Skip to Main Content
FlightPushFLIGHTPUSH
Part 121

Learn

Dashboard My Courses Mastery Map Practice Flight Bag

Resources

CFR & AIM FAA Orders Handbooks & Guides Certification Standards Pilot/Controller Glossary Advisory Circulars Legal Interpretations
Safety Center
Articles Trust Center
Help Center FAQ Status
  1. Reference Library
  2. CFR & AIM
  3. CFR
  4. Part 121
  5. § 121.199
Loading
flightpush.co home
Loading reference

14 CFR · Part 121

14 CFR § 121.199

Nontransport category airplanes: Takeoff limitations.

← Previous SectionNext Section →
Read in Subpart I
Part 121 Contents
  • Subpart A: General
  • Subpart E: Approval of Routes: Domestic and Flag Operations
  • Subpart F: Approval of Areas and Routes for Supplemental Operations
  • Subpart G: Manual Requirements
  • Subpart H: Aircraft Requirements
  • Subpart I: Airplane Performance Operating Limitations
  • Subpart J: Special Airworthiness Requirements
  • Subpart K: Instrument and Equipment Requirements
  • Subpart L: Maintenance, Preventive Maintenance, and Alterations
  • Subpart M: Airman and Crewmember Requirements
  • Subpart N: Training Program
  • Subpart O: Crewmember Qualifications
  • Subpart P: Aircraft Dispatcher Qualifications and Duty Time
  • Subpart Q: Flight Time Limitations and Rest Requirements: Domestic Operations
  • Subpart R: Flight Time Limitations: Flag Operations
  • Subpart S: Flight Time Limitations: Supplemental Operations
  • Subpart T: Flight Operations
  • Subpart U: Dispatching and Flight Release Rules
  • Subpart V: Records and Reports
  • Subpart W: Crewmember Certificate: International
  • Subpart X: Emergency Medical Equipment and Training
  • Subpart Y: Advanced Qualification Program
  • Subpart Z: Hazardous Materials Training Program
  • Subpart AA: Continued Airworthiness and Safety Improvements
  • Subpart DD: Special Federal Aviation Regulations
  • Appendix A to Part 121: First Aid Kits and Emergency Medical Kits
  • Appendix B to Part 121: Airplane Flight Recorder Specification
  • Appendix C to Part 121: C-46 Nontransport Category Airplanes
  • Appendix D to Part 121: Criteria for Demonstration of Emergency Evacuation Procedures Under § 121.291
  • Appendix E to Part 121: Flight Training Requirements
  • Appendix F to Part 121: Proficiency Check Requirements
  • Appendix G to Part 121: Doppler Radar and Inertial Navigation System (INS): Request for Evaluation; Equipment and Equipment Installation; Training Program; Equipment Accuracy and Reliability; Evaluation Program
  • Appendix H to Part 121: Advanced Simulation
  • Appendix K to Part 121: Performance Requirements for Certain Turbopropeller Powered Airplanes
  • Appendix L to Part 121: Type Certification Regulations Made Previously Effective
  • Appendix M to Part 121: Airplane Flight Recorder Specifications
  • Appendix O to Part 121: Hazardous Materials Training Requirements For Certificate Holders
  • Appendix P to Part 121: Requirements for ETOPS and Polar Operations
(a)

No person operating a nontransport category airplane may take off that airplane at a weight greater than the weight that would allow the airplane to be brought to a safe stop within the effective length of the runway, from any point during the takeoff before reaching 105 percent of minimum control speed (the minimum speed at which an airplane can be safely controlled in flight after an engine becomes inoperative) or 115 percent of the power off stalling speed in the takeoff configuration, whichever is greater.

(b)

For the purposes of this section—

(1)

It may be assumed that takeoff power is used on all engines during the acceleration;

(2)

Not more than 50 percent of the reported headwind component, or not less than 150 percent of the reported tailwind component, may be taken into account;

(3)

The average runway gradient (the difference between the elevations of the endpoints of the runway divided by the total length) must be considered if it is more than one-half of 1 percent;

(4)

It is assumed that the airplane is operating in standard atmosphere; and

(5)

The effective length of the runway for takeoff means the distance from the end of the runway at which the takeoff is started to a point at which the obstruction clearance plane associated with the other end of the runway intersects the runway centerline.

Reflects the eCFR edition current as of September 29, 2026. Retrieved from ecfr.gov on October 16, 2026.

Primary Source

  • Official Source (14 CFR · Part 121)