Skip to Main Content
FlightPushFLIGHTPUSH
Certification Standards

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. Certification Standards
  3. CP
Loading
flightpush.co home

Airman Certification Standards · FAA-S-ACS-2

Commercial Pilot for Powered-Lift Category

55 Tasks across 12 Areas of Operation. Read Area by Area, with every Task cited.

55 items · About 1.1 MB · Auto-updates · Removed when you log out
Start Reading at Area I

About the CP ACS

Each Area of Operation reads as one continuous document: its Tasks in the contents, each with its references, objective, and Knowledge, Risk Management, and Skills elements. Copy an exact citation from any Task, or open its page in the FAA PDF.

View Mode

Areas of Operation

12

Area I

Preflight Preparation

9 Tasks: Pilot Qualifications, Airworthiness Requirements, Weather Information, and 6 more.

Open

Area II

Preflight Procedures

5 Tasks: Preflight Assessment, Flight Deck Management, Powerplant Starting, and 2 more.

Open

Area III

Airport and Heliport Operations

3 Tasks: Communications, Light Signals, and Runway Lighting Systems, Runway/Taxiway/Heliport/Helipad Signs, Markings, and Lighting, Traffic Patterns.

Open

Area IV

Hovering Maneuvers

3 Tasks: Vertical Takeoff and Landing, Hover Taxi, Air Taxi.

Open

Area V

Takeoffs, Landings, and Go-Arounds

8 Tasks: Normal Takeoff and Climb from a Hover, Rolling Takeoff and Climb, Maximum Performance Takeoff and Climb, and 5 more.

Open

Area VI

Performance Maneuvers

3 Tasks: Rapid Deceleration/Quick Stop, Inflight Conversion During Straight-and-Level Flight, Steep Turns.

Open

Area VII

Navigation

4 Tasks: Pilotage and Dead Reckoning, Navigation Systems and Radar Services, Diversion, and 1 more.

Open

Area VIII

Slow Flight and Stalls

4 Tasks: Maneuvering During Slow Flight (Wing-Borne Configuration), Power-Off Stalls, Power-On Stalls, and 1 more.

Open

Area IX

Emergency Operations

10 Tasks: Powerplant(s) Failure (Simulated) during Takeoff in Thrust-Borne Flight, Powerplant(s) Failure (Simulated) during Takeoff While in Semi-Wing-Borne Flight, Inflight Powerplant(s) Failure and Restart in Multi-Powerplant Aircraft, and 7 more.

Open

Area X

High-Altitude Operations

2 Tasks: Supplemental Oxygen, Pressurization.

Open

Area XI

Special Operations

3 Tasks: Confined Area Operations, Slope Operations, Pinnacle Operations.

Open

Area XII

Postflight Procedures

1 Task: After Landing, Parking, and Securing.

Open