14 CFR · Part 25
14 CFR § 25.1438
Pressurization and pneumatic systems.
(a)
Pressurization system elements must be burst pressure tested to 2.0 times, and proof pressure tested to 1.5 times, the maximum normal operating pressure.
(b)
Pneumatic system elements must be burst pressure tested to 3.0 times, and proof pressure tested to 1.5 times, the maximum normal operating pressure.
(c)
An analysis, or a combination of analysis and test, may be substituted for any test required by paragraph (a) or (b) of this section if the Administrator finds it equivalent to the required test.
Reflects the eCFR edition current as of September 29, 2026. Retrieved from ecfr.gov on October 16, 2026.
Primary Source