

Taxi instructions/clearances.

CP.II.D.K3

Airport, heliport, helipad, or unprepared surface environment.

CP.II.D.K4

Visual indicators for wind.

CP.II.D.K5

Aircraft lighting, as appropriate.

CP.II.D.K6

Procedures for:

CP.II.D.K6a

a. Appropriate flight deck activities prior to taxi, including route planning and identifying the location of Hot Spots

CP.II.D.K6b

b. Aircraft configuration

CP.II.D.K6c

c. Radio communications at towered and non-towered airports/heliports/helipads/landing areas

CP.II.D.K6d

d. Entering or crossing runways

CP.II.D.K6e

e. Night taxi operations

CP.II.D.K6f

f. Taxi limitations

Risk Management

CP.II.D.R1

Activities and distractions.

CP.II.D.R2

Confirmation or expectation bias as related to taxi instructions.

CP.II.D.R3

A taxi route or departure runway change.

CP.II.D.R4

Speed during taxi and turns.

CP.II.D.R5

Appropriate thrust vector and brake use.

CP.II.D.R6

Airframe and rotor clearances during taxi.

CP.II.D.R7

Runway incursion.

CP.II.D.R8

Other hazards specific to the powered-lift make and model.

Skills

CP.II.D.S1

Receive and correctly read back clearances/instructions, if applicable.

CP.II.D.S2

Use an appropriate airport/heliport diagram or taxi chart, if published.

CP.II.D.S3

Position the flight controls and configure the aircraft for the existing wind conditions.

CP.II.D.S4

Complete the appropriate checklist(s).

CP.II.D.S5

Maintain positive control of the aircraft during ground operations by controlling direction and speed without excessive use of brakes.

CP.II.D.S6

Comply with airport/heliport/helipad/landing area taxiway markings, signals, and air traffic control (ATC) clearances and instructions.

CP.II.D.S7

Position the aircraft relative to hold lines or a specified point.

CP.II.D.S8

Use single-pilot resource management (SRM) or crew resource management (CRM), as appropriate.

Task E Before Takeoff Check

References

FAA-H-8083-2, FAA-H-8083-25; Flight Manual

Objective

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with before takeoff check.

Knowledge

CP.II.E.K1

Purpose of before takeoff checklist items, including:

CP.II.E.K1a

a. Reasons for checking each item

CP.II.E.K1b

b. Detecting malfunctions

CP.II.E.K1c

c. Configuring the aircraft as recommended by the manufacturer

Risk Management

CP.II.E.R1

Division of attention while conducting before takeoff checks.

CP.II.E.R2

Unexpected runway changes.

CP.II.E.R3

Unexpected or unclear clearances from ATC.

CP.II.E.R4

Wake turbulence.

CP.II.E.R5

Downwash.

CP.II.E.R6

Potential powerplant failure during takeoff or other malfunction considering operational factors such as aircraft characteristics, runway/takeoff path length, surface conditions, environmental conditions, and obstructions.

Skills

CP.II.E.S1

Review takeoff performance.

CP.II.E.S2

Select the appropriate takeoff profile for aircraft and environmental conditions.

CP.II.E.S3

Complete the appropriate checklist(s).

CP.II.E.S4

Properly position the aircraft considering other aircraft, vessels, and wind.

CP.II.E.S5

Divide attention inside and outside the aircraft.

CP.II.E.S6

Verify that powerplant parameters and aircraft configuration are suitable for the takeoff profile.

CP.II.E.S7

Use single-pilot resource management (SRM) or crew resource management (CRM), as appropriate.

Regulations Referenced in This Area

14 CFR Part 91
Previous AreaI. Preflight PreparationNext Area III. Airport and Heliport Operations

You Are Reading

Task A Preflight Assessment