Skip to Main Content
FlightPushFLIGHTPUSH
Part 29

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. CFR & AIM
  3. CFR
  4. Part 29
  5. § 29.67
Loading
flightpush.co home

14 CFR · Part 29

14 CFR § 29.67

Climb: One engine inoperative (OEI).

← Previous SectionNext Section →
Read in Subpart B
Part 29 Contents
  • Subpart A: General
  • Subpart B: Flight
  • Subpart C: Strength Requirements
  • Subpart D: Design and Construction
  • Subpart E: Powerplant
  • Subpart F: Equipment
  • Subpart G: Operating Limitations and Information
  • Appendix A to Part 29: Instructions for Continued Airworthiness
  • Appendix B to Part 29: Airworthiness Criteria for Helicopter Instrument Flight
  • Appendix C to Part 29: Icing Certification
  • Appendix D to Part 29: Criteria for Demonstration of Emergency Evacuation Procedures Under § 29.803
  • Appendix E to Part 29: HIRF Environments and Equipment HIRF Test Levels
(a)

For Category A rotorcraft, in the critical takeoff configuration existing along the takeoff path, the following apply:

(1)

The steady rate of climb without ground effect, 200 feet above the takeoff surface, must be at least 100 feet per minute for each weight, altitude, and temperature for which takeoff data are to be scheduled with—

(i)

The critical engine inoperative and the remaining engines within approved operating limitations, except that for rotorcraft for which the use of 30-second/2-minute OEI power is requested, only the 2-minute OEI power may be used in showing compliance with this paragraph;

(ii)

The landing gear extended; and

(iii)

The takeoff safety speed selected by the applicant.

(2)

The steady rate of climb without ground effect, 1000 feet above the takeoff surface, must be at least 150 feet per minute, for each weight, altitude, and temperature for which takeoff data are to be scheduled with—

(i)

The critical engine inoperative and the remaining engines at maximum continuous power including continuous OEI power, if approved, or at 30-minute OEI power for rotorcraft for which certification for use of 30-minute OEI power is requested;

(ii)

The landing gear retracted; and

(iii)

The speed selected by the applicant.

(3)

The steady rate of climb (or descent) in feet per minute, at each altitude and temperature at which the rotorcraft is expected to operate and at any weight within the range of weights for which certification is requested, must be determined with—

(i)

The critical engine inoperative and the remaining engines at maximum continuous power including continuous OEI power, if approved, and at 30-minute OEI power for rotorcraft for which certification for the use of 30-minute OEI power is requested;

(ii)

The landing gear retracted; and

(iii)

The speed selected by the applicant.

(b)

For multiengine Category B rotorcraft meeting the Category A engine isolation requirements, the steady rate of climb (or descent) must be determined at the speed for best rate of climb (or minimum rate of descent) at each altitude, temperature, and weight at which the rotorcraft is expected to operate, with the critical engine inoperative and the remaining engines at maximum continuous power including continuous OEI power, if approved, and at 30-minute OEI power for rotorcraft for which certification for the use of 30-minute OEI power is requested.

Reflects the eCFR edition current as of September 29, 2026. Retrieved from ecfr.gov on October 16, 2026.

Primary Source

  • Official Source (14 CFR · Part 29)