Flight Instructor for Airplane CategoryFAA-S-ACS-25
Area of Operation VII
Takeoffs, Landings, and Go-Arounds
15 Tasks
Task A Normal Takeoff and Climb
References
AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-9, FAA-H-8083-23, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands normal takeoff and climb, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Note
If a crosswind condition does not exist, the applicant’s knowledge of crosswind elements must be evaluated through oral testing.
Knowledge
Procedures for normal and crosswind takeoff.
Effects of atmospheric conditions, including wind, on takeoff and climb performance.
Best angle of climb speed (VX) and best rate of climb speed (VY).
Appropriate airplane configuration.
Common errors related to this Task.
Risk Management
Selection of runway based on pilot capability, airplane performance and limitations, available distance, and wind.
Effects of:
a. Crosswind
b. Windshear
c. Tailwind
d. Wake turbulence
e. Takeoff surface/condition
Abnormal operations, including planning for:
a. Rejected takeoff
b. Potential engine failure in takeoff/climb phase of flight
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Runway incursion.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Verify assigned/correct runway or takeoff path.
Determine wind direction with or without visible wind direction indicators.
Position the flight controls for the existing wind, if applicable.
Clear the area, taxi into takeoff position, and align the airplane on the runway centerline (ASEL, AMEL) or takeoff path (ASES, AMES).
Retract the water rudders, as appropriate (ASES, AMES).
Advance the throttle smoothly to takeoff power and confirm proper engine and flight instrument indications prior to rotation.
Avoid excessive water spray on the propeller(s) (ASES, AMES).
Establish and maintain the most efficient planing/lift-off attitude, and correct for porpoising or skipping (ASES, AMES).
Rotate and lift off at the recommended airspeed and accelerate to VY.
Establish a pitch attitude to maintain the manufacturer’s recommended speed or VY, ±5 knots.
Configure the airplane in accordance with manufacturer’s guidance.
Maintain VY ±5 knots to a safe maneuvering altitude.
Maintain directional control and proper wind-drift correction throughout takeoff and climb.
Comply with noise abatement procedures, as applicable.
Analyze and correct common errors related to this Task.
Task B Normal Approach and Landing
References
AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-9, FAA-H-8083-23, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands normal approach and landing, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Note
If a crosswind condition does not exist, the applicant’s knowledge of crosswind elements must be evaluated through oral testing.
Knowledge
Procedures for normal and crosswind approach and landing.
A stabilized approach, including energy management concepts.
Effects of atmospheric conditions, including wind, on approach and landing performance.
Wind correction techniques on approach and landing.
Common errors related to this Task.
Risk Management
Selection of runway/landing surface, approach path, and touchdown area based on pilot capability, aircraft performance and limitations, available distance, and wind.
Effects of:
a. Crosswind
b. Windshear
c. Tailwind
d. Wake turbulence
e. Landing surface/condition
Planning for:
a. Rejected landing and go-around
b. Land and hold short operations (LAHSO)
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Ensure the airplane is aligned with the correct/assigned runway or landing surface.
Scan the runway or landing surface and adjoining area for traffic and obstructions.
Select and aim for a suitable touchdown point considering the wind conditions, landing surface, and obstructions.
Establish the recommended approach and landing configuration, airspeed, and trim, and adjust pitch attitude and power as required to maintain a stabilized approach.
Maintain manufacturer’s published approach airspeed or in its absence not more than 1.3 times the stalling speed or the minimum steady flight speed in the landing configuration (VSO), ±5 knots with gust factor applied.
Maintain directional control and appropriate crosswind correction throughout the approach and landing.
Make smooth, timely, and correct control application during round out and touchdown.
Touch down at a proper pitch attitude, within 200 feet beyond or on the specified point, with no side drift, and with the airplane’s longitudinal axis aligned with and over the runway center/landing path.
Execute a timely go-around if the approach cannot be made within the tolerances specified above or for any other condition that may result in an unsafe approach or landing.
Analyze and correct common errors related to this Task.
Task C Soft-Field Takeoff and Climb (ASEL)
References
AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-9, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands soft-field takeoff and climb, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Knowledge
Purpose of and procedures for soft-field takeoff and climb.
Effects of atmospheric conditions, including wind, on takeoff and climb performance.
Best angle of climb speed (VX) and best rate of climb speed (VY).
Appropriate airplane configuration.
Ground effect.
Importance of weight transfer from wheels to wings.
Left turning tendencies.
Common errors related to this Task.
Risk Management
Selection of runway based on pilot capability, airplane performance and limitations, available distance, and wind.
Effects of:
a. Crosswind
b. Windshear
c. Tailwind
d. Wake turbulence
e. Runway surface/condition
Abnormal operations, including planning for:
a. Rejected takeoff
b. Potential engine failure in takeoff/climb phase of flight
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Verify assigned/correct runway.
Determine wind direction with or without visible wind direction indicators.
Position the flight controls for the existing wind, if applicable.
Clear the area, maintain necessary flight control inputs, taxi into takeoff position and align the airplane on the runway centerline without stopping, while advancing the throttle smoothly to takeoff power.
Confirm takeoff power and proper engine and flight instrument indications.
Establish and maintain a pitch attitude that transfers the weight of the airplane from the wheels to the wings as rapidly as possible.
Lift off at the lowest possible airspeed and remain in ground effect while accelerating to VX or VY, as appropriate.
Establish a pitch attitude for VX or VY, as appropriate, and maintain selected airspeed ±5 knots during the climb.
Configure the airplane after a positive rate of climb has been verified or in accordance with airplane manufacturer’s instructions.
Maintain VX or VY, as appropriate, ±5 knots to a safe maneuvering altitude.
Maintain directional control and proper wind-drift correction throughout takeoff and climb.
Comply with noise abatement procedures, as applicable.
Analyze and correct common errors related to this Task.
Task D Soft-Field Approach and Landing (ASEL)
References
AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-9, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands soft-field approach and landing, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Knowledge
Purpose of and procedures for soft-field approach and landing.
A stabilized approach, including energy management concepts.
Effects of atmospheric conditions, including wind, on approach and landing performance.
Wind correction techniques on approach and landing.
Common errors related to this Task.
Risk Management
Selection of runway based on pilot capability, airplane performance and limitations, available distance, and wind.
Effects of:
a. Crosswind
b. Windshear
c. Tailwind
d. Wake turbulence
e. Runway surface/condition
Planning for:
a. Rejected landing and go-around
b. Land and hold short operations (LAHSO)
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Ensure the airplane is aligned with the correct/assigned runway.
Scan the landing runway and adjoining area for traffic and obstructions.
Select and aim for a suitable touchdown point considering the wind conditions, landing surface, and obstructions.
Establish the recommended approach and landing configuration, airspeed, and trim, and adjust pitch attitude and power as required to maintain a stabilized approach.
Maintain manufacturer’s published approach airspeed or in its absence not more than 1.3 times the stalling speed or the minimum steady flight speed in the landing configuration (VSO), ±5 knots with gust factor applied.
Maintain directional control and appropriate crosswind correction throughout the approach and landing.
Make smooth, timely, and correct control inputs during the round out and touchdown, and, for tricycle gear airplanes, keep the nose wheel off the surface until loss of elevator effectiveness.
Touch down at a proper pitch attitude with minimum sink rate, no side drift, and with the airplane’s longitudinal axis aligned with the center of the runway.
Maintain elevator as recommended by manufacturer during rollout and exit the “soft” area at a speed that would preclude sinking into the surface.
Execute a timely go-around if the approach cannot be made within the tolerances specified above or for any other condition that may result in an unsafe approach or landing.
Maintain proper position of the flight controls and sufficient speed to taxi while on the soft surface.
Analyze and correct common errors related to this Task.
Task E Short-Field Takeoff and Maximum Performance Climb (ASEL, AMEL)
References
AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-9, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands short-field takeoff and maximum performance climb, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Knowledge
Purpose of and procedures for short-field takeoff and maximum performance climb.
Effects of atmospheric conditions, including wind, on takeoff and climb performance.
Best angle of climb speed (VX) and best rate of climb speed (VY).
Appropriate airplane configuration.
Common errors related to this Task.
Risk Management
Selection of runway based on pilot capability, airplane performance and limitations, available distance, and wind.
Effects of:
a. Crosswind
b. Windshear
c. Tailwind
d. Wake turbulence
e. Landing surface/condition
Abnormal operations, including planning for:
a. Rejected takeoff
b. Potential engine failure in takeoff/climb phase of flight
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Verify assigned/correct runway.
Determine wind direction with or without visible wind direction indicators.
Position the flight controls for the existing wind, if applicable.
Clear the area, taxi into takeoff position, and align the airplane on the runway centerline utilizing maximum available takeoff area.
Apply brakes while setting engine power to achieve maximum performance.
Confirm takeoff power prior to brake release and verify proper engine and flight instrument indications prior to rotation.
Rotate and lift off at the recommended airspeed and accelerate to the recommended obstacle clearance airspeed or VX, ±5 knots.
Establish a pitch attitude to maintain the recommended obstacle clearance airspeed or VX, ±5 knots until the obstacle is cleared or until the airplane is 50 feet above the surface.
Establish a pitch attitude for VY and accelerate to VY ±5 knots after clearing the obstacle or at 50 feet above ground level (AGL) if simulating an obstacle.
Configure the airplane in accordance with the manufacturer’s guidance after a positive rate of climb has been verified.
Maintain VY ±5 knots to a safe maneuvering altitude.
Maintain directional control and proper wind-drift correction throughout takeoff and climb.
Comply with noise abatement procedures, as applicable.
Analyze and correct common errors related to this Task.
Task F Short-Field Approach and Landing (ASEL, AMEL)
References
AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-9, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands short-field approach and landing, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Knowledge
Purpose of and procedures for short-field approach and landing.
A stabilized approach, including energy management concepts.
Effects of atmospheric conditions, including wind, on approach and landing performance.
Wind correction techniques on approach and landing.
Common errors related to this Task.
Risk Management
Selection of runway based on pilot capability, airplane performance and limitations, available distance, and wind.
Effects of:
a. Crosswind
b. Windshear
c. Tailwind
d. Wake turbulence
e. Landing surface/condition
Planning for:
a. Rejected landing and go-around
b. Land and hold short operations (LAHSO)
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Ensure the airplane is aligned with the correct/assigned runway.
Scan the landing runway and adjoining area for traffic and obstructions.
Select and aim for a suitable touchdown point considering the wind conditions, landing surface, and obstructions.
Establish the recommended approach and landing configuration, airspeed, and trim, and adjust pitch attitude and power as required to maintain a stabilized approach.
Maintain manufacturer’s published approach airspeed or in its absence not more than 1.3 times the stalling speed or the minimum steady flight speed in the landing configuration (VSO), ±5 knots with gust factor applied.
Maintain directional control and appropriate crosswind correction throughout the approach and landing.
Make smooth, timely, and correct control application before, during, and after touchdown.
Touch down at a proper pitch attitude within 100 feet beyond or on the specified point, threshold markings, or runway numbers, with no side drift, minimum float, and with the airplane’s longitudinal axis aligned with and over the runway centerline.
Use manufacturer’s recommended procedures for airplane configuration and braking.
Execute a timely go-around if the approach cannot be made within the tolerances specified above or for any other condition that may result in an unsafe approach or landing.
Analyze and correct common errors related to this Task.
Task G Confined Area Takeoff and Maximum Performance Climb (ASES, AMES)
References
AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-9, FAA-H-8083-23, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands confined area takeoff and maximum performance climb, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Knowledge
Purpose of and procedures for confined area takeoff and maximum performance climb.
Effects of atmospheric conditions, including wind, on takeoff and climb performance.
Best angle of climb speed (VX) and best rate of climb speed (VY).
Appropriate airplane configuration.
Effects of water surface.
Common errors related to this Task.
Risk Management
Selection of takeoff path based on pilot capability, airplane performance and limitations, available distance, and wind.
Effects of:
a. Crosswind
b. Windshear
c. Tailwind
d. Wake turbulence
e. Water surface/condition
Abnormal operations, including planning for:
a. Rejected takeoff
b. Potential engine failure in takeoff/climb phase of flight
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Verify assigned/correct takeoff path.
Determine wind direction with or without visible wind direction indicators.
Position the flight controls for the existing wind, if applicable.
Clear the area, taxi into takeoff position utilizing maximum available takeoff area, and align the airplane on the takeoff path.
Retract the water rudders, as appropriate.
Establish a pitch attitude that maintains the most efficient planing/lift-off attitude and correct for porpoising and skipping.
Advance the throttle smoothly to takeoff power and confirm proper engine and flight instrument indications prior to rotation.
Avoid excessive water spray on the propeller(s).
Rotate and lift off at the recommended airspeed, and accelerate to the recommended obstacle clearance airspeed or VX.
Establish a pitch attitude to maintain the recommended obstacle clearance airspeed or VX, ±5 knots until the obstacle is cleared or until the airplane is 50 feet above the surface.
Establish a pitch attitude for VY and accelerate to VY ±5 knots after clearing the obstacle or at 50 feet above ground level (AGL) if simulating an obstacle.
Retract flaps, if extended, after a positive rate of climb has been verified or in accordance with airplane manufacturer’s guidance.
Maintain VY ±5 knots to a safe maneuvering altitude.
Maintain directional control and proper wind-drift correction throughout takeoff and climb.
Comply with noise abatement procedures, as applicable.
Analyze and correct common errors related to this Task.
Task H Confined Area Approach and Landing (ASES, AMES)
References
AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-9, FAA-H-8083-23, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands confined area approach and landing, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Knowledge
Purpose of and procedures for confined area approach and landing.
A stabilized approach, including energy management concepts.
Effects of atmospheric conditions, including wind, on approach and landing performance.
Wind correction techniques on approach and landing.
Common errors related to this Task.
Risk Management
Selection of approach path and touchdown area based on pilot capability, airplane performance and limitations, available distance, and wind.
Effects of:
a. Crosswind
b. Windshear
c. Tailwind
d. Wake turbulence
e. Water surface/condition
Planning for a go-around and rejected landing.
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Ensure the airplane is aligned for an approach to the correct/assigned landing surface.
Scan the landing area for traffic and obstructions.
Select and aim for a suitable touchdown point considering the wind conditions, landing surface, and obstructions.
Establish the recommended approach and landing configuration, airspeed, and trim, and adjust pitch attitude and power as required to maintain a stabilized approach.
Maintain manufacturer’s published approach airspeed or in its absence not more than 1.3 VSO, +10/-5 knots with gust factor applied.
Maintain directional control and appropriate crosswind correction throughout the approach and landing.
Make smooth, timely, and correct control application before, during, and after touchdown.
Contact the water at the recommended airspeed with a proper pitch attitude for the surface conditions.
Touch down at a proper pitch attitude, within 100 feet beyond or on the specified point, with no side drift, minimum float, and with the airplane’s longitudinal axis aligned with the projected landing path.
Execute a timely go-around if the approach cannot be made within the tolerances specified above or for any other condition that may result in an unsafe approach or landing.
Apply elevator control as necessary to stop in the shortest distance consistent with safety.
Analyze and correct common errors related to this Task.
Task I Glassy Water Takeoff and Climb (ASES, AMES)
References
AIM; FAA-H-8083-2, FAA-H-8083-9, FAA-H-8083-23, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands glassy-water takeoff and climb, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Note
If a glassy water condition does not exist, the applicant must be evaluated by simulating the Task.
Knowledge
Purpose of and procedures for glassy water takeoff and climb.
Effects of atmospheric conditions, including wind, on takeoff and climb performance.
Best angle of climb speed (VX) and best rate of climb speed (VY).
Appropriate airplane configuration.
Appropriate use of glassy water takeoff and climb technique.
Common errors related to this Task.
Risk Management
Selection of takeoff path based on pilot capability, airplane performance and limitations, and available distance.
Water surface/condition.
Abnormal operations, including planning for:
a. Rejected takeoff
b. Potential engine failure in takeoff/climb phase of flight
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Gear position in an amphibious airplane.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Position flight controls and configure the aircraft for the existing conditions.
Clear the area, select appropriate takeoff path considering surface hazards or vessels and surface conditions.
Retract the water rudders, as appropriate.
Advance the throttle smoothly to takeoff power and confirm proper engine and flight instrument indications prior to rotation.
Establish and maintain an appropriate planing attitude, directional control, and correct for porpoising, skipping, and increase in water drag.
Avoid excessive water spray on the propeller(s).
Use appropriate techniques to lift seaplane from the water considering surface conditions.
Establish proper attitude/airspeed and accelerate to VY ±5 knots during the climb.
Configure the airplane after a positive rate of climb has been verified or in accordance with airplane manufacturer’s instructions.
Maintain VY ±5 knots to a safe maneuvering altitude.
Maintain directional control throughout takeoff and climb.
Analyze and correct common errors related to this Task.
Task J Glassy Water Approach and Landing (ASES, AMES)
References
AIM; FAA-H-8083-2, FAA-H-8083-9, FAA-H-8083-23, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands glassy-water approach and landing, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Note
If a glassy water condition does not exist, the applicant must be evaluated by simulating the Task.
Knowledge
Purpose of and procedures for glassy water approach and landing.
A stabilized approach, including energy management concepts.
Effects of atmospheric conditions, including wind, on approach and landing performance.
When and why glassy water techniques are used.
Common errors related to this Task.
Risk Management
Selection of approach path and touchdown area based on pilot capability, airplane performance and limitations, and available distance.
Water surface/condition.
Planning for a go-around and rejected landing.
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Gear position in an amphibious airplane.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Scan the landing area for traffic and obstructions.
Select a proper approach and landing path considering the landing surface, visual attitude references, water depth, and collision hazards.
Establish the recommended approach and landing configuration, airspeed, and trim, and adjust pitch attitude and power as required to maintain a stabilized approach.
Maintain manufacturer’s published approach airspeed or in its absence not more than 1.3 VSO, ±5 knots.
Make smooth, timely, and correct power and control adjustments to maintain proper pitch attitude and rate of descent to touchdown.
Contact the water in a proper pitch attitude, and slow to idle taxi speed.
Maintain directional control throughout the approach and landing.
Analyze and correct common errors related to this Task.
Task K Rough Water Takeoff and Climb (ASES, AMES)
References
AIM; FAA-H-8083-2, FAA-H-8083-9, FAA-H-8083-23, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands rough water takeoff and climb, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Note
If a rough water condition does not exist, the applicant must be evaluated by simulating the Task.
Knowledge
Purpose of and procedures for a rough water takeoff and climb.
Effects of atmospheric conditions, including wind, on takeoff and climb performance.
Best angle of climb speed (VX) and best rate of climb speed (VY).
Appropriate airplane configuration.
Appropriate use of rough water takeoff and climb technique.
Common errors related to this Task.
Risk Management
Selection of takeoff path based on pilot capability, airplane performance and limitations, available distance, and wind.
Effects of:
a. Crosswind
b. Windshear
c. Tailwind
d. Wake turbulence
e. Water surface/condition
Abnormal operations, including planning for:
a. Rejected takeoff
b. Potential engine failure in takeoff/climb phase of flight
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Gear position in an amphibious airplane.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Verify assigned/correct takeoff path.
Determine wind direction with or without visible wind direction indicators.
Position flight controls and configure the airplane for the existing conditions.
Clear the area, select an appropriate takeoff path considering wind, swells, surface hazards, or vessels.
Retract the water rudders, as appropriate.
Advance the throttle smoothly to takeoff power and confirm proper engine and flight instrument indications prior to rotation.
Establish and maintain an appropriate planing attitude, directional control, and correct for porpoising, skipping, and increase in water drag.
Avoid excessive water spray on the propeller(s).
Lift off at minimum airspeed and accelerate to VY ±5 knots before leaving ground effect.
Configure the airplane after a positive rate of climb has been verified or in accordance with airplane manufacturer’s instructions.
Maintain VY ±5 knots to a safe maneuvering altitude.
Maintain directional control and proper wind-drift correction throughout takeoff and climb.
Analyze and correct common errors related to this Task.
Task L Rough Water Approach and Landing (ASES, AMES)
References
AIM; FAA-H-8083-2, FAA-H-8083-9, FAA-H-8083-23, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands rough water approach, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Note
If a rough water condition does not exist, the applicant must be evaluated by simulating the Task.
Knowledge
Purpose of and procedures for rough water approach and landing.
A stabilized approach, including energy management concepts.
Effects of atmospheric conditions, including wind, on approach and landing performance.
Wind correction techniques on approach and landing.
When and why rough water techniques are used.
Common errors related to this Task.
Risk Management
Selection of approach path and touchdown area based on pilot capability, airplane performance and limitations, available distance, and wind.
Effects of:
a. Crosswind
b. Windshear
c. Tailwind
d. Wake turbulence
e. Water surface/condition
Planning for a go-around and rejected landing.
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Gear position in an amphibious airplane.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Ensure the airplane is aligned with the correct/assigned waterway.
Scan the landing area for traffic and obstructions.
Select and aim for a suitable touchdown point considering the wind conditions, landing surface, and obstructions.
Establish the recommended approach and landing configuration, airspeed, and trim, and adjust pitch attitude and power as required to maintain a stabilized approach.
Maintain manufacturer’s published approach airspeed or in its absence not more than 1.3 times the stalling speed or the minimum steady flight speed in the landing configuration (VSO), ±5 knots with gust factor applied.
Maintain directional control and appropriate crosswind correction throughout the approach and landing.
Make smooth, timely, and correct power and control adjustments to maintain proper pitch attitude and rate of descent to touchdown.
Contact the water in a proper pitch attitude, considering the type of rough water.
Analyze and correct common errors related to this Task.
Task M Slip to a Landing (ASEL, ASES)
References
AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-9, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands a slip to a landing, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Knowledge
Purpose of and procedures for forward or side slip to a landing.
Concepts of energy management during a forward or side slip approach.
Effects of atmospheric conditions, including wind, on approach and landing performance.
Wind correction techniques during a forward or side slip.
Common errors related to this Task.
Risk Management
Selection of runway/landing surface, approach path, and touchdown area based on pilot capability, aircraft performance and limitations, available distance, and wind.
Effects of:
a. Crosswind
b. Windshear
c. Tailwind
d. Wake turbulence
e. Landing surface/condition
Planning for:
a. Rejected landing and go-around
b. Land and hold short operations (LAHSO)
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Forward slip operations, including fuel flowage, tail stalls with flaps, and airspeed control.
Surface contact with the airplane’s longitudinal axis misaligned.
Unstable approach.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Plan and follow a flightpath to the selected landing area considering altitude, wind, terrain, and obstructions.
Select the most suitable touchdown point based on wind, landing surface, obstructions, and airplane limitations.
Position airplane on downwind leg, parallel to landing runway or selected landing surface.
Configure the airplane correctly.
As necessary, correlate crosswind with direction of slip and transition to sideslip as appropriate before touchdown.
Touch down at a proper pitch attitude, within 400 feet beyond or on the specified point, with no side drift, and with the airplane’s longitudinal axis aligned with and over the runway center/landing path.
Maintain a ground track aligned with the runway center/landing path.
Analyze and correct common errors related to this Task.
Task N Go-Around/Rejected Landing
References
AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-9, FAA-H-8083-23, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands go-around/rejected landing with emphasis on factors that contribute to landing conditions that may require a go-around, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Knowledge
Purpose of and procedures for go-around or rejected landing.
A stabilized approach, including energy management concepts.
Effects of atmospheric conditions, including wind and density altitude, on a go-around or rejected landing.
Wind correction techniques on takeoff/departure and approach/landing.
Common errors related to this Task.
Risk Management
Delayed recognition of the need for a go-around/rejected landing.
Delayed performance of a go-around at low altitude.
Power application.
Configuring the airplane.
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Managing a go-around/rejected landing after accepting a LAHSO clearance.
Runway incursion.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Make a timely decision to discontinue the approach to landing.
Apply takeoff power immediately and transition to climb pitch attitude for VX or VY as appropriate ±5 knots.
Configure the airplane after a positive rate of climb has been verified or in accordance with airplane manufacturer’s instructions.
Maneuver to the side of the runway/landing area when necessary to clear and avoid conflicting traffic.
Maintain VY ±5 knots to a safe maneuvering altitude.
Maintain directional control and proper wind-drift correction throughout the climb.
Analyze and correct common errors related to this Task.
Task O Power-Off 180° Accuracy Approach and Landing (ASEL, ASES)
References
AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-9, FAA-H-8083-25; POH/AFM
Objective
To determine the applicant understands a power-off 180° accuracy approach, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Note
See Appendix 3: Aircraft, Equipment, and Operational Requirements & Limitations for information related to this Task.
Knowledge
Purpose of and procedures for proper 180° accuracy approach and landing.
A stabilized approach, including energy management concepts.
Effects of atmospheric conditions, including wind, on approach and landing.
Wind correction techniques on approach and landing.
Common errors related to this Task.
Risk Management
Selection of runway/landing surface, approach path, and touchdown area based on pilot capability, aircraft performance and limitations, available distance, and wind.
Effects of:
a. Crosswind
b. Windshear
c. Tailwind
d. Wake turbulence
e. Landing surface/condition
Planning for:
a. Rejected landing and go-around
b. Land and hold short operations (LAHSO)
Collision hazards.
Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).
Distractions, task prioritization, loss of situational awareness, or disorientation.
Forward slip operations, including fuel flowage, tail stalls with flaps, and airspeed control.
Skills
Complete the appropriate checklist(s).
Make radio calls as appropriate.
Plan and follow a flightpath to the selected landing area considering altitude, wind, terrain, and obstructions.
Select the most suitable touchdown point based on wind, landing surface, obstructions, and aircraft limitations.
Position airplane on downwind leg, parallel to landing runway.
Correctly configure the airplane.
As necessary, correlate crosswind with direction of forward slip and transition to side slip before touchdown.
Touch down at a proper pitch attitude, within 200 feet beyond or on the specified point with no side drift and with the airplane’s longitudinal axis aligned with and over the runway centerline or landing path, as applicable.
Analyze and correct common errors related to this Task.