General.

← Previous SectionNext Section →
Read in Subpart E
Part 25 Contents
  • Special Federal Aviation Regulation No. 13
  • Special Federal Aviation Regulation No. 109
  • Subpart A: General
  • Subpart B: Flight
  • Subpart C: Structure
  • Subpart D: Design and Construction
  • Subpart E: Powerplant
  • Subpart F: Equipment
  • Subpart G: Operating Limitations and Information
  • Subpart H: Electrical Wiring Interconnection Systems (EWIS)
  • Subpart I: Special Federal Aviation Regulations
  • Appendix A to Part 25
  • Appendix B to Part 25
  • Appendix C to Part 25
  • Appendix D to Part 25
  • Appendix E to Part 25
  • Appendix F to Part 25
  • Appendix H to Part 25: Instructions for Continued Airworthiness
  • Appendix I to Part 25: Installation of an Automatic Takeoff Thrust Control System (ATTCS)
  • Appendix J to Part 25: Emergency Evacuation
  • Appendix K to Part 25: Extended Operations (ETOPS)
  • Appendix L to Part 25: HIRF Environments and Equipment HIRF Test Levels
  • Appendix M to Part 25: Fuel Tank System Flammability Reduction Means
  • Appendix N to Part 25: Fuel Tank Flammability Exposure and Reliability Analysis
  • Appendix O to Part 25: Supercooled Large Drop Icing Conditions
(a)

Each fuel system must be constructed and arranged to ensure a flow of fuel at a rate and pressure established for proper engine and auxiliary power unit functioning under each likely operating condition, including any maneuver for which certification is requested and during which the engine or auxiliary power unit is permitted to be in operation.

(b)

Each fuel system must be arranged so that any air which is introduced into the system will not result in—

(1)

Power interruption for more than 20 seconds for reciprocating engines; or

(2)

Flameout for turbine engines.

(c)

Each fuel system for a turbine engine must be capable of sustained operation throughout its flow and pressure range with fuel initially saturated with water at 80 °F and having 0.75cc of free water per gallon added and cooled to the most critical condition for icing likely to be encountered in operation.

(d)

Each fuel system for a turbine engine powered airplane must meet the applicable fuel venting requirements of part 34 of this chapter.