Skip to Main Content
FlightPushFLIGHTPUSH
Part 61

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. CFR & AIM
  3. CFR
  4. Part 61
  5. § 61.21
Loading
flightpush.co home

14 CFR · Part 61

14 CFR § 61.21

Duration of a Category II and a Category III pilot authorization (for other than part 121 and part 135 use).

← Previous SectionNext Section →
Read in Subpart A
Part 61 Contents
  • Special Federal Aviation Regulation No. 73: Robinson Helicopter Company, Robinson R-22/R-44 Special Training and Experience Requirements
  • Subpart A: General
  • Subpart B: Aircraft Ratings and Pilot Authorizations
  • Subpart C: Student Pilots
  • Subpart D: Recreational Pilots
  • Subpart E: Private Pilots
  • Subpart F: Commercial Pilots
  • Subpart G: Airline Transport Pilots
  • Subpart H: Flight Instructors Other than Flight Instructors With a Sport Pilot Rating
  • Subpart I: Ground Instructors
  • Subpart J: Sport Pilots
  • Subpart K: Flight Instructors With a Sport Pilot Rating
  • Appendix A to Part 61: Airman Certification Standards and Practical Test Standards
(a)

A Category II pilot authorization or a Category III pilot authorization expires at the end of the sixth calendar month after the month in which it was issued or renewed.

(b)

Upon passing a practical test for a Category II or Category III pilot authorization, the authorization may be renewed for each type of aircraft for which the authorization is held.

(c)

A Category II or Category III pilot authorization for a specific type aircraft for which an authorization is held will not be renewed beyond 12 calendar months from the month the practical test was accomplished in that type aircraft.

(d)

If the holder of a Category II or Category III pilot authorization passes the practical test for a renewal in the month before the authorization expires, the holder is considered to have passed it during the month the authorization expired.

Referenced By

Interpretations of This Section (1)

  • Gatlin, 2010

Documents that cite this section, found in their catalog metadata or text. Listed by date, not by significance.

Reflects the eCFR edition current as of July 6, 2026. Retrieved from ecfr.gov on July 17, 2026.

Primary Source

  • Official Source (14 CFR · Part 61)