Safety Recommendation A-93-090

Recommendation

THE NTSB RECOMMENDS THAT THE DEPARTMENT OF TRANSPORTATION: REQUIRE THAT, AS A CONDITION FOR LICENSE FOR COMMERCIAL SPACE LAUNCHES, AS A MINIMUM, THE COMPANY APPLYING FOR THE LICENSE INCLUDE IN ITS LICENSE APPLICATION: A PROVISION FOR MANDATORY REST PERIODS BEFORE THE LAUNCH FOR KEY PARTICIPANTS THAT PROVIDE FOR AN ADEQUATE AND SPECIFIED TIME PERIOD FOR UNINTERRUPTED SLEEP. THE QUANTITATIVE CRITERIA FOR SUCH REST PERIODS SHOULD BE DEVELOPED BY APPROPRIATE HUMAN PERFORMANCE EXPERTS TO ENSURE APPLICABILITY TO THE ASSIGNED TASKS.

Safety Issue and Context

ON FEBRUARY 9, 1993, ABOUT 0930 EASTERN STANDARD TIME, THE LAUNCH SEQUENCE FOR AN ORBITAL SCIENCES CORPORATION (OSC) PEGASUS EXPENDABLE LAUNCH VEHICLE (ELV) WAS ABORTED BY THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) RANGE SAFETY OFFICERS, IN ACCORDANCE WITH A PREVIOUSLY ESTABLISHED LAUNCH CONSTRAINT. SEVERAL SECONDS LATER, THE LAUNCH SEQUENCE WAS REINITIATED BY THE OSC TEST CONDUCTOR, AND THE MISSILE SEPARATED UNEVENTFULLY FROM ITS CARRIER AIRCRAFT. THE IGNITION AND STAGING OF THE PEGASUS AND ITS SUBSEQUENT DEPLOYMENT OF TWO SATELLITES INTO LOW EARTH ORBIT WERE ALSO UNEVENTFUL. THERE WERE NO INJURIES TO PERSONNEL INVOLVED IN THE MISSION AND NO DAMAGE TO MISSION ASSETS.

Response History

August 26, 1999 · NTSB Correspondence · DOT

THE SAFETY BOARD NOTES THAT THE FAA'S FINAL RULE MEETS THE INTENT OF OUR RECOMMENDATIONS. THEREFORE, A-93-90 IS CLASSIFIED "CLOSED--ACCEPTABLE ALTERNATE ACTION," SINCE EXISTING LAUNCH CENTER CREW ENDURANCE POLICIES WILL BE USED.

May 25, 1999 · Recipient Response · DOT

THE FAA RESPONSE LETTER DOES NOT ADDRESS THIS RECOMMENDATION, RATHER THE INCLUDED FEDERAL REGISTER FINAL RULE (14 CFR PARTS 401 ET AL. FINAL RULE) PART 415 (LAUNCH LICENSE) SUBPART C SAFETY REVIEW,,,,SECTION 37 (A) (4) STATES: DRESS REHEARSAL PROCEDURES THAT (1) ENSURE CREW READINESS UNDER NOMINAL AND NON-NOMINAL FLIGHT CONDITIONS. SECTION (5) PROCEDURES FOR ENSURING LICENSEE'S FLIGHT SAFETY PERSONNEL ADHERE TO FEDERAL LAUNCH RANGE CREW REST RULES.

September 4, 1997 · Recipient Response · DOT

It was previously reported to the Board that changes were incorporated into the launch applications guidelines. The FAA has now published a notice of proposed rulemaking (NPRM) in the Federal Register proposing to clarify license application procedures and requirements for conducting space launches. This NPRM addresses the requirements for launch operations at federally operated launch ranges. I have enclosed a copy of the NPRM for the Board's information. Additionally, the FAA is initiating a separate rulemaking action proposing similar requirements to address launches from non-Federal sites.

I will provide the Board with a copy of the final regulatory document as soon as it is issued.

April 22, 1994 · NTSB Correspondence · DOT

THE BOARD NOTES THAT THE OCST, AS A PART OF ITS LICENSING PROCESS, REQUIRES APPLICANTS TO SUBMIT A DESCRIPTION OF THEIR SAFETY ORGANIZATION & PERSONNEL REQUIREMENTS. THE OCST IS ALSO STUDYING THE NEED TO EXPLICITY REQUIRE THAT APPLICANTS PROVIDE CLEARLY DELIENATED STATEMENTS OF AUTHORITY FOR ALL PARTIES & KEY INDIVIDUALS INVOLVED IN THE LAUNCH. THE BOARD NOTES THAT THE OCST REQUIRES, THROUGH THE LICENSING PROCESS, ALL APPLICANTS TO DEMONSTRATE THEIR CAPABILITY TO CONDUCT SAFE LAUNCH OPERATIONS.

DUE TO THE APPARENT DEFICIENCIES IN PRELAUNCH OPERATIONS FOR THE PEGASUS/SCD-1 LAUNCH, THE OCST IS EVALUATING WHETHER TO REQUIRE THAT LAUNCH LICENSE APPLICANTS PROVIDE MORE SPECIFIC DETAILS & CRITERIA FOR LAUNCH READINESS REVIEWS & DRESS REHEARSALS, & THAT THOSE CRITERIA BE INCORPORATED AS CONDITIONS OF LICENSING. THE BOARD NOTES THAT ALTHOUGH THE OCST'S LICENSING PROCESS INCLUDES A REVIEW OF CRITERIA FOR DETERMINING READINESS TO LAUNCH, THE OCST IS STUDYING THE NEED TO REQUIRE THAT APPLICANTS EXPLICITLY DESCRIBE THEIR PROCESS FOR APPROVING CHECKLISTS FOR A LAUNCH, & TO INCLUDE A PROVISION FOR ENSURING THE CURRENCY & CONSISTENCY OF EACH PARTICIPANT'S CHECKLIST DURING DRESS REHEARSALS.

THE BOARD NOTES THAT THE OCST IS STUDYING THE NEED TO EXPLICITLY REQUIRE, AS A CONDITION FOR A LICENSE, THE MANDATORY REST PERIODS DESCRIBED ABOVE. ADDITIONALLY, IF THE OCST DETERMINES THAT SUCH A CONDITION IS NECESSARY, IT WILL USE HUMAN PERFORMANCE EXPERTS TO DEVELOP QUANTITATIVE CRITERIA FOR SUCH REST PERIODS TO ENSURE APPLICABILITY TO THE ASSIGNED TASKS. THE BOARD NOTES THAT THE OCST IS STUDYING THOSE LAUNCH SCENARIOS & TECHNOLOGIES WHERE IT WOULD BE APPROPRIATE TO REQUIRE FROM APPLICANTS, AS A CONDITION FOR A LICENSE, A COMMUNICATION PLAN INCLUDING THE TWO PROVISIONS IDENTIFIED IN A-93-091.

THE BOARD NOTES THE AT THE OCST IS INCORPORATING INTO ITS LICENSING REVIEW PROCESS THE REQUIREMENT FOR SAFETY DIRECTIVE HAVING STRICT CONFIGURATION CONTROL REQUIREMENTS THAT CLEARLY LISTS AND CONSOLIDATES ALL OPERATIONS INVOLVING THE SAFETY OF THE LAUNCH. THE BOARD NOTES THE OCST IS RESEARCHING THE COMMUNICATION ISSUE IN GENERAL & IS ALSO ASSESSING OPERATIONAL ISSUES IN THE CONTEXT OF AN ORBITAL SCIENCES CORPORATION PROPOSAL TO LAUNCH THE PEGASUS FROM COMMERICAL L-1011 AIRCRAFT.

THE BOARD APPRECIATES YOUR RESPONSE TO RECOMMENDATIONS A-93-87 THROUGH -93 & HAS PLACED THE RECOMMENDATIONS IN AN "OPEN--ACCEPTABLE RESPONSE" STATUS PENDING COMPLETION OF THE ACTIONS INITIATED BY THE OCST AS DESCRIBED IN YOUR JANUARY 11, 1994, LETTER.

January 11, 1994 · Recipient Response · DOT

OCST AGREES THAT IT IS IMPORTANT FOR ENSURING SAFETY THAT LAUNCH PERSONNEL HAVE ADEQUATE REST. LAUNCH PERSONNEL OFTEN WORK MANY HOURS PRIOR TO LAUNCHES, & THE TIME OF DAY IN WHICH CRITICAL SAFETY & LAUNCH OPERATIONS ARE CONDUCTED IS OFTEN DEPENDENT ON FACTORS BEYOND THE CONTROL OF THE LAUNCH TEAM, SUCH AS FACTORS DICTATED BY ORBITAL MECHANICS. AN APPLICANT'S PERSONNEL REQUIREMENTS, WHICH MAY INCLUDE PROVISIONS FOR REST, HAVE ALWAYS BEEN REVIEWED BY OCST. OCST IS STUDYING THE NEED TO EXPLICITLY REQUIRE AS A CONDITION FOR LICENSE A PROVISION FOR MANDATORY REST PERIODS BEFORE LAUNCH FOR KEY PARTICIPANTS THAT PROVIDE FOR AN ADEQUATE & SPECIFIED TIME PERIOD OF UNINTERRUPTED SLEEP.

IF IT IS DETERMINED THAT SUCH A CONDITION IS NECESSARY, QUANTITATIVE CRITERIA FOR SUCH REST PERIODS WILL BE DEVELOPED BY APPROPRIATE HUMAN PERFORMANCE EXPERTS TO ENSURE APPLICABILITY TO THE ASSIGNED TASKS.

Read Recommendation

Recommendation Facts

Status
Closed - Acceptable Alternate Action
Issued
August 17, 1993
Priority
CLASS II
Recipient
DOT
Adopted
July 26, 1993
Closed
August 26, 1999
Related Investigation
80025
Related Report
SIR-93-02