14 CFR · Part 121
14 CFR § 121.665
Load manifest.
Each certificate holder is responsible for the preparation and accuracy of a load manifest form before each takeoff. The form must be prepared and signed for each flight by employees of the certificate holder who have the duty of supervising the loading of aircraft and preparing the load manifest forms or by other qualified persons authorized by the certificate holder.
Referenced By
Interpretations of This Section (2)
Advisory Circulars (2)
Documents that cite this section, found in their catalog metadata or text. Listed by date, not by significance.
Reflects the eCFR edition current as of September 29, 2026. Retrieved from ecfr.gov on October 16, 2026.
Primary Source