Skip to Main Content
FlightPushFLIGHTPUSH
Part 27

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. CFR & AIM
  3. CFR
  4. Part 27
  5. § 27.683
Loading
flightpush.co home

14 CFR · Part 27

14 CFR § 27.683

Operation tests.

← Previous SectionNext Section →
Read in Subpart D
Part 27 Contents
  • Subpart A: General
  • Subpart B: Flight
  • Subpart C: Strength Requirements
  • Subpart D: Design and Construction
  • Subpart E: Powerplant
  • Subpart F: Equipment
  • Subpart G: Operating Limitations and Information
  • Appendix A to Part 27: Instructions for Continued Airworthiness
  • Appendix B to Part 27: Airworthiness Criteria for Helicopter Instrument Flight
  • Appendix C to Part 27: Criteria for Category A
  • Appendix D to Part 27: HIRF Environments and Equipment HIRF Test Levels

It must be shown by operation tests that, when the controls are operated from the pilot compartment with the control system loaded to correspond with loads specified for the system, the system is free from—

(a)

Jamming;

(b)

Excessive friction; and

(c)

Excessive deflection.

Reflects the eCFR edition current as of September 29, 2026. Retrieved from ecfr.gov on October 16, 2026.

Primary Source

  • Official Source (14 CFR · Part 27)