Skip to Main Content
FlightPushFLIGHTPUSH
Part 29

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. CFR & AIM
  3. CFR
  4. Part 29
  5. § 29.1017
Loading
flightpush.co home

14 CFR · Part 29

14 CFR § 29.1017

Oil lines and fittings.

← Previous SectionNext Section →
Read in Subpart E
Part 29 Contents
  • Subpart A: General
  • Subpart B: Flight
  • Subpart C: Strength Requirements
  • Subpart D: Design and Construction
  • Subpart E: Powerplant
  • Subpart F: Equipment
  • Subpart G: Operating Limitations and Information
  • Appendix A to Part 29: Instructions for Continued Airworthiness
  • Appendix B to Part 29: Airworthiness Criteria for Helicopter Instrument Flight
  • Appendix C to Part 29: Icing Certification
  • Appendix D to Part 29: Criteria for Demonstration of Emergency Evacuation Procedures Under § 29.803
  • Appendix E to Part 29: HIRF Environments and Equipment HIRF Test Levels
(a)

Each oil line must meet the requirements of § 29.993.

(b)

Breather lines must be arranged so that—

(1)

Condensed water vapor that might freeze and obstruct the line cannot accumulate at any point;

(2)

The breather discharge will not constitute a fire hazard if foaming occurs, or cause emitted oil to strike the pilot's windshield; and

(3)

The breather does not discharge into the engine air induction system.

Regulations Referenced

14 CFR 29.993

Reflects the eCFR edition current as of September 29, 2026. Retrieved from ecfr.gov on October 16, 2026.

Primary Source

  • Official Source (14 CFR · Part 29)