Skip to Main Content
FlightPushFLIGHTPUSH
AA

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. Certification Standards
  3. AA
  4. Area VII
Loading
flightpush.co home
Airline Transport Pilot and Type Rating for Airplane Category
  1. I. Preflight Preparation
  2. II. Preflight Procedures
  3. III. Takeoffs and Landings
  4. IV. In-flight Maneuvers
  5. V. Stall Prevention
  6. VI. Instrument Procedures
  7. VII. Emergency Operations
    1. Task A Emergency Procedures
    2. Task B Powerplant Failure During Takeoff
    3. Task C Powerplant Failure (Simulated) (ASEL, ASES)
    4. Task D Inflight Powerplant(s) Failure and Restart (AMEL, AMES)
    5. Task E Approach and Landing with a Powerplant Failure (Simulated) (AMEL, AMES)
    6. Task F Precision Approach (Manually Flown) with a Powerplant Failure (Simulated) (AMEL, AMES)
    7. Task G Landing from a No Flap or a Nonstandard Flap Approach
  8. VIII. Postflight Procedures

Airline Transport Pilot and Type Rating for Airplane Category|FAA-S-ACS-11A

Area of Operation VII

Emergency Operations

7 Tasks

Task A Emergency Procedures

References

14 CFR part 91; AC 91-74; AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-23, FAA-H-8083-25; FSB Report (type specific); POH/AFM

Objective

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with emergency procedures.

Knowledge

AA.VII.A.K1

Declaring an emergency and selection of a suitable airport or landing location.

AA.VII.A.K2

Situations that would require an emergency descent (e.g., depressurization, smoke, or engine fire).

AA.VII.A.K3

Causes of inflight fire or smoke.

AA.VII.A.K4

Airplane decompression.

AA.VII.A.K5

When an emergency evacuation may be necessary.

AA.VII.A.K6

Actions required if icing conditions exceed the capabilities of the aircraft.

Risk Management

AA.VII.A.R1

Selection of the procedures or checklists to follow in an emergency.

AA.VII.A.R2

Multiple failures or system abnormalities.

AA.VII.A.R3

Altitude, wind, terrain, and obstruction considerations in an emergency.

AA.VII.A.R4

Distractions, task prioritization, loss of situational awareness, or disorientation.

Skills

AA.VII.A.S1

Explain or describe an emergency procedure for a situation(s) presented by the evaluator.

AA.VII.A.S2

Use proper procedures for an emergency situation(s) presented by the evaluator, such as:

AA.VII.A.S2a

a. Emergency Descent

AA.VII.A.S2b

b. Inflight fire and smoke

AA.VII.A.S2c

c. Decompression

AA.VII.A.S2d

d. Emergency evacuation

AA.VII.A.S2e

e. Airframe icing

AA.VII.A.S2f

f. Others as specified in the Airplane Flight Manual (AFM)/Pilot's Operating Handbook (POH)

AA.VII.A.S3

Fly by reference to standby flight instruments, backup instrumentation, or partial panel, if applicable and appropriate to the situation.

AA.VII.A.S4

Coordinate with crew, if applicable, and complete the appropriate checklist(s) in a timely manner.

AA.VII.A.S5

Communicate with air traffic control (ATC) and the evaluator, as appropriate for the situation.

Task B Powerplant Failure During Takeoff

References

FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-25; FSB Report (type specific); POH/AFM

Objective

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with powerplant failure during takeoff.

Note

See Appendix 2: Safety of Flight and Appendix 3: Aircraft, Equipment, and Operational Requirements & Limitations for information related to this Task.

Knowledge

AA.VII.B.K1

The procedures used during a powerplant(s) failure on takeoff, the appropriate reference airspeeds, and the specific pilot actions required.

AA.VII.B.K2

Operational considerations, including: airplane performance (e.g., sideslip, bank angle, rudder input), takeoff warning systems, runway length, surface conditions, density altitude, wake turbulence, environmental conditions, obstructions, and other related factors that could adversely affect safety.

Risk Management

AA.VII.B.R1

Planning for a potential powerplant failure during takeoff considering operational factors (e.g., takeoff warning inhibit systems, other airplane characteristics, runway/takeoff path length, surface conditions, environmental conditions, obstructions, and land and hold short operations.

AA.VII.B.R2

Briefing the plan for a powerplant failure during takeoff, in a crew environment.

AA.VII.B.R3

Selection of the procedures or checklists to follow in an emergency.

AA.VII.B.R4

Identifying the inoperative engine (AMEL, AMES).

AA.VII.B.R5

Inability to climb or maintain altitude with an inoperative powerplant (AMEL, AMES).

AA.VII.B.R6

Altitude, wind, terrain, and obstruction considerations in an emergency.

AA.VII.B.R7

Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).

AA.VII.B.R8

Distractions, task prioritization, loss of situational awareness, or disorientation.

Skills

AA.VII.B.S1

Following the powerplant failure, maintain positive airplane control and adjust the powerplant controls as recommended by the manufacturer for the existing conditions.

AA.VII.B.S2

Establish a power-off descent approximately straight-ahead if the powerplant failure occurs after becoming airborne and before reaching an altitude where a safe turn can be made (ASEL, ASES) or the performance capabilities and operating limitations of the airplane do not allow the climb to continue (AMEL, AMES).

AA.VII.B.S3

Continue the takeoff if the (simulated) powerplant failure occurs at a point where the airplane can continue to a specified airspeed and altitude at the end of the runway commensurate with the airplane’s performance capabilities and operating limitations (AMEL, AMES).

AA.VII.B.S4

After establishing a climb, maintain the desired airspeed, ±5 knots. Use flight controls in the proper combination as recommended by the manufacturer, or as required, to maintain best performance and trim as required (AMEL, AMES).

AA.VII.B.S5

Maintain the appropriate heading, ±5°, when powerplant failure occurs (AMEL, AMES).

AA.VII.B.S6

Coordinate with crew, if applicable, and complete the appropriate checklist(s) following the powerplant failure.

AA.VII.B.S7

Communicate with air traffic control (ATC) and the evaluator, as appropriate for the situation.

Task C Powerplant Failure (Simulated) (ASEL, ASES)

References

FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-25; POH/AFM

Objective

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with powerplant failure and associated emergency approach and landing procedures.

Note

See Appendix 2: Safety of Flight and Appendix 3: Aircraft, Equipment, and Operational Requirements & Limitations for information related to this Task.

Knowledge

AA.VII.C.K1

Immediate action items and emergency procedures for a forced landing.

AA.VII.C.K2

Airspeed, including:

AA.VII.C.K2a

a. Importance of best glide speed and its relationship to distance

AA.VII.C.K2b

b. Difference between best glide speed and minimum sink speed

AA.VII.C.K2c

c. Effects of wind on glide distance

AA.VII.C.K3

Effects of atmospheric conditions on emergency approach and landing.

AA.VII.C.K4

A stabilized approach, including energy management concepts.

AA.VII.C.K5

Emergency Locator Transmitters (ELTs) and other emergency locating devices.

AA.VII.C.K6

Air traffic control (ATC) services to aircraft in distress.

Risk Management

AA.VII.C.R1

Altitude, wind, terrain, obstructions, gliding distance, and available landing distance considerations.

AA.VII.C.R2

Following or changing the planned flightpath to the selected landing area.

AA.VII.C.R3

Collision hazards.

AA.VII.C.R4

Configuring the airplane.

AA.VII.C.R5

Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).

AA.VII.C.R6

Distractions, task prioritization, loss of situational awareness, or disorientation.

AA.VII.C.R7

A powerplant failure in Instrument Meteorological Conditions (IMC).

Skills

AA.VII.C.S1

Recognize the powerplant failure.

AA.VII.C.S2

Determine the cause for the simulated powerplant failure (if altitude permits) and if a restart is a viable option.

AA.VII.C.S3

Maintain positive control throughout the maneuver.

AA.VII.C.S4

Establish and maintain the recommended best glide airspeed, ±5 knots.

AA.VII.C.S5

Configure the airplane in accordance with the Pilot's Operating Handbook (POH)\Airplane Flight Manual (AFM) and existing conditions.

AA.VII.C.S6

Select a suitable landing area considering altitude, wind, terrain, obstructions, and available glide distance.

AA.VII.C.S7

Establish a proper flight path to the selected landing area.

AA.VII.C.S8

Complete emergency checklist items appropriate to the airplane in a timely manner and as recommended by the manufacturer or operator.

AA.VII.C.S9

Communicate with air traffic control (ATC) and the evaluator, as appropriate for the situation.

Task D Inflight Powerplant(s) Failure and Restart (AMEL, AMES)

References

FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-25; POH/AFM

Objective

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with inflight powerplant failure and restart procedures, if applicable, in a multiengine airplane.

Note

See Appendix 2: Safety of Flight and Appendix 3: Aircraft, Equipment, and Operational Requirements & Limitations for information related to this Task.

Knowledge

AA.VII.D.K1

Flight characteristics and controllability associated with maneuvering the airplane with powerplant(s) inoperative, including the importance of drag reduction.

AA.VII.D.K2

Powerplant restart procedures and conditions where a restart attempt is appropriate.

Risk Management

AA.VII.D.R1

Powerplant(s) failure.

AA.VII.D.R2

Methods for handling a powerplant failure or a powerplant restart.

AA.VII.D.R3

Diagnosis of the cause of the powerplant failure.

AA.VII.D.R4

Collision hazards.

AA.VII.D.R5

Configuring the airplane.

AA.VII.D.R6

Factors and situations that could lead to an inadvertent stall, spin, and loss of control with an inflight powerplant failure.

AA.VII.D.R7

Distractions, task prioritization, loss of situational awareness, or disorientation.

Skills

AA.VII.D.S1

Recognize and correctly identify powerplant(s) failure, complete memory items (if applicable), and maintain positive airplane control.

AA.VII.D.S2

Coordinate with crew, if applicable, and complete the appropriate emergency procedures and checklist(s) for propeller feathering or powerplant shutdown.

AA.VII.D.S3

Use flight controls in the proper combination as recommended by the manufacturer, or as required to maintain best performance, and trim as required.

AA.VII.D.S4

Determine the cause for the powerplant(s) failure and if a restart is a viable option.

AA.VII.D.S5

Maintain the operating powerplant(s) within acceptable operating limits.

AA.VII.D.S6

Maintain airspeed ±10 knots, altitude ±100 feet, headings ±10°, as specified by the evaluator and within the airplane’s capability.

AA.VII.D.S7

Consider a powerplant restart and, if appropriate, demonstrate the powerplant restart procedures in accordance with the manufacturer or operator specified procedures and checklists.

AA.VII.D.S8

Select the nearest suitable airport or landing area.

AA.VII.D.S9

Communicate with air traffic control (ATC) and the evaluator, as appropriate for the situation.

Task E Approach and Landing with a Powerplant Failure (Simulated) (AMEL, AMES)

References

FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-25; POH/AFM; SAFO 19001

Objective

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with approach and landing with a powerplant failure in a multiengine airplane.

Note

See Appendix 2: Safety of Flight and Appendix 3: Aircraft, Equipment, and Operational Requirements & Limitations for information related to this Task.

Knowledge

AA.VII.E.K1

Flight characteristics and controllability associated with maneuvering to a landing with inoperative powerplant(s).

AA.VII.E.K2

Go-around/rejected landing procedures with a powerplant failure.

AA.VII.E.K3

How to determine a suitable airport.

Risk Management

AA.VII.E.R1

Planning for a powerplant failure inflight or during an approach.

AA.VII.E.R2

Collision hazards.

AA.VII.E.R3

Configuring the airplane.

AA.VII.E.R4

Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).

AA.VII.E.R5

Distractions, task prioritization, loss of situational awareness, or disorientation.

AA.VII.E.R6

Performing a go-around/rejected landing with a powerplant failure.

Skills

AA.VII.E.S1

Recognize and correctly identify powerplant(s) failure, complete memory items (if applicable), and maintain positive airplane control.

AA.VII.E.S2

Coordinate with crew, if applicable, and complete the appropriate emergency procedures and checklist(s) for simulated propeller feathering or simulated powerplant shutdown.

AA.VII.E.S3

Use flight controls and configure the aircraft as required to maintain best performance or as recommended by the manufacturer.

AA.VII.E.S4

Maintain the operating powerplant(s) within acceptable operating limits.

AA.VII.E.S5

Communicate with air traffic control (ATC) and the evaluator, as appropriate for the situation.

AA.VII.E.S6

Prior to beginning the final approach segment, maintain the desired altitude ±100 feet, the desired airspeed ±10 knots, the desired heading ±5°, and accurately track courses, radials, and bearings.

AA.VII.E.S7

Establish the recommended approach and landing configuration and airspeed, ±5 knots, and adjust pitch attitude and power as required to maintain a stabilized approach.

AA.VII.E.S8

Maintain directional control and appropriate crosswind correction throughout the approach and landing.

AA.VII.E.S9

Make smooth, timely, and correct control application before, during, and after touchdown.

AA.VII.E.S10

Touch down at the appropriate speed and pitch attitude at the runway aiming point markings -250/+500 feet, or where there are no runway markings 750 to 1,500 feet from the approach threshold of the runway (AMEL).

AA.VII.E.S11

During round out and touchdown contact the water at the proper pitch attitude within 200 feet beyond a specified point. In addition, for AMES, the touchdown is within the first one-third of the water landing area.

AA.VII.E.S12

Maintain positive aircraft control throughout the landing using drag and braking devices, as appropriate, to come to a stop.

AA.VII.E.S13

Coordinate with crew, if applicable, and complete after landing checklists.

Task F Precision Approach (Manually Flown) with a Powerplant Failure (Simulated) (AMEL, AMES)

References

FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-15, FAA-H-8083-16, FAA-H-8083-25; POH/AFM; Terminal Procedures Publications

Objective

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with precision approach (manually flown) with a powerplant failure in a multiengine airplane.

Note

See Appendix 2: Safety of Flight and Appendix 3: Aircraft, Equipment, and Operational Requirements & Limitations for information related to this Task.

Knowledge

AA.VII.F.K1

Flight characteristics and controllability associated with maneuvering to a landing with inoperative powerplant(s).

AA.VII.F.K2

Missed approach considerations with a powerplant failure.

AA.VII.F.K3

How to determine a suitable airport.

Risk Management

AA.VII.F.R1

Planning for a powerplant failure inflight or during an approach.

AA.VII.F.R2

Collision hazards.

AA.VII.F.R3

Configuring the airplane.

AA.VII.F.R4

Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).

AA.VII.F.R5

Distractions, task prioritization, loss of situational awareness, or disorientation.

AA.VII.F.R6

Landing with a powerplant failure.

AA.VII.F.R7

Missed approach with a powerplant failure.

AA.VII.F.R8

Maneuvering in instrument meteorological conditions (IMC) with a powerplant failure.

Skills

AA.VII.F.S1

Recognize and correctly identify powerplant(s) failure, complete memory items (if applicable), and maintain positive airplane control.

AA.VII.F.S2

Coordinate with crew, if applicable, and complete the appropriate emergency procedures and checklist(s) for simulated propeller feathering or simulated powerplant shutdown.

AA.VII.F.S3

Use flight controls and configure the aircraft as required to maintain best performance or as recommended by the manufacturer.

AA.VII.F.S4

Maintain the operating powerplant(s) within acceptable operating limits.

AA.VII.F.S5

Make radio calls as appropriate.

AA.VII.F.S6

Proceed toward the nearest suitable airport.

AA.VII.F.S7

Coordinate with crew, if applicable, and complete the approach and landing checklists.

AA.VII.F.S8

Establish the appropriate airplane configuration and airspeed considering meteorological and operating conditions.

AA.VII.F.S9

Prior to beginning the final approach segment, maintain the desired altitude ±100 feet, the desired airspeed ±10 knots, the desired heading ±5°, and accurately track courses, radials, and bearings.

AA.VII.F.S10

Apply adjustments to the published decision altitude (DA)/decision height (DH) and visibility criteria for the aircraft approach category, as appropriate, for factors that include Notices to Air Missions (NOTAMs), inoperative aircraft or navigation equipment, inoperative visual aids associated with the landing environment, etc.

AA.VII.F.S11

Establish a predetermined rate of descent at the point where vertical guidance begins, which approximates that required for the aircraft to follow the vertical guidance.

AA.VII.F.S12

Fly and maintain a stabilized approach, adjusting pitch and power as required, allowing no more than ¼-scale deflection of either the vertical or lateral guidance indications.

AA.VII.F.S13

Maintain a stabilized final approach from the final approach fix (FAF) to the DA/DH allowing no more than ¼-scale deflection of either the vertical or lateral guidance indications and maintain the desired airspeed ±5 knots.

AA.VII.F.S14

Maintain directional control and appropriate crosswind correction throughout the approach and landing or missed approach.

AA.VII.F.S15

Upon reaching the DA/DH, immediately initiate the missed approach procedures if the required visual references for the runway are not distinctly visible and identifiable (or if in a seaplane); or transition to a normal landing approach only when the aircraft is in a position from which a descent to a landing on the runway can be made at a normal rate of descent using normal maneuvering.

AA.VII.F.S16

Make smooth, timely, and correct control application before, during, and after touchdown or during the missed approach.

Task G Landing from a No Flap or a Nonstandard Flap Approach

References

FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-25; FSB Report (type specific); POH/AFM; SAFO 19001

Objective

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with no flap or a nonstandard flap approach and landing.

Note

See Appendix 3: Aircraft, Equipment, and Operational Requirements & Limitations for information related to this Task.

Knowledge

AA.VII.G.K1

Airplane flight characteristics when flaps, leading edge devices, and other similar devices malfunction or become inoperative.

AA.VII.G.K2

Other airplane system limitations when landing at a high speed.

AA.VII.G.K3

How to determine required landing distance and a suitable runway for landing.

Risk Management

AA.VII.G.R1

Hazards associated with a no flap or nonstandard flap approach and landing, including an asymmetrical flap situation.

AA.VII.G.R2

Selection of a runway based on aircraft limitations, available distance, surface conditions, and wind.

AA.VII.G.R3

Wake turbulence.

AA.VII.G.R4

Go-around/rejected landing.

AA.VII.G.R5

Collision hazards.

AA.VII.G.R6

Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).

AA.VII.G.R7

Distractions, task prioritization, loss of situational awareness, or disorientation.

Skills

AA.VII.G.S1

Identify the malfunction.

AA.VII.G.S2

Coordinate with crew, if applicable, and complete applicable checklist(s) for the malfunction, approach, and landing.

AA.VII.G.S3

Communicate with ATC as needed and select an airport/runway with sufficient length for landing.

AA.VII.G.S4

Calculate the correct airspeeds/V-speeds for approach and landing.

AA.VII.G.S5

Establish the recommended approach and landing configuration, airspeed, and trim, and adjust pitch attitude and power as required to maintain a stabilized approach.

AA.VII.G.S6

Select a suitable touchdown point considering wind, landing surface, and obstructions.

AA.VII.G.S7

Make smooth, timely, and correct control application before, during, and after touchdown.

AA.VII.G.S8

Touch down at an acceptable point on the runway that is agreed upon between the applicant and the evaluator. Touch down at the appropriate speed and pitch attitude at the agreed upon point -250/+500 feet. (ASEL, AMEL).

AA.VII.G.S9

Touch down at an acceptable point on the landing surface. During round out and touchdown contact the water at the proper pitch attitude within 200 feet beyond a specified point (ASES, AMES). In addition, for AMES, the touchdown is within the first one-third of the water landing area.

AA.VII.G.S10

Maintain positive aircraft control throughout the landing using drag and braking devices, as appropriate, to come to a stop.

Regulations Referenced in This Area

14 CFR Part 91
Previous AreaVI. Instrument ProceduresNext Area VIII. Postflight Procedures

You Are Reading

Task A Emergency Procedures