14 CFR · Part 29
14 CFR § 29.63
Takeoff: Category B.
The horizontal distance required to take off and climb over a 50-foot obstacle must be established with the most unfavorable center of gravity. The takeoff may be begun in any manner if—
(a)
The takeoff surface is defined;
(b)
Adequate safeguards are maintained to ensure proper center of gravity and control positions; and
(c)
A landing can be made safely at any point along the flight path if an engine fails.
Reflects the eCFR edition current as of September 29, 2026. Retrieved from ecfr.gov on October 16, 2026.
Primary Source