Skip to Main Content
FlightPushFLIGHTPUSH
Part 25

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. CFR & AIM
  3. CFR
  4. Part 25
  5. § 25.523
Loading
flightpush.co home

14 CFR · Part 25

14 CFR § 25.523

Design weights and center of gravity positions.

← Previous SectionNext Section →
Read in Subpart C
Part 25 Contents
  • Special Federal Aviation Regulation No. 13
  • Special Federal Aviation Regulation No. 109
  • Subpart A: General
  • Subpart B: Flight
  • Subpart C: Structure
  • Subpart D: Design and Construction
  • Subpart E: Powerplant
  • Subpart F: Equipment
  • Subpart G: Operating Limitations and Information
  • Subpart H: Electrical Wiring Interconnection Systems (EWIS)
  • Subpart I: Special Federal Aviation Regulations
  • Appendix A to Part 25
  • Appendix B to Part 25
  • Appendix C to Part 25
  • Appendix D to Part 25
  • Appendix E to Part 25
  • Appendix F to Part 25
  • Appendix H to Part 25: Instructions for Continued Airworthiness
  • Appendix I to Part 25: Installation of an Automatic Takeoff Thrust Control System (ATTCS)
  • Appendix J to Part 25: Emergency Evacuation
  • Appendix K to Part 25: Extended Operations (ETOPS)
  • Appendix L to Part 25: HIRF Environments and Equipment HIRF Test Levels
  • Appendix M to Part 25: Fuel Tank System Flammability Reduction Means
  • Appendix N to Part 25: Fuel Tank Flammability Exposure and Reliability Analysis
  • Appendix O to Part 25: Supercooled Large Drop Icing Conditions
(a)

Design weights. The water load requirements must be met at each operating weight up to the design landing weight except that, for the takeoff condition prescribed in § 25.531, the design water takeoff weight (the maximum weight for water taxi and takeoff run) must be used.

(b)

Center of gravity positions. The critical centers of gravity within the limits for which certification is requested must be considered to reach maximum design loads for each part of the seaplane structure.

Regulations Referenced

14 CFR 25.531

Reflects the eCFR edition current as of September 29, 2026. Retrieved from ecfr.gov on October 16, 2026.

Primary Source

  • Official Source (14 CFR · Part 25)