Skip to Main Content
FlightPushFLIGHTPUSH
Part 25

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. CFR & AIM
  3. CFR
  4. Part 25
  5. § 25.683
Loading
flightpush.co home

14 CFR · Part 25

14 CFR § 25.683

Operation tests.

← Previous SectionNext Section →
Read in Subpart D
Part 25 Contents
  • Special Federal Aviation Regulation No. 13
  • Special Federal Aviation Regulation No. 109
  • Subpart A: General
  • Subpart B: Flight
  • Subpart C: Structure
  • Subpart D: Design and Construction
  • Subpart E: Powerplant
  • Subpart F: Equipment
  • Subpart G: Operating Limitations and Information
  • Subpart H: Electrical Wiring Interconnection Systems (EWIS)
  • Subpart I: Special Federal Aviation Regulations
  • Appendix A to Part 25
  • Appendix B to Part 25
  • Appendix C to Part 25
  • Appendix D to Part 25
  • Appendix E to Part 25
  • Appendix F to Part 25
  • Appendix H to Part 25: Instructions for Continued Airworthiness
  • Appendix I to Part 25: Installation of an Automatic Takeoff Thrust Control System (ATTCS)
  • Appendix J to Part 25: Emergency Evacuation
  • Appendix K to Part 25: Extended Operations (ETOPS)
  • Appendix L to Part 25: HIRF Environments and Equipment HIRF Test Levels
  • Appendix M to Part 25: Fuel Tank System Flammability Reduction Means
  • Appendix N to Part 25: Fuel Tank Flammability Exposure and Reliability Analysis
  • Appendix O to Part 25: Supercooled Large Drop Icing Conditions
(a)

It must be shown by operation tests that when portions of the control system subject to pilot effort loads are loaded to 80 percent of the limit load specified for the system and the powered portions of the control system are loaded to the maximum load expected in normal operation, the system is free from—

(1)

Jamming;

(2)

Excessive friction; and

(3)

Excessive deflection.

(b)

It must be shown by analysis and, where necessary, by tests, that in the presence of deflections of the airplane structure due to the separate application of pitch, roll, and yaw limit maneuver loads, the control system, when loaded to obtain these limit loads and operated within its operational range of deflections, can be exercised about all control axes and remain free from—

(1)

Jamming;

(2)

Excessive friction;

(3)

Disconnection; and

(4)

Any form of permanent damage.

(c)

It must be shown that under vibration loads in the normal flight and ground operating conditions, no hazard can result from interference or contact with adjacent elements.

Reflects the eCFR edition current as of September 29, 2026. Retrieved from ecfr.gov on October 16, 2026.

Primary Source

  • Official Source (14 CFR · Part 25)