Q2 - 2019 Airport Construction Impact Report

FAASTeam library-192349SafetyRunwayWeatherMaintenance

In Brief

What It Addresses

Disclaimer: Not for operational use. This report contains active and planned airport construction projects, which may impact airport capacity and delays.

From the Document: selected source passages, quoted as written, for a quick overview.

Q2-2019 Airport Construction Impact Report

U.S. Core 30+ Airports

3-Year Construction Outlook

System Operations Services - Performance Analysis

FAA National Headquarters

Washington, DC 20591

April 1, 2019

Compiled by: AJR-G5

POC: ted.sandstrom@faa.gov

Disclaimer: Not for operational use. This report contains active and planned airport construction projects, which may impact airport capacity and delays. Due to the nature of airport construction, this information is constantly changing and may be postponed or canceled at any time. This report will be updated quarterly.

Figure (page 1)
Figure (page 1)

Table of Contents Q2 2019 Airport Construction Impact Report Impact Summary4

East-North Service Area5 BOS—General Edward Lawrence Logan International Airport6 BWI—Baltimore-Washington Thurgood Marshall International Airport7 DCA—Ronald Reagan Washington National Airport8 EWR—Newark Liberty International Airport9 IAD—Washington Dulles International Airport13 JFK—John F. Kennedy International Airport15 LGA—LaGuardia Airport18

PHL—Philadelphia International Airport21

East-South Service Area22 ATL—Hartsfield-Jackson Atlanta International Airport23 CLT—Charlotte/Douglas International Airport26 FLL—Fort Lauderdale/Hollywood International Airport28 MCO—Orlando International Airport30

MIA—Miami International Airport32

TPA—Tampa International Airport33

Central Service Area35 DFW—Dallas/Fort Worth International Airport36 DTW—Detroit Metropolitan Wayne County Airport38 IAH—George Bush Intercontinental/Houston Airport40 MDW—Chicago Midway International Airport41 MEM—Memphis International Airport42 MSP—Minneapolis-St. Paul International/Wold-Chamberlain Airport43 ORD—Chicago-O'Hare International Airport45

Western Service Area49

DEN—Denver International Airport50

HNL—Daniel K. Inouye International Airport51

LAS—McCarran International Airport53

LAX—Los Angeles International Airport54

PHX—Phoenix Sky Harbor International Airport57

SAN—San Diego International Airport58

SEA—Seattle-Tacoma International Airport59

SFO—San Francisco International Airport60

SLC—Salt Lake City International Airport63

Additional Airports64

ANC—Ted Stevens Anchorage International Airport65

PBI—Palm Beach International Airport66

IATA Airport-Level Designations

Level 1 – Airport infrastructure capacity is generally adequate to meet the demands of airport users at all times Level 2 – Airports where potential for congestion exists during some periods that can be resolved by schedule adjustments mutually agreed between the airlines and facilitator Level 3 – Airports with full slot controls where demand for airport infrastructure significantly exceeds the capacity during certain periods and expansion of infrastructure to meet demand is not possible in the short term

Construction Impact Key

No Capacity Effect – Departures taxi delays and/or Arrivals airborne holding delays are 15 minutes or less Reduced Capacity and Delay Impact – Departures taxi delays and/or Arrivals airborne holding delays of 16 to 45 minutes Reduced Capacity and Greater Delay Impact – Departures taxi delays and/or Arrivals airborne holding delays greater than 45 minutes

Impact Summary Q2 2019 Airport Construction Impact Report

The below figure provides a broad overview of all construction with the potential to impact the NAS at the Core 30 Airports. Expanded details for each of the specific airports can be found on the following pages.

Return to Table

of Contents

Year 2019 2020 2021 Month JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Service

Area Airport

East-North

BOS

BWI

DCA

EWR

IAD

JFK

LGA

PHL

East-South

ATL

CLT

FLL

MCO

MIA

TPA

Central

DFW

DTW

IAH

MDW

MEM

MSP

ORD

Western

DEN

HNL

LAS

LAX

PHX

SAN

SEA

SFO

SLC

Addt'l ANC

PBI No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined 4 East-North Service Area, Impact Summary, Carrier Distribution Q2 2019 Airport Construction Impact Report Key:

Air Canada-ACA

American-AAL

Cape Air-KAP

Delta-DAL

JetBlue-JBU

Other *less than

4%

Southwest-SWA

Spirit-NKS

Trans State-LOF

United-UAL

2019 2020 2021

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC BOS

BWI

DCA

EWR

IAD

JFK

LGA

PHL No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined Return to Table of Contents

Figure (page 5)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A TWY C Bypass

B RWY 4R Lighting

C TWY B Lighting

Project Description of Work Estimated Dates Status Impact Notes

A TWY C Bypass Construction of a stub/bypass taxiway near the approach end of RWY 33L. 06/01/2018 to 01/08/2019 Complete To provide an additional access between RWY 15R/33L and TWY C.

B RWY 4R Lighting Replacing all of the risers on the lights on the RWY. March 2019 to April 2019 In Progress Work to be completed on the overnights, so no anticipated impact to RWY availability.

C TWY B Lighting Taxiway B centerline lights replacement June 2019 to July 2019 Upcoming Expecting ramp and taxiway congestion.

Return to Table

of Contents BOS—General Edward Lawrence Logan International Airport Q2 2019 Airport Construction Impact Report

Figure (page 6)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A TWY S

B TWY B

Project Description of Work Estimated Dates Status Impact Notes

A TWY S TWY S, between TWYs P and N, requires improvements prior to TWY B closing. 03/11/2019 to 04/30/2019 In Progress TWY S is a parallel taxiway to TWY B that will receive all of TWY B’s traffic once TWY B closes.

B TWY B TWY B requires resurfacing between TWYs P & N. 04/30/2019 to 10/31/2019 Upcoming TWY B will be closed between TWYs P & N. At this time, no impact is expected. Existing talk with the airport authorities regarding dates and longevity.

Return to Table

of Contents BWI—Baltimore-Washington Thurgood Marshall International Airport Q2 2019 Airport Construction Impact Report

Figure (page 7)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A North Concourse

B Ramp Configuration

Project Description of Work Estimated Dates Status Impact Notes

A North Concourse New regional concourse gates replacing surface gates. 04/19/2017 to 03/19/2021 In Progress

Safety Risk Assessment determined medium risk due to controller workload increase.

New 14 regional Jet (RJ) gates with jet bridges will allow handling of larger aircraft with 76-seats, versus current restriction of smaller aircraft with 50-seats.

B Ramp Configuration New ramp configuration for AAL commuters. 04/06/2019 to 2020 TBD Upcoming May have some impact on DCA operations. No end date at this time.

Return to Table

of Contents

DCA—Ronald Reagan Washington National Airport Q2 2019 Airport Construction Impact Report

Figure (page 8)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A Terminal One

B TWY Y

C RWY Status Lights

Project Description of Work Estimated Dates Status Impact Notes

A Terminal One

Terminal One redevelopment program. Demolition of existing Terminal A complex and construction of new Terminal One complex. Construction involves all infrastructure required to support a 33 gate terminal complex.

01/01/2018 to 06/20/2022 TBD In Progress

Multi-phased project. Expect taxiing delays in/out

due to ramp congestion.

Partial Terminal Opening, Q3-2021 (21 Gates)

Full Terminal Opening, Q3-2022 (33 Gates)

B TWY Y TWY Y closed for rehabilitation. Milling and overlay asphalt between TWY RM and TWY S. 02/01/2018 to 06/20/2019 In Progress Project work includes updating of taxiway lighting as necessary to meet current FAA standards.

C RWY Status Lights Install Runway Status Lights (RWSL) at RWY entrances for RWY 11/29 and RWY 4L/22R. Q1 2019 TBD to Q2 2019 TBD In Progress Fiber optic cable rerouting is complete. Expecting final splicing near end of March 2019.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined EWR (1 of 4)—Newark Liberty International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 9)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC D TWY D

E South TWYs & Ramp Area

Project Description of Work Estimated Dates Status Impact Notes

D TWY D TWY D closed for rehabilitation. Milling and overlay asphalt between TWY N and TWY B. 01/01/2019 to 03/01/2019 Complete

Project work includes replacement of the three-inch asphalt overlay and associated electrical lighting and signage work to ensure compliance with FAA standards.

E South TWYs & Ramp Area Rehabilitation and paving of South TWYs and ramp areas. April 2019 to 2021 TBD Upcoming Expecting ramp and taxiway congestion.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined EWR (2 of 4)—Newark Liberty International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 10)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC F RWY 11/29 & TWYs

Project Description of Work Estimated Dates Status Impact Notes

F RWY 11/29 & TWYs

STAGE 1 - RWY 11/29 rehabilitation. Crossing

TWYs rehabilitation.

Lighting systems upgrade/replacement.

Taxiway renaming, airfield signage, and pavement

surface sensors.

05/01/2019 to 11/23/2019 Upcoming

5/1-8/18 runway closed 10pm–1pm (15 hrs.)

8/19-9/9 runway closed continuous (21 days)

9/10-10/23 runway closed 10pm–1pm (15 hrs.)

10/11-10/13 runway grooving, 1 extended weekend

(up to 18 hrs.), non-concurrent

10/24-11/23 runway closed 10pm–7am (9 hrs.)

STAGE 2 - Two 38-hour extended weekends, Fri

11pm-Sun 1pm , on 6/14 – 6/16 and 6/21 – 6/23 10-hour weekday nights, 10pm-8am, 6/16 – 6/21 06/14/2019 to 06/21/2019 Upcoming Runway 4L/22R Shortened at TWY M Takeoff distance available (TODA) 9510

Landing distance available (LDA) 4L-6970, 22R-9510

STAGE 3 - Two 38-hour extended weekends, Fri

11pm-Sun 1pm, on 7/12 – 7/14 and 7/19 – 7/21 10-hour weekday nights, 10pm-8am, 7/14 – 7/19 07/12/2019 to 07/21/2019 Upcoming Runway 4R/22L Shortened at TWY M Takeoff distance available (TODA) 8165

Landing distance available (LDA) 6955 STAGE 5 - TWY S close continuous-7 Days 07/01/2019 to 07/08/2019 TBD Upcoming Expecting ramp and taxiway congestion.

STAGE 4 - TWY S closed with 11/29 for

rehabilitation, lighting, and signage. 08/19/2019 to 09/09/2019 Upcoming Closure - 21 days

Expecting ramp and taxiway congestion.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined EWR (3 of 4)—Newark Liberty International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 11)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC G RWY 4L, End-Around TWY

(South End)

H RWY 22R, End-around TWY

(North End)

I RWY 4R/22L

Project Description of Work Estimated Dates Status Impact Notes

G RWY 4L, End-Around TWY

(South End) Construction of a new end-around taxiway (EAT). 2020 TBD Upcoming

Project is not in the Capital Plan.

EAT would begin near TXY PA (near FedEx building)

follow the perimeter of the dike and existing parking lot, and connect to TXY P between RWYs 4L and 4R.

H RWY 22R, End-around TWY

(North End) Construction of a new end-around taxiway and

470’ runway extension. 2020 TBD Upcoming

Project is not in the Capital Plan.

EAT would begin near TWY Z. The runway will be extended 470’ and the EAT will extend 1,500’ northeast. The EAT will loop to Brewster Road to

TWY Z, connecting it to RWY 22L.

I RWY 4R/22L RWY 4R/22L closed for rehabilitation. Includes

milling and overlay. Will shift the RWY centerline slightly. 2021 TBD Upcoming

Return to Table of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined EWR (4 of 4)—Newark Liberty International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 12)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A Taxilane B (Middle)

B RWY 19L ALSF-2

Project Description of Work Estimated Dates Status Impact Notes

A Taxilane B (Middle) Reconstruction and widening between Taxilane A2 and A4. 04/01/2019 to 11/22/2019 Upcoming Requiring Group IV and larger aircraft to exit and enter the apron on the side of the construction that they park on, increasing taxi distance/time.

B RWY 19L ALSF-2

Update RWY19L Approach Lighting System with

Sequence Flashing Lights (ALSF-2).

Open trench work at the approach end of RWY

19L.

05/27/2019 to 09/27/2019 Upcoming

RWY1R/19L operational impacts due to work inside

the RSA. Possible three-week closure at night to complete project. Possible displaced threshold. AT notified of project by Tech Ops. Current mitigation for the least amount of disruption to users.

Return to Table

of Contents IAD (1 of 2)—Washington Dulles International Airport Q2 2019 Airport Construction Impact Report

Figure (page 13)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC C RWY 1C/19C

D TWYs Y, Y2, Y3, Y4, & Y5

Project Description of Work Estimated Dates Status Impact Notes

C RWY 1C/19C Reconstruction of the North section of RWY

1C/19C & High Speed TWYs Y2, Y3, Y4 & Y5, inside the Runway Safety Area (RSA). 04/06/2020 to 11/20/2020 Upcoming Crossing TWYs W2, W3 and W4 will remain open for aircraft arriving or departing RWY 1L/19R.

D TWYs Y, Y2, Y3, Y4, & Y5

Reconstruction & widening of TWYs Y, Y3, & Y4, outside the RSA.

Reconstruction of TWYs Y2, Y3, Y4 & Y5, outside

the RSA.

April 2020 to November 2020 Upcoming

Project will coincide with RWY 1C/19C construction.

Loss of capacity on RWYS 1C and 19C due to closure of first 2 high-speed exits for RWY 19C and the closure of last 2 high-speed exits for RWY 1C.

Greater in-trail spacing will be required due to the

increased RWY runway occupancy time.

Return to Table

of Contents IAD (2 of 2)—Washington Dulles International Airport Q2 2019 Airport Construction Impact Report

Figure (page 14)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A Electrical Duct Bank

Project Description of Work Estimated Dates Status Impact Notes

A Electrical Duct Bank

Fiber Optic Telecommunication System - FOTS.

Laying approximately 8000’ of conduit North of

RWY 13L/31R and TWY C using underground

boring and trenching.

01/21/2019 to 04/01/2019 TBD In Progress

Construction ongoing. All work (Fiber and

Electronics) performed by FAA Engineering Services.

Expecting completion by 4/1/19.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined JFK (1 of 3)—John F. Kennedy International Airport Q2 2019 Airport Construction Impact Report

IATA Level 3

Figure (page 15)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC B RWY 13L/31R & TWYs

Project Description of Work Estimated Dates Status Impact Notes

B RWY 13L/31R & TWYs

RWY 13L/31R and closed for reconstruction and widening to 200-ft. New high-speed Taxiway.

Crossing TWYs closed for rehabilitation and

upgrades for Group VI aircraft.

Rehabilitation and realignment of TWY U and TWY

intersection (U/V/B) for A380 operations.

Reconstruction of TWY YA for future realignment.

Drainage system upgrades.

Expecting RWY 13L/31R return November 16,

2019.

04/01/2019 to 11/16/2019 Upcoming

Available TWY/RWY crossings for RWY 22R

departures:

4/1/19-6/20/19 - TWYs E, V, B or C (up to group IV aircraft 11:00L to 23:00L).

6/21/19-6/30/19 - TWYs E, D and DB or Y.

7/1/19-7/14/19 - TWYs Y, E, D and DB. The RWY between TWY D and E - 11:00L to 23:00L or coordinated.

7/15/19-8/24/19 - TWYs Y, E, D, DB and W. RWY between TWY W and E - 11:00L to 23:00L or coordinated.

8/25/19-11/15/19 - TWYs Y, E, D, DB, W, and V or U or U/C.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined JFK (2 of 3)—John F. Kennedy International Airport Q2 2019 Airport Construction Impact Report

IATA Level 3

Figure (page 16)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC C RWY 13L/31R Lighting

Project Description of Work Estimated Dates Status Impact Notes

C RWY 13L/31R Lighting

Replace RWY 31R Visual Approach Slope Indicator

(VASI) lights with Precision Approach Indicator

(PAPI) lights. Replace RWY 31R Medium intensity

Approach Lighting System (MASLR) and 13L

Approach Lighting System (ALSF).

Additional lighting systems upgrade/replacement

and airfield signage.

09/09/2019 to 11/15/2019 Upcoming

No outage expected for this project, just cutover.

Planning includes scheduling during RWY 13L/31R

construction.

Replacement of Lead-in Lights (Lefferts)

supporting RWY 13L. 07/15/2019 to 09/13/2019 Upcoming

Design phase complete.

Outage and replacement planned during shutdown

of RWY 13L/31R.

Replacement of Lead-in Lights (Old Mill)

supporting RWY 13L and RWY 13R. 11/29/2019 to 12/24/2019 TBD Upcoming Outage being coordinated with N90. May be completed after RWY construction or in spring 2020.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined JFK (3 of 3)—John F. Kennedy International Airport Q2 2019 Airport Construction Impact Report

IATA Level 3

Figure (page 17)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A Terminal B

B TWYs M & Z

C Terminals C & D

Project Description of Work Estimated Dates Status Impact Notes

A Terminal B

Terminal B redevelopment of the Central Terminal

Building (CTB). Construction expected to include the demolition of the existing terminal and associated infrastructure.

Construction is for a new 35 gate terminal.

08/04/2015 to 11/07/2021 In Progress

The ZA ramp area is not available for use during phase 1. ZA is now decommissioned. New deicing areas have been relocated in front of the American hangars.

Terminal B; first 11 gates opened 12/2018. Gate 46

opened 3/219.

B TWYs M & Z

New construction of terminal C.

A portion of TWY M will be permanently closed in

Sep 2019, the remainder of TWY M will become a non-movement area and renamed Taxilane M.

07/24/2017 to 03/19/2022 In Progress In support of Terminal C redevelopment.

C Terminals C & D

Terminals C & D redevelopment. Construction

includes demolition of the existing terminals and reconstruction.

Construction is for a 37 gate terminal.

08/01/2017 to 01/12/2027 In Progress

Construction includes new main terminal. Terminal C

& D is approx. 38% of LGA passenger traffic (275 daily departures).

Concourse G is planned to open in late summer

2019.

Return to Table

of Contents

LGA (1 of 3)—LaGuardia Airport Q2 2019 Airport Construction Impact Report

Figure (page 18)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC D RWY 4/22

E Control Tower ASDE

Antenna

Project Description of Work Estimated Dates Status Impact Notes

D RWY 4/22

RWY 4/22 closed for rehabilitation. Mill and overlay of runway deck wearing course, and concrete panel replacement.

Resurfacing RWY 4/22 from the approach end of

RWY 4 to the RWY intersection. Includes all RWY

crossings and exits.

04/14/2019 to 09/15/2019 Upcoming

Multi-phased project. The majority will be

completed during weekend closures. The RWY closures required for this project will be scheduled during nighttime, and during scheduled weekend closures to minimize impacts. Associated TWY work will continue thru November 2020.

E Control Tower ASDE Antenna

Remove and replace ASDE antenna on top of

tower cab. A crane will be positioned at tower to lift the Antennas.

ASDE and RWSL out of service for 1-2 days.

April 2019 Upcoming

Expecting to schedule during one weekend to

minimize operational impacts.

ATC Specialists may need to evacuate tower cab

during lifts on the midnight shifts.

Return to Table

of Contents

LGA (2 of 3)—LaGuardia Airport Q2 2019 Airport Construction Impact Report

Figure (page 19)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC F RWY 22 LDA

G RWY 4/22 Deck

H TWY A Drainage

I TWY A

Project Description of Work Estimated Dates Status Impact Notes

F RWY 22 LDA RWY 22 localizer directional aid (LDA) upgrade and deck extension. New MK20A localizer. June 2019 to August 2019 Upcoming RWY 22 deck extension to support a more stable RWY 4 localizer signal. Expecting return to service:

first week in August 2019, after flight inspection.

G RWY 4/22 Deck Runway 4/22 deck rehabilitation. Jun 2019 TBD to Sep 2019 TBD Upcoming The resurfacing of Runway 4/22 will be completed using night and weekend closures to minimize the effect on capacity.

H TWY A Drainage Taxiway A closed for installation of new 72' drain line across TWY A to the Central Terminal Building

(CTB) concourse C.

September 2019 to November

2019 Upcoming

TWY A closed from TWY G to TWY H, TWY GG closed for same duration. No temporary "bypass" constructed to replace TWY A for any duration of this project.

I TWY A TWY A closed for rehabilitation. Resurfacing TWY A between TWY E and TWY K. 03/16/2020 to 09/30/2020 Upcoming Project expected to bid in Dec 2019 and construction in Spring/Summer 2020.

Return to Table

of Contents

LGA (3 of 3)—LaGuardia Airport Q2 2019 Airport Construction Impact Report

Figure (page 20)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A Airfield North Apron

B TWYs S, E, F, & P

C TWY K

Project Description of Work Estimated Dates Status Impact Notes

A Airfield North Apron Reconstruction and rehabilitation of the North

Apron and TWY D. 03/05/2019 to 11/15/2019 In Progress Phased (2) closure on TWY D.

B TWYs S, E, F, & P

Associated with RWY 27L extension. Includes

milling and paving, storm drainage, electrical conduit, centerline lights, elevated runway guard lights (ERGL), and signage.

Rehabilitation of TWYs S and E. Extension of TWY F to TWY S and extension of TWY P to TWY E. Fulldepth construction in between TWY S/F, and TWY

P/E.

03/05/2019 to 06/05/2019 In Progress Final phase of the RWY 9R/27L extension, package 3 of 3.

C TWY K Reconstruction of TWY K. Construction includes

demolition, paving, lighting, marking, and grading. 03/15/2020 to 08/31/2024 In Progress Potential for limited impact to adjacent TWYs.

Return to Table

of Contents

PHL—Philadelphia International Airport Q2 2019 Airport Construction Impact Report

Figure (page 21)

East-South Service Area, Impact Summary, Carrier Distribution Q2 2019 Airport Construction Impact Report Key:

American-AAL

Delta-DAL

Frontier-FFT

JetBlue-JBU

Other *less than

4%

Silver-SIL

Southwest-SWA

Spirit-NKS

United-UAL

2019 2020 2021

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ATL

CLT

FLL

MCO

MIA

TPA No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined Return to Table of Contents

Figure (page 22)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A South Cargo Expansion

B North Cargo Relocation &

Expansion

C RWY 9L End-Around TWY

Project Description of Work Estimated Dates Status Impact Notes

A South Cargo Expansion Air cargo facilities (Building E) will be moved to this area of the complex. 06/01/2017 to 2019 TBD In Progress Development of Cargo Building E and supporting ramp to provide for additional cargo facility capacity for all-cargo/freighter carriers.

B North Cargo Relocation &

Expansion Air cargo facilities (Buildings 2A & 2B) will be moved to this area of the complex. 04/01/2018 to 2020 TBD In Progress

Cargo Buildings 2A and 2B will be constructed in 3-4 phases. Construction will require relocation of FAA

West Remote Transmitter, ASOS, and Low Level

Wind Shear System (LLWAS) #7 sensor.

C RWY 9L End-Around TWY Construction of an EAT at RWY 9L to provide more efficient capacity and reduce delays. 04/01/2018 to 11/30/2022 In Progress Multi-phase project. Phase 1 will coincide with runway rehabilitation/reconstruction.

Return to Table

of Contents ATL (1 of 3)—Hartsfield-Jackson Atlanta International Airport Q2 2019 Airport Construction Impact Report

Figure (page 23)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC D RWY 9L/27R and Adjacent

TWYs

E TWY L

Project Description of Work Estimated Dates Status Impact Notes

D RWY 9L/27R and Adjacent

TWYs

Phase 3 Construction, TWY closures for pavement rehabilitation and runway safety area (RSA) improvements.

RWY 9L PAPI OTS, 9L/27R Localizer and Glide Slope

OTS, 9R Glide Slope OTS, Taxiway closure: TWY P

and TWY N between P and N2. Approach end 9L.

09/24/2018 to 10/20/2019 In Progress

During this project, a 3-week, full runway closure

along with temporary threshold displacement and

Navigational Aid (NAVAID) outages will be necessary.

This project will enable RWY 9L End-Around-TWY

(EAT).

E TWY L Replace TWY L between ramp 5 (South) and ramp 6 (South). 08/01/2019 to 08/30/2019 Upcoming Will utilize alternate taxi routes during construction.

Return to Table

of Contents ATL (2 of 3)—Hartsfield-Jackson Atlanta International Airport Q2 2019 Airport Construction Impact Report

Figure (page 24)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC F Hot Spot 1 & Hot Spot 2

G Concourse T

H Taxiway V

Project Description of Work Estimated Dates Status Impact Notes

F Hot Spot 1 & Hot Spot 2 RWY Incursion Mitigation Program: RWY 8L/26R,

HS1, TWY C, D, B intersections; RWY 8R/26L, HS2,

TWY C, D intersections. 2020 TBD Upcoming

RWY Incursion Mitigation Program (RIM) of HS1 and

HS2. Both are located on the north airfield and require shifting of portions of TWYs C and D that intersect RWYs 8L/26R and 8R/26L at midfield.

Phased project planned to minimize costs and

airfield impacts.

G Concourse T

North extension; to modify terminal parking and

apron areas and construct 6 new gates to accommodate up to Aircraft Design Group (ADG)

III.

09/01/2020 to Winter 2023 Upcoming Concourse T will be extended. Construction will add

6 new gates.

H Taxiway V TWY V realignment and redesign, for TWYs E, F, H, E1 and F2. 09/01/2020 to 10/31/2020 Upcoming Preliminary work to support the construction of, and use of Concourse T expansion. 4 Phases to minimize the impact to operations.

Return to Table

of Contents ATL (3 of 3)—Hartsfield-Jackson Atlanta International Airport Q2 2019 Airport Construction Impact Report

Figure (page 25)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A Control Tower

B TWY E11

C TWY M

Project Description of Work Estimated Dates Status Impact Notes A Control Tower New FAA Control Tower. 06/02/2017 to 2020 TBD In Progress Tower should be commissioned and operational in early-2020.

B TWY E11 Permanent Demolition of TWY E11. January 2019 to February 2019 Complete Removal of the old Taxiway E11.

C TWY M

TWY M from the ramp up to TWY C closed for concrete rehabilitation 03/06/2019 to 03/29/2019 Complete Alternate taxi routes have been established. RWY 5/23 will be used as a taxiway only during this project.

TWY M and F closed north of runway 5/23 for rehabilitation. 04/01/2019 to 08/03/2019 Upcoming During project, RWY 5/23 will be closed to arriving and departing aircraft. It will be used for taxiing aircraft.

Return to Table

of Contents CLT (1 of 2)—Charlotte/Douglas International Airport Q2 2019 Airport Construction Impact Report

Figure (page 26)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC D RWY 18C/36C

E RWY18L/36R

F TWY C7

G New 4th Parallel RWY

Project Description of Work Estimated Dates Status Impact Notes D RWY 18C/36C RWY 18C/36C closed for joint seal replacement. 03/11/2019 to 04/26/2019 In Progress This project expecting during overnight hours, between 2315-0600L daily.

E RWY18L/36R RWY 18L/36R closed for rehabilitation. 09/01/2019 to 12/20/2019 Upcoming This project takes place over night between 2315L-0715L daily.

F TWY C7 Permanent Demolition of TWY C7. 09/01/2019 to 12/20/2019 Upcoming No operational notes. G New 4th Parallel RWY Build new runway to add capacity, 12,000 ft. x 200 ft., plus end-around TWYs. Summer 2020 to Fall 2022 Upcoming

Multi-phased project. Design phase 2018. Possible service interruptions due to infrastructure system tie-ins. Possible arrival/departure impacts due to equipment, and construction cranes.

Return to Table

of Contents CLT (2 of 2)—Charlotte/Douglas International Airport Q2 2019 Airport Construction Impact Report

Figure (page 27)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A RWY 10L/28R and TWYs

B Airfield TWYs (center)

Project Description of Work Estimated Dates Status Impact Notes

A RWY 10L/28R and TWYs

Phase 2 (88 days) - TWY A rehabilitation. 03/25/2019 to 06/02/2019 In Progress

Construction in the Northwest cargo ramp area.

There will be impact to aircraft taxiing in this area.

Additional runway crossings will be needed so

departing traffic can access full length.

Phase 3 (120 days) – RWY/EMAS rehabilitation.

RWY resurface/EMAS update. 06/03/2019 to 10/03/2019 Upcoming

Single runway operation, expect reduced capacity

and delays.

Expecting 28 AAR, available during both East/West

operations, and changes for weather or other constraints. Arriving aircraft 16-23 min. delay during peak operations. Surface modeling complete;

additional 2 ½ min. taxi-in, 7 min. taxi-out during

VMC.

Phase 4 (159 days) - TWY B rehabilitation, 10/1/19

to 3/8/20.

TWY rehabilitation, includes milling and paving.

New surface markings and signage.

10/01/2019 to 03/08/2020 Upcoming Runway open.

Expected end of construction: Sat 3/7/20.

B Airfield TWYs (center) Surface area closed for rehabilitation and maintenance. Area closed for 4 days, during nights and mornings 9:00PM to 10:00AM local. Spring 2019 TBD Upcoming

Return to Table of Contents FLL (1 of 2)—Fort Lauderdale/Hollywood International Airport Q2 2019 Airport Construction Impact Report

Figure (page 28)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC C RWY 10R/28L

Project Description of Work Estimated Dates Status Impact Notes

C RWY 10R/28L

RWY 10R/28L and associated TWYs closed for

Rehabilitation. Milling and paving RWY 10R/28L,

TWYs J and H, and parts of TWYs L and Q.

Construction will consist of concrete and joint

repairs, concrete crack and surface sealing, bridge structure expansion joint replacement, and pavement markings.

03/25/2019 to 04/22/2019 In Progress

Phase 1: closed daily from 2200L to 0600L. Duration:

4 weeks. System Impact Report (SIR) complete.

Runway 10R-28L will be cleared and available in 30

minutes for emergency incidents.

RWY 10R/28L and TWY J closed for RWY, TWY, and bridge structure repairs. Includes total expansion joint replacements, concrete panels, and bridge header repairs.

RWY 28L: two joint replacements 775' and 790'

four header replacements 175', 255', 255', and

135'

TWY J: two joint replacements 365' and 430' three header replacements 15', 105', and 25'

05/21/2019 to 05/23/2019 TBD Upcoming

Notification by local authorities advised the RWY needs emergency repairs . The construction will occur in the aircraft takeoff and landing zones for

RWY 28L.

RWY is not recallable due to concrete panel

replacement, minimum 2-day cure time for concrete type being used.

In the event of a weather delay, the work will be conducted the following week, 5/28/19 to 5/30/19.

Return to Table

of Contents FLL (2 of 2)—Fort Lauderdale/Hollywood International Airport Q2 2019 Airport Construction Impact Report

Figure (page 29)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A South Terminal Complex

B RWY 17R/35L & TWYs

Project Description of Work Estimated Dates Status Impact Notes

A South Terminal Complex Construction of a new South Terminal Complex and associated apron/taxiway. Limited

RWY/TWY closures. 11/14/2017 to 2020 TBD In Progress

Expecting some system impacts when taxiway closures are required. Work on the parking garage and intermodal train station have begun.

Construction cranes may affect some arrival

minimums. Construction date for beginning the south terminal for aircraft operations is still TBD.

B RWY 17R/35L & TWYs

Rehabilitate pavement for the RWY and entrance

and exit TWYs. Improvements to RWY geometry, markings, lighting, and signage.

Phase 1 Taxiway (South) - 2/8/19 to 3/10/19

Phase 2 Runway - 3/10/19 to 8/7/19 (150 days)

Phase 2A/2E Taxiway (Middle & North) - 3/10/19

to 8/7/19

02/08/2019 to 08/07/2019 In Progress

There may be some delay impacts due to present traffic volumes and continued growth at MCO.

Coordination with TMU and users will be started

prior to the start date to help mitigate any issues.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined MCO (1 of 2)—Orlando International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 30)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC C RWY 18L/36R

D East-side Taxiways

Project Description of Work Estimated Dates Status Impact Notes

C RWY 18L/36R

Rehabilitate pavement, includes mill and overlay, joint sealing and other repairs. Improvements for pavement geometry, runway shoulder pavement widening, blast pad enhancements, markings, lighting, and signage.

01/01/2020 to 2020 TBD Upcoming

Some delay impacts expected. Loss of ILS RWY 36R

could result in some delays during weather and require TMU initiatives. Advance coordination will be in place between TMU and users to help mitigate any issues. Funding has not yet been determined.

Additional TWY closures expected at various phases.

D East-side Taxiways Rehabilitate pavement, lighting, painting and signage on all taxiways between RWYs 17L and

17R. 2021 TBD to 2022 TBD Upcoming Still in the design phase. If long term taxiway closures are encountered capacity could be reduced due to the fact we could not access RWY 17L/35R.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined MCO (2 of 2)—Orlando International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 31)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A TWYs S & T

B RWY 9/27 Lighting

C Central Base Ramp

D RWY 12/30 & TWY R

Project Description of Work Estimated Dates Status Impact Notes

A TWYs S & T

Rehabilitation: mill and overlay, lighting upgrades, and pavement markings.

TWY S from TWY T3 and TWY S1 closed.

02/12/2018 to 03/25/2019 Complete TWYs will be closed in segments to minimize potential impacts.

Rehabilitation: mill and overlay, lighting upgrades, and pavement markings.

TWY S from Western U ramp and approach end of

RWY 09 closed.

03/22/2019 to 04/29/2019 In Progress TWYs will be closed in segments to minimize potential impacts.

B RWY 9/27 Lighting Work needs to be completed on a number of runway light fixtures. 04/01/2019 to 04/11/2019 Upcoming

Runway 9/27 is scheduled to be closed 4/1/19 –

4/4/19 from 0100Z – 1400Z then the same time frame again the following week plus an additional day if needed the week of 4/15/19 TBD.

C Central Base Ramp Central Base (East side) ramp expansion and taxiway tie-in. 04/15/2019 to 11/01/2021 Upcoming Project will impact operations during taxiway tie-in work at the N-13 intersection.

D RWY 12/30 & TWY R

Relocation and westward extension of TWY R, upgrading utilities and lighting.

RWY 12/30 full closure.

06/14/2019 to 07/12/2021 Upcoming

Expecting increased taxi times due to closures.

Multi-phased plan will have taxiway closed in

segments to minimize impacts. Expecting major construction work during mid-shift hours.

Return to Table

of Contents

MIA—Miami International Airport Q2 2019 Airport Construction Impact Report

Figure (page 32)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A TWY N Reconstruction

B RWY 19L/1R AND RWY

10/28 and TWYs

C TWY U

Project Description of Work Estimated Dates Status Impact Notes

A TWY N Reconstruction TWY N closed from TWY E and approach end RWY 28. Reconstructing asphalt sections. 03/11/2018 to 04/15/2019 In Progress Reconstruction project will require intermittent closures of RWY 10/28.

B RWY 19L/1R AND RWY 10/28

and TWYs

Renaming of feeder taxiways associated with RWY

19L/1R and RWY 10/28. This will require intermittent daily closures to replace signage. 01/07/2019 to 04/15/2019 In Progress Possible airborne holding, expanded miles-in-trail, ground stop, or ground delay program.

C TWY U TWY U closed between RWY 01R/19L and TWY E. 02/07/2019 to 04/30/2019 In Progress TWY U will be closed permanently until such a time it can be reconstructed to meet new FAA runway configuration standards.

Return to Table

of Contents

TPA (1 of 2)—Tampa International Airport Q2 2019 Airport Construction Impact Report

Figure (page 33)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC D TWY S Reconstruction

Not

Depicted Airfield Runway Threshold

Lighting

E RWY 1R/19L Lights

Project Description of Work Estimated Dates Status Impact Notes

D TWY S Reconstruction

TWY S closed for reconstruction from TWY R2 to approach end RWY 28.

Reconstructing asphalt sections.

03/11/2019 to 04/15/2019 In Progress Reconstruction project will require intermittent closures of RWY 10/28.

Not

Depicted Airfield Runway Threshold

Lighting Runway threshold lighting on all runways will be

upgraded to meet nee FAA standards 10/01/2019 to 03/01/2020 Upcoming

This will require single day closures of each runway to complete this work. Possible airborne holding, expanded miles-in-trail, ground stop, or ground delay program.

E RWY 1R/19L Lights Runway guard lights will be installed at intersections of taxiways with RWY 01R/19L. 10/01/2019 to 03/01/2020 Upcoming This will require closures on taxiway C and may impact aircraft entering and exiting RWY 01R/19L.

Return to Table

of Contents

TPA (2 of 2)—Tampa International Airport Q2 2019 Airport Construction Impact Report

Figure (page 34)

Central Service Area, Impact Summary, Carrier Distribution Q2 2019 Airport Construction Impact Report Key:

American-AAL

Delta-DAL

Federal Express-

FDX

Other *less than

4%

Southwest-SWA

Spirit-NKS

Sun Country-SCX

United-UAL

2019 2020 2021 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC DFW

DTW

IAH

MDW

MEM

MSP

ORD No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined Return to Table of Contents

Figure (page 35)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A RWYs 17C-17R

End-Around TWY

North Section

B TWY Y

Project Description of Work Estimated Dates Status Impact Notes

A RWYs 17C-17R

End-Around TWY

North Section

Northeast End-Around Taxiway (NEAT).

Phase 1 & 2B-2D, and 2E: TWY P realignment will need non-simultaneous closures of TWYS Y/N and

Z/P.

Phase 3: Glycol facilities relocation near the

approach end of RWY 17R.

05/24/2018 to 04/30/2020 In Progress

Project supports taxiway tie-ins for NEAT.

Project supports relocation of deicing fluid.

B TWY Y

TWY Y closed between taxiways HY and JY for

bridge reinforcement.

Nightly: 2300L-0600L

06/25/2018 to 05/15/2019 In Progress

TWY Y closure is not concurrent with any other

east/west airfield connector TWY. Some aircraft that normally use the north bridge taxiways will be rerouted to use the south bridges (A&B) which will increase taxi times and congestion. Taxi in/out times will increase during this long term closure. MIT or metering for arrivals. Departure delays of 15-29 minutes possible.

Return to Table

of Contents DFW (1 of 2)—Dallas/Fort Worth International Airport Q2 2019 Airport Construction Impact Report

Figure (page 36)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC C RWY 17C/35C & TWYs

D TWY F

Project Description of Work Estimated Dates Status Impact Notes

C RWY 17C/35C & TWYs

RWY 17C/35C and associated TWYs closed nightly for final rehabilitation activities (11pm-6am).

TWY P2 closed between RWY 17C and TWY P.

TWY EL closed between RWY 17C and TWY Q.

TWY P closed between TWY EJ and maintenance

hangar.

03/10/2019 to 04/19/2019 In Progress Multi-phased project.

D TWY F TWY F closure. Replace and expand asphalt shoulders, replace concrete panels, expand pavement at key intersections. Spring 2020 TBD Upcoming Project delayed until further notice.

Return to Table

of Contents DFW (2 of 2)—Dallas/Fort Worth International Airport Q2 2019 Airport Construction Impact Report

Figure (page 37)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A North Terminal Expansion

B RWY 3L/21R and TWY M

Project Description of Work Estimated Dates Status Impact Notes

A North Terminal Expansion North Terminal gate expansion (3 gates), Apron rehabilitation, and return overnight (RON) parking. 07/01/2018 to 11/15/2019 TBD In Progress Project is in non-movement area. Minimal impact to aircraft ground movement is expected.

B RWY 3L/21R and TWY M RWY 3L/21R and parallel TWY M closed for rehabilitation. 04/01/2019 to 11/15/2019 Upcoming Runway 3L/21R is a primary departure runway.

During peak arrival demand possible departure

delays due to single runway departure operation.

Return to Table

of Contents DTW (1 of 2)—Detroit Metropolitan Wayne County Airport Q2 2019 Airport Construction Impact Report

Figure (page 38)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC C RWY 9L/27R

D TWY P & PP

E TWY Z

Project Description of Work Estimated Dates Status Impact Notes

C RWY 9L/27R RWY 9L/27R closed for rehabilitation of intersection with RWY 3L/21R. 07/01/2019 to 09/14/2019 Upcoming

Runway 9L-27R is primary departure runway during crosswind conditions (<3% of the time).

Phasing has been scheduled outside of the

crosswind season to minimize potential for use.

D TWY P & PP TWYs will be closed for Taxiway PP and P rehabilitation. Taxiway P extension construction. 04/01/2020 to 09/16/2020 Upcoming Multi-phased project to allow for crossings to be maintained and facilitate ground movement of aircraft from Runway 3R-21L and tenant locations.

E TWY Z TWY Z relocation between TWY V and TWY Z5. 04/01/2021 to 11/15/2021 Upcoming

Return to Table of Contents DTW (2 of 2)—Detroit Metropolitan Wayne County Airport Q2 2019 Airport Construction Impact Report

Figure (page 39)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A TWY RA, SA, SB

B RWY 15L/33R

C Airport Sanitary Sewer

Mains

D RWY 8R/26L

Project Description of Work Estimated Dates Status Impact Notes A TWY RA, SA, SB TWYs RA, SA, and SB (South Area) reconstruction. 03/01/2018 to 2019 TBD In Progress UAL Ramp control may incur internal delays getting to transfer of control point (CP).

B RWY 15L/33R RWY 15L/33R closed to tie in adjacent taxiways and related construction projects.

Runway closed continuous and not recallable. 01/13/2019 to 04/02/2019 In Progress

12,000 ft. departure RWY is not available during this period to heavy cargo and foreign carriers. Possible airborne delays 15-45 minutes, due to airport capacity.

C Airport Sanitary Sewer Mains Rehabilitation of sewer line from Terminal A Southbound, then West of TWY WC. Spring 2019 TBD to Fall 2019 TBD Upcoming Project delayed, estimated project duration 419 days.

D RWY 8R/26L RWY 8R/26L closed for resurfacing, and electrical upgrades. Spring 2019 TBD Upcoming Expected start date: Q2-2019.

Return to Table

of Contents

IAH—George Bush Intercontinental/Houston Airport Q2 2019 Airport Construction Impact Report

Figure (page 40)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A Terminal Parking Garage

B Airfield Lighting

C RWY 4R/22L EMAS

D ATCT

Project Description of Work Estimated Dates Status Impact Notes

A Terminal Parking Garage Expansion of the existing terminal parking structure. 01/01/2018 to 03/25/2020 TBD In Progress This project should be minimal impact, During occasional weather periods the RNAV 22L approach may have increased minimums.

B Airfield Lighting Airfield lighting improvements. Construction of electrical duct banks and manhole system near the approach end of RWY 22L. 04/01/2018 to 11/30/2019 In Progress Primarily nighttime work near the approach end of RWY 22L that may require associated TWY closures.

C RWY 4R/22L EMAS Repair/replace Engineered Material Arresting

System (EMAS) at Southwest end of RWY 4R/22L. Fall 2018 to 04/30/2019 In Progress Project will require runway closure but will be based on availability of alternate runways.

D ATCT Replacement/upgrade of ATCT emergency battery

power supply (UPS). 08/01/2019 to 08/31/2019 Upcoming ORM meetings in progress, plans for temporary tower during weekend overnight power loss.

Return to Table

of Contents

MDW—Chicago Midway International Airport Q2 2019 Airport Construction Impact Report

Figure (page 41)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A TWYs N & J deicing pad

B TWY A

C RWY 9/27 Status Lights

Project Description of Work Estimated Dates Status Impact Notes

A TWYs N & J deicing pad TWYs N & J, deicing (glycol collection) pad between RWY 36L and 36C. 09/01/2017 to 2020 TBD In Progress

Area affects approaches during CAT 2/3 conditions.

Airport will lower crane(s) when anticipating CAT 2/3

conditions to mitigate impact. However, some CAT

2/3 conditions may still add impact.

B TWY A

TWY A (West) full-depth reconstruction of approx.

4,125 ft. Includes demolition, grading, drainage, airfield signage, markings, and electrical lighting.

Duration 4 months

Spring 2019 Upcoming

Preconstruction meeting with airport authorities and

discussion included construction dates and potential impacts.

Construction will be done in sections. Impact level

will be changed if there is any effect on capacity or delays.

C RWY 9/27 Status Lights RWY 9/27 runway status lights (RWSL) system will be installed. 2020 TBD Upcoming Construction dates are TBD.

Impact level will be changed if there is any effect on capacity or delays.

Return to Table

of Contents

MEM—Memphis International Airport Q2 2019 Airport Construction Impact Report

Figure (page 42)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A Parking Ramp Construction

B RWY 4/22 Grading

Project Description of Work Estimated Dates Status Impact Notes

A Parking Ramp Construction

Large cranes (4) will be erected to support

Terminal 1 parking ramp construction.

RWYs 12R and 12L have Cat II available to RWY threshold. Beyond RWY threshold, the localizer is unusable.

03/02/2018 to 08/31/2019 In Progress

Cranes impact the localizers on RWYs 12R, 12L, and

30L. This will reduce RWY 30L to a Cat I ILS only.

There are no Cat III approaches available to RWY 12L or 12R. Will not reduce the arrival rate, but will impact what aircraft/airlines are able to conduct an approach. TMIs will be utilized during active weather conditions.

B RWY 4/22 Grading RWY 4/22 Safety Area grading. June 2019 to September 2019 Upcoming

Return to Table of Contents MSP (1 of 2)—Minneapolis-St. Paul International/Wold-Chamberlain Airport Q2 2019 Airport Construction Impact Report

Figure (page 43)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC C TWY C1

D RWY 4/22 as TWY

E TWY D

Project Description of Work Estimated Dates Status Impact Notes

C TWY C1 Construction of new TWY C1.

Phase 1 - 7/15/19-8/30/19

Phase 2 - 9/02/19-10/18/19 07/15/2019 to 10/18/2019 Upcoming

Limited taxi restrictions on ADG V & IV aircraft.

Alternate taxi routes will be available.

D RWY 4/22 as TWY Install RWY 4/22 guard and TWY edge lights. Summer 2019 to Fall 2019 Upcoming These lights will be turned on when RWY 4/22 is used as a taxiway.

E TWY D TWY D closed for reconstruction. May 2020 to September 2020 Upcoming Multi-phased project. Limited taxi restrictions on ADG III and IV aircraft.

Return to Table

of Contents MSP (2 of 2)—Minneapolis-St. Paul International/Wold-Chamberlain Airport Q2 2019 Airport Construction Impact Report

Figure (page 44)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A Western toll-way bypass

B VOR Decommissioning

C North ASDE

D West Field Deicing Pad

Project Description of Work Estimated Dates Status Impact Notes

A Western toll-way bypass Toll-way construction along the western airport boundary from intersection of Business Road and S.R.83 westbound to Interstate 355. 03/01/2017 to 12/31/2021 In Progress During construction, Construction cranes will impact approach minimums by increasing decision height

(DH). NOTAMS in effect.

B VOR Decommissioning Current VOR/DME will be replaced with a standalone DME. 03/01/2017 to 01/03/2019 Complete Standalone DME operational 1/3/2019.

C North ASDE Construction of a new North ASDE SMR (airport surface detection radar antenna) site. 06/18/2018 to 03/29/2019 Complete D West Field Deicing Pad Construction of a new deicing pad. Summer 2018 to 02/01/2019 TBD Complete South taxiway access complete.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined ORD (1 of 4)—Chicago-O'Hare International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 45)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC E RWY 9C/27C

F RWY 9R/27L RWSL

Project Description of Work Estimated Dates Status Impact Notes

E RWY 9C/27C New center runway construction (11,245 ft. long x

200 ft. wide). 05/01/2017 to 11/05/2020 TBD In Progress

Dates fluctuate due to construction complexities.

The scheduled commissioning date is 11/5/2020.

RWY 9R ILS currently in-service for Cat I approaches, further outage requests likely. Impact level may change during project due to weather changes.

Delays during IMC conditions are expected which is

approx. 4% of the year. If weather is below 500-1/2

(LOCALIZER minimums); GDPs, MIT, airborne holding, and arrival delays of up to 60 minutes possible. The loss of 9R/27L glideslope during IMC conditions lowers airport to a 76 AAR.

F RWY 9R/27L RWSL RW 9R/27L install Runway Status Lights (RWSL). 02/01/2019 to 06/18/2019 In Progress Nighttime closures only.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined ORD (2 of 4)—Chicago-O'Hare International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 46)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC G RWY 9R/27L

H RWY 4L/22R

Project Description of Work Estimated Dates Status Impact Notes

G RWY 9R/27L

Runway 9R will be extended approximately 3,000 feet to the west.

Runway 27L will be shortened approximately 300

feet to the west.

03/01/2019 to 12/02/2021 In Progress

Multi-phased construction during 3 seasons

1. 2019 West construction

2. 2020 Central construction

3. 2021 Runway 9R/27L closed until reopening after

commissioning

H RWY 4L/22R

RWY 4L/22R closed for full length rehabilitation, lighting upgrades and surface markings.

RWY 22R localizer antenna will be relocated and

glideslope antennas replaced/upgraded.

03/15/2019 to 10/31/2019 In Progress RWY 4L-22R will be closed continuously until the end of the project. Strong SSW winds prohibiting a West

Flow will cause a delay impact.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined ORD (3 of 4)—Chicago-O'Hare International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 47)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC I Relocation of the west

ASR-9

J New Terminal Areas Plan

(TAP)

Project Description of Work Estimated Dates Status Impact Notes

I Relocation of the west ASR-9 The ASR will be relocated to the south airfield to support new RWY 9C-27C. 05/01/2019 to 07/01/2019 In Progress South ASR-9 will be in service May 1, 2019 and the west ASR-9 (or mid-airfield) demolition June 1, 2019.

J New Terminal Areas Plan

(TAP)

TAP Phase I Elements – 10 Year Plan

Construction of Satellite 1 Concourse, Satellite 2

Concourse, and Terminal 2 redevelopment. 11/02/2020 to 11/01/2028 Upcoming

Numerous taxiway closures while temporary taxi routes are being constructed. New temporary taxi routes will increase taxi in/out times during construction.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined ORD (4 of 4)—Chicago-O'Hare International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 48)

Western Service Area, Impact Summary, Carrier Distribution Q2 2019 Airport Construction Impact Report Key:

Alaska-ASA

Allegiant-AAY

American-AAL

Delta-DAL

Frontier-FFT

Hawaiian-HAL

Mokulele-MHO

Other *less than

4%

Southwest-SWA

Spirit-NKS

Transair-KDS

United-UAL

2019 2020 2021

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC DEN

HNL

LAS

LAX

PHX

SAN

SEA

SFO

SLC No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined Return to Table of Contents

Figure (page 49)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A Terminals A, B, & C

B RWY 17R/35L

Project Description of Work Estimated Dates Status Impact Notes

A Terminals A, B, & C

Terminals A, B, and C expansion and redevelopment: Concourse A - 12 new gates

Concourse B - 11 new gates

Concourse C - 16 new gates

05/29/2018 to Spring 2021 In Progress Expecting increased taxi times.

Airport gate capacity increase of 30%.

B RWY 17R/35L RWY 17R/35L closed for pavement rehabilitation

and lighting upgrades. 06/03/2019 to 09/13/2019 Upcoming Miles in trail, Time Based Flow Management, fix balancing, ground stop, GDP, and AAR adjustments will be used to accommodate traffic demand.

Return to Table

of Contents

DEN—Denver International Airport Q2 2019 Airport Construction Impact Report

Figure (page 50)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A RWY 8L/26R

Project Description of Work Estimated Dates Status Impact Notes

A RWY 8L/26R

RWY 8L/26R widening project from 150 to 200 feet.

RWY 26R shortened 3200' for east-end work,

9,100ft remaining.

Phase 1 (stages 1-2) completion by Sep. 2019

Stage 1 (east) = 79 days

Stage 2 (center) = 193 days, full closure

03/19/2019 to September 2019 In Progress

9 Stage project. West and center stages RWY 8L

requires full closures resulting in lower AARs. TMIs will be in place for arrivals during peak periods

(0900-1500 HST), miles in trail (MIT), and/or call for release may be implemented.

Expecting arrival/departure delays 15 minutes.

Expect delays for RWY 8R. Possible delays RWY

22/26 for RWY 22L departures due to RWY 26L

arrivals. Increased taxi times for aircraft requesting

RWY 26L departure.

Phase 2 (stages 3-9) of 8L/26R should start January

2020 and should be completed by 2021. Design is

being finalized.

Stages 3-9 = full closures

January 2020 to 2021 TBD Upcoming Expect TMIs for arrivals during peak periods.

Expect airborne and departure delays.

Return to Table

of Contents HNL (1 of 2)—Daniel K. Inouye International Airport Q2 2019 Airport Construction Impact Report

Figure (page 51)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC B RWY 4L/22R & 4R/22L

C TWY A

Project Description of Work Estimated Dates Status Impact Notes

B RWY 4L/22R & 4R/22L Install runway Guard Lights for Runway Incursion

Mitigation program (RIM). Summer 2019 to Winter 2020 Upcoming

C TWY A

TWY A realignment.

Estimated start construction near end of year

2021.

2021 TBD to Fall 2021 TBD Upcoming Taxiway reconfigurations based on HNL geometry study completed May 2018.

Return to Table

of Contents HNL (2 of 2)—Daniel K. Inouye International Airport Q2 2019 Airport Construction Impact Report

Figure (page 52)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A TWY C Extension

Project Description of Work Estimated Dates Status Impact Notes

A TWY C Extension Extension of TWY C between TWYs D and G. Area approximately 2,600 ft. x 75 ft. 11/26/2018 to 06/17/2019 In Progress

Equipment potentially impacted by the extension are VOR (operational limitations), TACAN/DME, receivers, Surface Weather System (SWS), and fiber optic and power cable runs.

Some delays are expected based upon airport

configuration. Officials have agreed to several work moratoriums during some of the high volume Las

Vegas events.

Return to Table

of Contents

LAS—McCarran International Airport Q2 2019 Airport Construction Impact Report

Figure (page 53)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A Midfield Satellite

Concourse (MSC)

B TWY S

C TWY D (Center)

Project Description of Work Estimated Dates Status Impact Notes

A Midfield Satellite Concourse (MSC) Opening of new Terminal Gates and new TWY M. 08/01/2016 to 06/01/2020 In Progress LAWA will assume control of TWYs S and T when TWY C14 (TWY P) has been completed.

B TWY S TWY S closed for construction, between TWY T1 and TWY T2. 06/06/2018 to 01/16/2020 TBD In Progress

C TWY D (Center) TWY D closed for construction, between TWY R and T. 09/17/2018 to May 2019 TBD In Progress

Limited impact for taxiing aircraft.

Increased surface congestion during periods of peak

demand.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined LAX (1 of 3)—Los Angeles International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 54)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Not

Depicted Taxiway Re-Designation

Project

D TWY C14

E RWY 7R/25L,TWY H

Project Description of Work Estimated Dates Status Impact Notes

Not

Depicted Taxiway Re-Designation

Project Airfield wide project to re-designate LAX TWYs.

There is 12 phases. 02/28/2019 to 2022 TBD In Progress Re-designation of South airfield TWY names will enable the new planned North airfield TWYs to utilized single letter designations.

D TWY C14 New TWY C14 between TWY E and TWY C and parallel to TWY R.

TWY C14 is planned to be renamed TWY P.

01/01/2020 TBD to 12/01/2020

TBD Upcoming New taxiway construction. Capacity will be reduced

with limited impact.

E RWY 7R/25L,TWY H Runway and taxiway closure for reconstruction. 01/15/2021 to 05/31/2021 Upcoming Runway closure will occur in two phases.

Runway closure will occur during Super Bowl in Los

Angeles on 2/7/2021.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined LAX (2 of 3)—Los Angeles International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 55)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC F TWY D Extension

G RWY 6L/24R

H RWY 6R/24L

Project Description of Work Estimated Dates Status Impact Notes

F TWY D Extension

TWY D, closed area for surface construction from

TWY C14 (TWY P) to TWY AA.

TWY AA closure to tie-in the New TWY D.

Winter 2021 TBD to Winter 2022

TBD Upcoming

New taxiway construction.

Capacity will be reduced with limited impact.

Expected start date: Q1-2021.

G RWY 6L/24R New Exit TWYs 2022 TBD Upcoming Reduced CAT II/II Capability.

H RWY 6R/24L New Exit TWYs and tie-into TWY E. 2022 TBD Upcoming Reduced Taxi routes for RWY 24L departures w/ADG-VI impacts.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined LAX (3 of 3)—Los Angeles International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 56)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A RWY 7R/25L

Project Description of Work Estimated Dates Status Impact Notes A RWY 7R/25L RWY 7R/25L closed for repairs and maintenance. Spring 2019 TBD Upcoming Weekend maintenance for RWY7R/25L. Minor impact to the operation.

Return to Table

of Contents

PHX—Phoenix Sky Harbor International Airport Q2 2019 Airport Construction Impact Report

Figure (page 57)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A New Cargo Facility

B RWY 9/27 & TWYs

C Terminal Replacement

Not

Depicted Electrical Vault Relocation

Project Description of Work Estimated Dates Status Impact Notes

A New Cargo Facility Planned cargo facility at current transient aircraft parking location. 01/01/2018 to 04/30/2019 In Progress Weather sensors require relocation, weather systems will provide seamless relocation with no WX data/TAF degradation.

B RWY 9/27 & TWYs

RWY 9/27 closed nightly to support TWYs B4, B5,

B6, B7, C3, C4 and C6 rehabilitation project.

Nightly RWY complex closed: Mon-Sat 0700Z-

1200Z (5 hrs.)

10/10/2018 to 05/31/2019 In Progress After PST on 11/5/18, closed 0800Z-1300Z (5 hrs.)

C Terminal Replacement Airport will replace passenger terminals. 01/01/2019 to 01/01/2021 In Progress Aircraft gates added sequentially before legacy gates demolished.

Not

Depicted Electrical Vault Relocation Electrical vault moved approximately 150 feet SE to allow for TWY expansion. 08/01/2020 to 05/01/2021 Upcoming

Phased to avoid reduction in services/capabilities.

Airport will also relocate security fence to keep

equipment shelters in the Air Operations Area

(AOA).

Return to Table

of Contents

SAN—San Diego International Airport Q2 2019 Airport Construction Impact Report

Figure (page 58)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Project Description of Work Estimated Dates Status Impact Notes

No projects at this time

Return to Table of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined SEA—Seattle-Tacoma International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 59)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A TWYs E & J

B TWY C (East Area)

C TWYs N & P

D RWY 28L Intersections

Project Description of Work Estimated Dates Status Impact Notes A TWYs E & J TWYs E and J reconstruction. Q2 2019 TBD to Q4 2019 TBD Upcoming Future project, exact dates unknown. B TWY C (East Area) TWY C reconstruction on the East-side of the airfield. Q2 2019 TBD to Q4 2019 TBD Upcoming Future project, exact dates unknown.

C TWYs N & P TWYs N and P reconstruction. Q2 2019 TBD to Q4 2019 TBD Upcoming Future project, exact dates unknown. D RWY 28L Intersections Rebuild RWY intersections at RWY 1L and RWY 1R.

Reconstruction of foundations for the RWY

intersections. 09/07/2019 to 09/27/2019 Upcoming Finalizing Schedule.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined SFO (1 of 3)—San Francisco International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 60)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC E RWY 1L/19R

Not

Depicted Airfield Lighting

Project Description of Work Estimated Dates Status Impact Notes

E RWY 1L/19R RWY 1L/19R closed for rehabilitation. Fall 2019 Upcoming Repaving RWY.

Not

Depicted Airfield Lighting

Airfield Lighting, Bldg. 1 electrical system upgrade 11/01/2019 to 2020 Upcoming

Future project, exact dates unknown.

Airfield lighting, 5kV cable replacement Fall 2019 to Winter 2020 Upcoming

Return to Table of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined SFO (2 of 3)—San Francisco International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 61)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC F TWYs D & T

G TWYs F and F1

Project Description of Work Estimated Dates Status Impact Notes

F TWYs D & T

Realignment of TWYs D and T for Runway

Incursion Mitigation (RIM) Program.

Phase A - nighttime 28L Closures - weeks

Phase B - weekend runway 28R closure

Phase C - full week runway 28L closure

Phase D - nighttime 28L closures - 3 weeks

Phase E - nighttime 28L closures - 3 weeks

Spring 2020 Upcoming

Multi-phased project to realign TWYs in order to

rectify deficiencies with the existing geometry. It will enable aircraft entering RWY 10R to utilize the full length of the runway.

Expect increased surface congestion on TWY E.

G TWYs F and F1 Realignment of TWYs for Runway Incursion

Mitigation (RIM) Program. Spring 2020 Upcoming Project to realign TWYs in order to rectify deficiencies. Impact will be when the new TWYs are constructed to touch the RWYs.

Return to Table

of Contents No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined SFO (3 of 3)—San Francisco International Airport Q2 2019 Airport Construction Impact Report

IATA Level 2

Figure (page 62)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Project Description of Work Estimated Dates Status Impact Notes

No projects at this time

Return to Table of Contents

SLC—Salt Lake City International Airport Q2 2019 Airport Construction Impact Report

Figure (page 63)

Additional Airports, Impact Summary, Carrier Distribution Q2 2019 Airport Construction Impact Report Key:

Alaska-ASA

American-AAL

Cathay Pacific-

CPA

Delta-DAL

Federal Express-

FDX

Grant Aviation-

GUN

JetBlue-JBU

NetJets-EJA

Other *less than

4%

Ravn Alaska-RVF

Southwest-SWA

United Parcel

Service-UPS

United-UAL

2019 2020 2021 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANC

PBI No capacity effect Reduced Capacity and Delay impact Reduced Capacity and Greater Delay Impact To be determined Return to Table of Contents

Figure (page 64)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A RWY 15/33 & TWYs

B TWYs S & K

C TWYs G1 & Z

Project Description of Work Estimated Dates Status Impact Notes

A RWY 15/33 & TWYs

Runway 15/33 reconstruction.

TWY Q will be reconstructed and relocated North

of its present position.

TWY F Reconstruction.

05/01/2019 to 09/30/2019 Upcoming

TWYs K, L, and S will remain open and available to cross at he North end and South end of the runway.

TWY F will remain open with half-width operations

in 6 phases. Miles in-trail and speed restrictions expected at arrival gates into ANC.

May require call for release of aircraft departing

from Alaska.

B TWYs S & K TWYs S and TWY K reconstruction.

TWY K will be reconstructed and relocated to the

North. 2020 TBD Upcoming

C TWYs G1 & Z TWY G1/Z East/West extension reconstruction. 2021 TBD Upcoming

Return to Table of Contents

ANC—Ted Stevens Anchorage International Airport Q2 2019 Airport Construction Impact Report

Figure (page 65)

2019 2020 2021

Project JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A Northeast Airfield & TWY C

B RWYs 14/32 and 10L/28R

Project Description of Work Estimated Dates Status Impact Notes

A Northeast Airfield & TWY C

Stage 1, TWY C closed for rehabilitation from TWY

H to TWY F and TWY G.

Stage 1 - 7/8/19 to 9/20/19; Stage 2 - 9/21/19 to

10/5/19

Stage 3 - 10/6/19 to 11/4/19; Stage 4 - 11/5/19 to

12/12/19

Stage 5 - 12/13/19 to 1/12/20; Stage 6 - 1/30/20 to 4/1/20

Stage 7 - 4/2/20 to 5/16/20; Stage 8 - 5/17/20 to

5/30/20

Stage 9 - 5/31/20 to 6/5/20; Stage 10 - 6/6/20 to

6/15/20

Stage 11 - 6/16/20 to 6/25/20; Stage 12 - 6/26/20 to 10/23/20

Stage 13 - 10/24/20 to 2/23/21; Stage 14 - 2/24/21 to 5/4/21

07/08/2019 to 05/04/2021 Upcoming No delays expected.

B RWYs 14/32 and 10L/28R RWY 14/32 + 10L/28R closed for repair and maintenance. Summer 2019 Upcoming RWY 10L/28R limited nighttime closures from 1030L to 0530L.

RWY 14/32 single nighttime closure approx. 2 hours.

Return to Table

of Contents

PBI—Palm Beach International Airport Q2 2019 Airport Construction Impact Report

Figure (page 66)

Source: Federal Aviation Administration — www.faasafety.gov. Reproduced from the published record; FlightPush adds formatting only.

Author: Compiled by: AJR-G5 POC: ted.sandstrom@faa.gov

FAASTeam library-192349